Every job on this page was planned and carried out by our own team. Each one sets out the crane, the rigging, the ground conditions and the people we put on site, so you can judge the work rather than the claims.
No projects match that filter yet. Show every project.
Feeding a Hotel Steel Frame in Hounslow with a Tower Crane and Mobile Cranes
A Jaso J80PA tower crane, mobile cranes and a mini crane on a light steel frame hotel at Lampton Road in Hounslow, inside Heathrow's airspace.
View ProjectLifting a Van Out of a Lake for ITV’s Vera with a 50te Crane
We supplied a 50te crane to ITV Studios for the crime drama Vera, lifting a van out of a lake at Greenfoot Quarry, County Durham, once the light...
View ProjectLifting a 24te Pipe Bridge Over Alwent Beck with a 250te Crane
We lifted a 28m long, 24te prefabricated pipe bridge from its laydown area and landed it in its final elevated position across Alwent Beck, using a 250te crane...
View ProjectReplacing Rooftop Plant on a 64m Building with a 230te Crane
We shifted redundant plant out of a rooftop plantroom on a 64m building in Newcastle and lifted it down with a 230te crane and offset fly jib, then...
View ProjectOffloading and Standing Up 12 Tanks in a Factory Pit with Pick and Carry Cranes
We offloaded twelve 7te tanks at a new foam factory in Swindon, carried them through a tight opening with electric pick and carry cranes, then lowered them into...
View ProjectLoading Two 60te Rail Machines for Export with a Tandem Crane Lift
We loaded two 60,000kg rail machines onto transport for export in a single day, using a tandem lift with a Demag AC 100-4L and a Terex AC 140...
View ProjectLifting and Transporting the 136-Year-Old Lifeboat The Bedford with a 50te Crane
We lifted and shifted The Bedford, a 136-year-old lifeboat, and her carriage into a restoration workshop in South Shields, then returned when she was restored to take her...
View ProjectReplacing a Magnetic Belt Conveyor Through a Roof at 68m Radius with a 450te Crane
We created a roof opening, lifted out an old magnetic belt conveyor and lifted in its replacement at 68m radius with a 450te crane, then reinstated the roof.
View ProjectLifting a Scaffolded Temporary Roof into Place at up to 77m Radius with a 300te Crane
We lifted prefabricated scaffold roof sections, up to 42m long, onto a gymnasium at Tidworth Garrison as a temporary roof during a refurbishment, then lifted them all back...
View ProjectLifting ASHPs, an AHU, a HRU and Windcatchers onto School Roofs with a Mobile Tower Crane
Over five visits to a new school in Whitley Bay we lifted ASHPs, an AHU, a HRU and windcatchers onto several roofs with a 50m mobile tower crane,...
View ProjectLifting AHUs into a Rooftop Plantroom with a 60m Mobile Tower Crane
We lowered air handling units through the one gap in a rooftop plantroom's steelwork in Blyth with a 60m mobile tower crane, then raised them onto their big...
View ProjectRelocating a Pin Factory from Bradford to Mexico, Italy and the USA
We moved every machine out of a pin factory in Bradford and loaded it onto transport for relocation to Mexico, Italy and the USA, including presses up to...
View ProjectDismantling Concrete Panels at BAE Systems Farnborough with a 220te Crane
We supplied labour for soft strip-out works at BAE Systems in Farnborough and dismantled heavy concrete panels from the building with a 220te crane in three positions, in...
View ProjectReplacing Glulam Trusses with Steel at Haggerston Castle with a 250te Crane
At Haggerston Castle we propped and cut out the old glulam trusses on both gable ends, lifted in new steel trusses with a 250te crane and erected further...
View ProjectDemolishing a Redundant Commercial Building in Cleethorpes with a 50te Crane
We dismantled and demolished a redundant commercial building in Cleethorpes with our own 50te crane, plant and people, and handed the site back clear within four weeks.
View ProjectLifting 24te Overhead Cranes into a New Warehouse with a 220te Crane
We lifted two 24te overhead crane units through a roof opening and onto their tracks in a new warehouse for a steel stockist near Thirsk, using a 220te...
View ProjectMachinery Installation and Steel Erection for a Leather Factory with Cranes up to 300te
Over six months we provided contract lifts with cranes up to 300te, steel erection, machinery movement and daywork labour for a new leather manufacturing facility in Peterborough.
View ProjectSteel Erection for Student Accommodation in Newcastle with a 50te Crane
We erected the steel frame for a student accommodation building on Union Street in Newcastle with our own 50te crane, MEWPs and steel erectors, working to the fabricator's...
View ProjectDismantling a Redundant Batching Plant at the Port of Tyne with a 50te Crane
As principal contractor, we dismantled a redundant concrete batching plant and its associated structures at the Port of Tyne with a 50te crane, removed all the scrap as...
View ProjectRelocating a Brickworks Factory with a Franna Pick and Carry Crane
We relocated a brickwork factory as a complete package over three weeks: strip-out, lifting with a Franna pick and carry crane, transport and reassembly at the new site.
View ProjectLifting an MRI Scanner Out of Darlington Memorial Hospital with a 300te Crane
We lifted an MRI scanner out through the roof of Darlington Memorial Hospital with a 300te crane, working beside a live A&E entrance, and later returned to lift...
View Project