Plant room strip out in Warrington and across Cheshire
Air handling units, chillers and boilers come due for replacement in Warrington’s health, college and school buildings, in offices at Birchwood and in the town centre, and in the energy centres that keep works running along the canal and in Halton. From canal-side boiler houses to Birchwood roofs, we clear the old plant and land what replaces it, on the M&E contractor’s timetable.
We cover Warrington, Birchwood, Stockton Heath, Appleton, Great Sankey, Penketh, Lymm and Culcheth, with Widnes and Runcorn. Photos of the plant and the Omega yard or town-centre street it would leave by usually get a desk quote the same day. We work nights, weekends and shutdowns.
What a strip out covers
Our part runs from a dead, drained system to new units level on their bases. Everything in the room that is being replaced leaves with us, down to the old pipework and steel. The M&E contractor keeps the new pipework connections, electrical work and commissioning.
What comes out of a Warrington plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Chillers and condensers | Shed roofs and plant decks | Craned clear from the yard, or cut into modules |
| Boilers and calorifiers | Boiler houses and basements | Broken into sections inside the room, each piece skated out |
| Air handling units | Roof decks and first floor plant rooms | Parted into fan, coil and casing sections, lowered one by one |
| Pump sets, pressure units and sectional tanks | Plant rooms and tank rooms | Trolleyed off their bases, sectional tanks unbolted by the panel |
| Intake switchgear, transformers and generators | Generator and intake rooms | Drawn out on skates under a gantry, loaded at the door |
| Redundant pipework and steelwork | Ceilings, risers and trenches | Cold cut to lengths that suit the route, bundled for the wagon |
What sets the method is the route, so we plan around the piece with the worst way to the road. The plant room strip out service page has more.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Warrington
The work runs from the canal-side works to the motorway parks and west into Halton.
Boiler houses in the canal-side works
Old boilers and compressors come out of engineering and process works along the canal at Latchford and Westy, in buildings older than the plant inside them, and a roof opening can be the only way out. See our industrial sector page.
Shed roofs on Omega and near the junctions
Chillers and air handling units come off the big shed roofs by a crane on the yard while the docks keep loading. See our HVAC sector page.
Health, college and school estates
Chillers and air handling units come out on hours the estates team sets. The old unit stays in service until the new one is running, and school jobs sit in the holidays. See our healthcare and pharma and education pages.
Data halls and offices at Birchwood
Cooling units, UPS and standby generators leave the data and technology businesses on Birchwood Park over raised floors on a protected route. See our data centre infrastructure page.
Utility plant in Widnes and Runcorn
Boiler and cooling plant serving the chemical producers in Halton comes out inside the site’s permit system and to its shutdown dates. See our chemicals sector page.
Access and planning for a Warrington plant room strip out
On a Warrington survey we look at:
- Swing bridges, lanes and lay-down. A crane standing in the street takes a lane or a car park, and the old plant needs somewhere to wait for the wagon. South of the Ship Canal we pick a swing bridge the crane and wagons can legally cross. We apply for the traffic management and road closure through Warrington Borough Council, or through Halton for a site in Widnes or Runcorn.
- Hours, noise and a lift of our own. Access hours, noise limits, a protected corridor and a lift for our use are agreed with the building manager.
- Crane off the roof, or skates down inside. The crane is the dearer day and the shorter job. Taking plant down inside costs days, with lifts, stairs and more hands on every piece.
- Split points and the heaviest piece. Boilers split into sections and air handling units at panel joints, and the heaviest piece left sets the crane size, if one is needed.
- The floor under the skates. Older canal-side works floors are checked along the route, and yards near the Mersey can sit on soft, filled ground, so plates and mats go down where the figures ask.
Before anything is lifted
Before our first cut, each system is cut off, drained down and locked under the M&E contractor’s written sign-off, within the permit system on a Halton chemical site. Refrigerant is recovered by an F-gas certified engineer. Any asbestos the survey finds goes to a licensed contractor who finishes before our crew enters.
Our quote sets each of those dates beside ours, and if one of them moves, we reissue the list to everyone on it.
Postcodes and areas we cover
We cover every WA postcode across the town and the district:
- Warrington: town centre, Bank Quay, Latchford, Westy, Westbrook, Orford, Padgate and Birchwood
- South of the canal: Stockton Heath, Grappenhall, Appleton, Walton and Lymm
- North and west: Great Sankey, Penketh, Burtonwood, Winwick and Culcheth
- Halton and beyond: Widnes, Runcorn and Frodsham
- Wider area: Newton-le-Willows, St Helens, Northwich and Knutsford
We strip out plant rooms right across the UK.
Why Warrington firms choose Synergy Lifting for plant room strip out
- Hours set by the building. Hospital, school and office jobs in Warrington run to the hours the estates team or landlord gives us.
- New plant booked in behind the old. Delivery of the replacement is timed to the day the room is clear, so nothing waits in the yard.
- One firm for the removal and the new plant. Our crane outside and riggers inside remove the old plant and land the new on its bases.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Other Warrington services that sit alongside a strip out:
How a plant room strip out works
- Give us the make and size of the old plant, where it sits and photographs of every door on its way out.
- On site we settle the way out and how far each unit is broken down.
- A lift plan goes out with our risk assessment and method statement, and our dates go in after the isolations.
- Our crew strips the plant out and loads it for removal.
- The replacement is levelled on its bases, and the connections pass to the M&E contractor.
Common questions
Our chillers sit on a shed roof at Omega. Will the docks have to stop while they come off?
No. The crane stands on part of the yard fenced off from trailers, and the lifts go between shifts or at a weekend. The new units go up on the same visit.
How does an old boiler get out of a brick boiler house in one of the canal-side works?
A sectional boiler comes apart into pieces a skate will carry, and a large shell boiler leaves through a roof opening to a crane outside. The survey settles which before we quote.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Warrington
- Phone: 0161 568 8241
- Email: warrington@synergy-lifting.co.uk
Email us what the plant is, where it is in the building and whether new units follow it, with pictures of the room and the doors it would leave by.
We also provide plant room strip out in Wigan, Manchester, Liverpool and Stockport. See all the plant room strip out locations.