Hotel and venue operators on the front call us when a boiler room or roof chiller wears out. So do estates teams in health, care and council buildings, and engineering and food firms whose energy centres need new plant. Guests and staff stay in while the old plant is taken apart and carried out, and the replacement goes onto its bases when the M&E contractor is ready for it. On the front, wind off the Irish Sea sets the dates for roof lifts.

We cover Blackpool, Bispham, Marton, Cleveleys, Poulton-le-Fylde, Fleetwood, Lytham St Annes and Kirkham. Send photos and we usually quote the same day, working nights, weekends and shutdowns where needed.

What a strip out covers

We take out the heating, cooling, air handling and electrical plant and the dead pipework and steel between them, each reduced to pieces its route can pass. The new plant then lands level on its bases for the M&E contractor’s engineers, who handle the pipework, electrical connections and commissioning.

What comes out of a Blackpool plant room

Plant Where it sits How it comes out
Modular condensing boilers and flues Cellar boiler rooms in older buildings Flue down in lengths, modules unbolted and carried up
Chillers and dry air coolers Flat roofs and rear yards Picked whole from the road, or fans and coils lifted off first
Kitchen and hall air handling units Roof plant decks and high-level plant rooms Casing panels released, unit lowered in fan and coil sections
Cylinders, calorifiers and booster sets Ground floor plant rooms behind kitchens Rolled out on skates, shells opened cold where the door is too narrow
Standby generators, transformers and LV panels Switchrooms and external enclosures Jacked up and gantried to the door, panels parted at their joints

Before weights, we look at which item has the tightest trip to the wagon. That piece sets the method. See the plant room strip out service page.

Contact us

Get In Touch

Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.

    Where we work in and around Blackpool

    Blackpool strip outs start on the front and run inland.

    Hotels from North Shore to South Shore

    Worn boilers and roof chillers leave the town’s hotels, where the plant room is as likely a cellar as a flat roof. Heavy days go into the quieter months. See our HVAC sector page.

    Halls and leisure buildings on the promenade

    Air handling units and chillers serving big halls come out overnight or in the closed season, with the public floor below empty.

    Health and care estates across the Fylde

    Heating plant and standby generators leave hospital and care buildings that never close, on the estates team’s timetable. See our healthcare and pharma page.

    Council offices and public buildings in the town centre

    Heating and air handling plant leaves council offices and libraries in the centre at weekends, when the counters are shut.

    The estates off the M55

    Boiler houses serving units on Blackpool and Fylde Industrial Estate and Clifton Trade Park go dead during the change, so the job fills a shutdown weekend. See our industrial sector page.

    Food plants and substations along the coast

    Refrigeration plant and steam boilers leave Fylde food factories in a planned stop, and coastal switchgear changes over inside an agreed outage. See our food and beverages and power and renewables pages.

    Access and planning for a Blackpool plant room strip out

    Each Blackpool quote rests on five answers.

    • Street crane or inside route. A street crane costs hire and a closure but saves time. Carrying plant down inside costs labour, lift bookings and extra shifts. Near the seafront, wind and the tramway’s overhead lines limit where and when a crane works, so a fallback date goes in the plan.
    • People still in the building. Guests and staff stay put, so hours, noise limits, the lift we use and a protected route are cleared with the building manager.
    • Timber floors and cellars. Older buildings on the front can have both under the route, so we check it and plate it where needed.
    • Closing the road. Where a crane needs road or pavement, we book the traffic management and road closure through Blackpool Council, or Lancashire County Council for roads in Fylde and Wyre, and find a spot to stand the old plant.
    • How many pieces each unit becomes. Every split at a flange, casing joint or boiler section lightens the heaviest piece, and its weight decides between a crane, a gantry or chain blocks.

    Before anything is lifted

    Our crew starts on dead, empty plant. Each system is signed over to us in writing by your M&E contractor once it is isolated, drained and locked off. Any refrigerant has to be recovered first, by an F-gas certified engineer. Asbestos work, from the survey to any licensed removal, is finished first.

    At quoting stage the programme shows our dates sitting behind all three. Hotel work on the front bunches into the same few quiet months, so we ask for those dates at first contact.

    Postcodes and areas we cover

    We cover every FY postcode, including:

    • FY1 to FY2: the town centre, the promenade, North Shore and Bispham
    • FY3 to FY4: Layton, Marton, Stanley Park, South Shore, Squires Gate, Progress Way and Clifton Trade Park
    • FY5 to FY7: Thornton-Cleveleys, Poulton-le-Fylde, Knott End and Fleetwood
    • FY8: Lytham, St Annes, Ansdell and Fairhaven
    • Wider area: Kirkham, Wesham, Freckleton, Preston, Garstang and Lancaster

    We strip out plant rooms right across the UK.

    Why Blackpool firms choose Synergy Lifting for plant room strip out

    • Hotel roofs worked from the street. Changing chillers and air handling units on the town’s hotels and venues is regular work for our crews, from a closed road or a tight rear yard.
    • Dates that follow the M&E programme. Our start follows the isolations and our finish the new plant’s delivery, and the site manager hears when either moves.
    • Crane, riggers and wagons under one order. The crane outside, the crew in the plant room, the haul away and the new plant set on its bases all come from us.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a plant room strip out works

    1. Describe the plant and where it sits, with photos of the way out.
    2. A survey settles how each unit leaves and where it comes apart.
    3. The lift plan and RAMS come from us, dated to start once the plant is isolated.
    4. Riggers strip out the old plant and it leaves on our wagons.
    5. The replacement goes back into the cellar or up to the roof deck, set on its bases ready for connection.

    Common questions

    When in the year should a seafront hotel book its strip out?

    Outside the season, when fewer rooms are let. Winter brings stronger wind off the Irish Sea, so a crane lift from a seafront roof carries a second date agreed at booking.

    Our boiler room is in the cellar of an older hotel. How does the old boiler get out?

    Up the cellar stair or through a pavement hatch, in pieces the opening will pass. Sectional boilers unbolt and shells are cut cold, and the new boiler comes down the same way in modules.

    Can the building stay open while the plant comes out?

    Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.

    Who isolates and drains the plant before you start?

    Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.

    Get a quote for a plant room strip out in Blackpool

    Email or phone with the plant, where it sits and what replaces it, plus photos of the room, the stairs and any cellar hatch.

    We also provide plant room strip out in Preston, Wigan, Liverpool and Warrington. See all the plant room strip out locations.