Nationwide Plantroom Strip Outs
Plant rooms sit at the heart of every commercial and industrial building – housing the boilers, heating and cooling plant, air handling units, generators, pumps and electrical switchgear that keep a site running. When that plant reaches end of life, is being upgraded, or a building is being refurbished or cleared, it needs to come out safely, cleanly and with the least possible disruption.
We strip out and remove redundant mechanical and electrical plant from hospitals, universities, data centres, factories, warehouses, office blocks, and commercial premises across the UK. Working within confined, service-heavy environments, our teams safely dismantle and remove plant using the right cutting, lifting and rigging methods for the space.
What area do we cover?
We are spread out across the UK and that gives us nationwide coverage. This means we are able to carry out surveys and take on plant room strip out work wherever you need us.
Not ready for a site visit yet or just budgeting?
Don’t worry, we can do a desktop survey to assess what is needed and provide you with a quote. We can usually do this on the same day you get in touch with us.
What sort of plantroom strip out work do we undertake?
At Synergy Lifting, we understand the complexities of stripping out plant rooms – the confined spaces, the live gas, water and electrical services, and the specialist plant that has to come out safely.
What sectors do we provide plantroom strip out services to?
Our plantroom strip out team are working in a range of sectors across the UK, find out what we can do for you.
Contact us
Get In Touch
Please leave a few details and a member of our plantroom strip out team will be in touch to discuss your requirements in more detail.
Our Plantroom Strip Out Process
Synergy Lifting are proud to provide a carefully thought out and thoroughly planned plantroom strip out service. Regardless of scale, each project follows a structured process built around key stages.
Site Visit
The first step is for Synergy Lifting's plantroom strip out team to conduct a site audit to produce documentation for the following steps.
Quotation
Following our initial site visit, our team will produce a detailed quotation with an outline of our scope of works and timescales.
Site Assessment
Our team will undertake our full site assessment to establish HSE requirements and finalise our method for lifting operations, dismantling etc.
Risk Assessment
With safety being our priority in all of our operations, a site-specific risk assessment will be created to go alongside our method statement.
Method Statement
Our team will write up a site-specific method statement detailing our safe working procedures to carry out our operations.
Highways and Councils
Where required, we can work with local councils to arrange any necessary permits or road closures if heavy/wide loads need transporting off site.
Insurance Covers
Synergy Lifting's full comprehensive insurance covers will be presented to the client for review before site operations commence.
Project Management
The plantroom strip out work will be undertaken by Synergy Lifting’s qualified personnel utilising our specialist plant and equipment.
Handover
We will dispose of all waste materials in a safe and environmentally friendly manner with scrap value offset against the price of the work.