Overview

Steel erection in Birmingham and across the West Midlands

Central Birmingham steel mostly goes up on residential and office plots near Colmore Row and Broad Street, where the crane stands in the street under a road closure. Further out, in Aston, Tyseley and the estates by the M6 and M42, manufacturers and distribution firms add extensions and platforms or build new units on sites with room for a crane.

On the estates that means mezzanines, canopies, extensions and platform steel. In the centre it is taller frames, lifted from a crane standing in the street. Work comes from Sutton Coldfield down to Selly Oak, west into Sandwell and out through Solihull to Coleshill in North Warwickshire. Drawings and photographs are enough to price a new unit on a clear plot the same working day.

What steel erection covers

We take the steel your fabricator supplies and stand it up: the frame bolted, lined and levelled, then bracing, secondary steel and light gauge LFS or SFS framing. Old frames come down too, when a works is being replanned. A factory owner can also hand us the wall and roof sheeting on the same order.

What we do

What we erect in Birmingham

Structure Where it goes up What sets the method
Frames and light gauge infill for central schemes Residential and office plots around Colmore Row and Broad Street How much of the frame each crane position reaches
Platforms, mezzanines and hall extensions Automotive supplier factories across the West Midlands Lines still producing beside the steel
Lean-to bays and replacement canopies Older works at Aston, Witton and Tyseley Low eaves and the condition of the columns being tied into
Portal frames and racking steel Distribution units near the M6 and M42 junctions Yard traffic and the order the bays go up
Rooftop plant decks and link steel Hospital, university and public buildings The hours the estates team allows
Frames taken down for re-erection Units being cleared or replanned The release order and the match-marks

The steel erection and dismantling service page explains each stage.

Get a quote

Tell us about your project

Send us the details and we will come back with a quote, usually the same day for a desktop survey.

Or call 0121 468 9974

    Get in touch

    Your Steel Erection or Dismantling Project

    Sectors

    Where we work in and around Birmingham

    Birmingham enquiries come from all round the city.

    Central plots off Colmore Row and Broad Street

    Frames, infill walls and rooftop plant steel go up on apartment, hotel and office schemes built out to the plot boundary. See our construction sector page.

    Warehouses from the M42 to Coleshill

    Portal frames for new distribution units, then mezzanines and dock canopies, go up along the motorway corridors while neighbouring yards keep trading. See our industrial sector page.

    Platforms for component makers

    Platforms, mezzanines and hall extensions are added to automotive component plants, timed around the lines still running. See our automotive sector page.

    Older works at Witton and Tyseley

    Engineering and metalworking buildings here and in Aston take new bays, replacement canopies and mezzanine offices, often under low eaves and with tight yards. See our industrial and plastics and metals pages.

    Link bridges for hospitals and universities

    Rooftop plant decks and link bridges go onto hospital, university and public buildings that stay open, in slots that suit wards and teaching. See our healthcare and pharma and education pages.

    Possessions and outage windows

    Equipment frames beside the railway and generator platforms at substations and data centres go up in hours the operator releases. See our rail and data centre infrastructure pages.

    Planning

    Access and planning for steel erection in Birmingham

    Planning a Birmingham frame comes down to these:

    • Trailers held until the crane is free. Central plots have nowhere to set steel down, so each trailer is packed in erection order and waits off site until the crane is ready. Every wagon and crane entering the Clean Air Zone is checked for compliance first.
    • Street closures and oversail. A crane standing in the road needs a closure from Birmingham City Council, or from Sandwell or Solihull in their boroughs, plus the neighbours’ agreement where the jib swings over them. We apply and set out the traffic management and road closure.
    • Cellars, culverts and canal walls. Under the centre there can be old cellars, culverts or a canal wall, and the older estates are on made ground, so outrigger loads are checked and spread on mats.
    • Nothing left free-standing. At the end of each shift the part-frame is braced, with permanent members where they are in and guy wires to ground anchors where they are not.
    • Panels in a breeze. Towers in the centre throw the wind about, so LFS panels and light members are lifted after the supervisor reads the wind at working level.

    Alterations

    Alterations, mezzanines and dismantling

    Older works at Aston and Tyseley take much of Birmingham’s new steel, and their columns, bases and connections are checked on site before anything is ordered. Under a low Tyseley roof no jib can get over the eaves, so a mezzanine there is built up from the shop floor.

    Dismantling runs the other way, to a release order that keeps the standing part braced. Members due to go up again are match-marked and recorded, so the frame arrives at its next address ready to rebuild.

    Coverage

    Postcodes and areas we cover

    We cover every B postcode and the West Midlands districts around it:

    • Birmingham: city centre, Broad Street, Digbeth, Ladywood, Edgbaston, Aston, Witton and Perry Barr
    • South and east: Selly Oak, Bournville, Kings Heath, Moseley, Hall Green, Tyseley, Yardley and Sheldon
    • North: Erdington, Great Barr and Sutton Coldfield
    • Black Country and beyond: West Bromwich, Oldbury, Smethwick, Halesowen, Solihull, Coleshill, Bromsgrove and Redditch

    We erect steel right across the UK.

    Why Synergy

    Why Birmingham firms choose Synergy Lifting for steel erection

    • Frames for the city’s new schemes. New buildings in the centre get their steel and light gauge infill erected floor by floor.
    • Lean-to bays for the older estates. Works at Aston, Witton and Tyseley get extensions and replacement canopies tied into frames that are checked first.
    • Site changes go back to the planner. Our appointed person and the gang work from the same sequence, so a change on site is re-planned before the next lift.
    • Qualified and accredited. CPCS and CSCS carded operatives, lifts planned to BS 7121 by an appointed person, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    Process

    How a steel erection job works

    1. Drawings and a steel schedule come first, with the address and the weeks set aside for steel.

    2. A site visit then marks crane standings and checks the ground, the delivery approach, lay-down and overhead lines.

    3. The lift plan follows from our appointed person, and the method statement and risk assessment set out the bracing that holds each stage.

    4. Wagons are loaded at your fabricator’s yard with the first members to go up on top.

    5. After erecting, bracing, lining and levelling, the gang hands the frame to the next trade on your programme.

    FAQs

    Common questions

    Yes. The lift plan and delivery order are fixed before the shutdown starts, so steel arrives on the first morning in erection order and the line area is clear for restart. Send the shutdown dates with the drawings.

    We ask for any record of the basements, check the bearing at each outrigger position and spread the load on mats, or move the crane to firmer ground where a void sits under a pad.

    We do. An appointed person plans every lift to BS 7121: where the crane stands, what it can place from each position, and how the frame stays stable at every break in the work. The same gang then rigs and erects to that plan.

    Yes. Mezzanines and internal platforms go up with gantries, jacking equipment and our electric pick and carry crane, which works indoors without fumes. The steel comes in through a door and is lifted into place inside the building.

    Get a quote

    Get a quote for steel erection in Birmingham

    Go to the form

    With the drawings, steel schedule and programme for your Birmingham frame, include the postcode and a photograph of the plot from the road. If new steel meets an existing building, tell us when it was built.

    We also provide steel erection in Wolverhampton, Coventry, Leicester and Derby. See all the steel erection locations.