Scroll to top

Steel Erection Peterborough


Extra bays, mezzanines and equipment steel for distribution and rail sites along the A1, with crane set-ups planned for peat and made ground around Peterborough.

Packages

Steel + more

Cladding, roofing and demolition too

Coverage

Peterborough

PE postcodes

Quotes

Same day

For most enquiries

Overview

Steel erection in Peterborough and across the Fens

Peterborough steel comes from the trades along the A1 and the East Coast Main Line: distribution sheds needing extra bays and mezzanines, rail and utility sites adding equipment steel, and Fen processors wanting new stores. Outside the city, much of that steel stands on peat or made ground.

Most frames we put up here are portal sheds, mezzanines, extensions, canopies, light gauge walling or plant support steel, and we supply the cranes for larger multi-bay and multi-storey frames. Work comes from Orton, Hampton and Werrington, and from Whittlesey, March, Wisbech and Stamford. With drawings and photographs in hand, we can price a straightforward portal frame the same working day.

What steel erection covers

Our gangs erect the steel your fabricator supplies, then bolt up, line and level the frame and fit its bracing and secondary members. Light gauge LFS and SFS framing sits in the same package, as does dismantling existing steel for reconfiguration or reuse. A Fen grower adding a store may want it clad and roofed, and we can take that on with the frame.

What we do

What we erect in Peterborough

Structure Where it goes up What sets the method
Portal frame packhouses and crop stores Farm and processing sites out on the Fens The bays one crane set-up covers, and bracing the first of them
Warehouse extensions Distribution parks on the A1 and A47 corridor Tying into the old frame while the dock doors stay in use
Equipment support steel and walkways Generation, water and recycling sites Outage dates and live plant around each new member
Mezzanines and machine platforms Engineering units at Fengate and the city’s estates Door width, clear height and the slab
Light gauge walling and canopies Housing and commercial schemes at Hampton and in the centre What a single crane position can reach
Frames taken apart for reuse Buildings being reorganised or cleared Supporting the rest of the frame as members are released

Our steel erection and dismantling service page explains each stage.

Get a quote

Tell us about your project

Send us the details and we will come back with a quote, usually the same day for a desktop survey.

Or call 01733 592 477

    Get in touch

    Your Steel Erection or Dismantling Project

    Sectors

    Where we work in and around Peterborough

    Peterborough steel work falls into six settings.

    Extra bays for the trunk road sheds

    Bays, dock canopies and mezzanine floors are added to warehouses on the parks off the A1 and the A47 while they keep trading. See our industrial sector page.

    Produce stores out on the Fens

    Portal frame stores, packhouse extensions and platforms for grading and handling lines go up for growers and processors around Whittlesey, March and Wisbech. See our food and beverages page.

    Workshop bays at Fengate

    New bays, machine platforms and mezzanine offices are built for manufacturers on the Fengate estate and the city’s other employment areas. See our plastics and metals page.

    Generation, water and recycling sites

    Access walkways and support steel for new equipment go in at power, water and recycling sites around the city during the outages their operators set. See our power and renewables and waste and recycling pages.

    Railway canopies and equipment frames

    Canopies, equipment frames and small buildings beside the main line are put up inside possessions with fixed start and finish times. See our rail sector page.

    New buildings at Hampton and the city edge

    Frames and light gauge walling go up for housing, retail and commercial schemes in the southern townships. See our construction sector page.

    Planning

    Access and planning for steel erection in Peterborough

    Our planning for a Peterborough frame covers five points:

    • Peat, made ground and dykes. Fen soils look firmer than they are, and drains run beside many access tracks. Bearing is confirmed at each outrigger and the mats sized to it, and on the softest plots the ground also limits which crane can come.
    • Open ground and wind. Flat Fen sites give little shelter, so large LFS panels and light rafters are lifted only when the gusts measured on site suit the load and its rigging.
    • Road space in city or county. Inside the city we apply to Peterborough City Council, and elsewhere to Cambridgeshire or Lincolnshire County Council, or North Northamptonshire Council around Oundle, and we set out the traffic management and road closure the crane or trailer needs.
    • Each stage left standing. The sequence leaves a braced part-frame at every stop, with guys or temporary bracing designed in wherever the permanent bracing comes later.
    • Trailers loaded to our sequence. Your fabricator packs each trailer in erection order, so a site with little hard standing can take steel straight from the bed.

    Alterations

    Alterations, mezzanines and dismantling

    When new steel ties into a building that keeps working, we survey the existing frame first and check the connections the new members will use. Mezzanines and platforms that no crane can reach, such as a floor over a packhouse grading line, are raised from inside on gantries and jacks or with the electric pick and carry crane, which produces no fumes near food.

    For steel coming down, the order is worked out member by member so the frame left behind stays braced, and each piece bound for another site carries its match-mark before the bolts come out.

    Coverage

    Postcodes and areas we cover

    We cover every PE postcode and the districts around the city:

    • Peterborough: city centre, Fengate, Orton, Hampton, Werrington and Whittlesey
    • The Fens: March, Chatteris, Wisbech, Ramsey and Spalding
    • South and west: Stamford, Oundle, Bourne, St Neots, Huntingdon and St Ives
    • Wider area: Corby, Kettering, King’s Lynn, Grantham, Boston and Cambridge

    We erect steel right across the UK.

    Why Synergy

    Why Peterborough firms choose Synergy Lifting for steel erection

    • Stores and packhouses for Fen growers. Processors and growers get portal frame stores and packhouse bays erected around the dates their season allows.
    • Planning and erecting kept together. Crane positions come from our appointed person, and the riggers who land each member also bolt it, so one sequence runs from the plan to the finished frame.
    • Steel timed to outages and possessions. Rail, utility and recycling work is sequenced to finish inside the possession or outage the operator grants.
    • Qualified and accredited. CPCS and CSCS carded operatives, lifts planned to BS 7121 by an appointed person, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    Process

    How a steel erection job works

    1. We need the drawings and steel schedule, plus the address and the dates your programme holds for steel.

    2. A site visit covers where the crane can stand, the ground, the trailer route, space for lay-down and any lines overhead.

    3. The appointed person’s lift plan comes out of that visit, together with a method statement and risk assessment that deal with stability at each stage.

    4. Your fabricator and our planner fix the sequence the loads travel in.

    5. The gang raises, braces, lines and levels the steel, then passes the frame to the following trade.

    FAQs

    Common questions

    Usually, yes. We check the bridge limit before quoting and choose a crane light enough to cross it that can still work from beside the building. Your fabricator splits the steel onto lighter trailers to match.

    Members are delivered, laid out and checked before the line stops, so crane time inside the shutdown goes on lifting and bolting. The lift plan shows at quote stage whether everything fits.

    We do. An appointed person plans every lift to BS 7121: where the crane stands, what it can place from each position, and how the frame stays stable at every break in the work. The same gang then rigs and erects to that plan.

    Yes. Mezzanines and internal platforms go up with gantries, jacking equipment and our electric pick and carry crane, which works indoors without fumes. The steel comes in through a door and is lifted into place inside the building.

    Get a quote

    Get a quote for steel erection in Peterborough

    Go to the form

    Along with the drawings and steel schedule, send the site postcode and your programme dates. For a farm or Fen site, a line about the lane in helps us choose the crane.

    We also provide steel erection in Cambridge, Northampton, Leicester and Milton Keynes. See all the steel erection locations.

    • Amazon
    • Brotje
    • ITV Studios
    • NG Bailey
    • Northern Structures
    • Schneider Electric
    • Spaans Babcock
    • Sulzer
    • Wates