Steel erection in Cambridge and across Cambridgeshire
In Cambridge we put up laboratory extensions, plant decks and platforms for research and technology firms, on buildings that stay occupied across the city’s science and business parks. New housing and commercial schemes on the edges of the city take frames and light gauge walling, and food and packing businesses across the Fens need stores and process platforms. In the historic centre, plant steel and small extensions go in from narrow streets full of cyclists.
On the science parks that means plant decks, mezzanines and extensions, and now and then a lab and office frame going up floor by floor. On the Fens it is more often a portal frame shed. Our gangs work from Histon down to Sawston, and further afield at Ely, Huntingdon, Royston and Newmarket. With drawings and photographs, a plain portal frame can usually be priced the working day they reach us.
What steel erection covers
We erect the steel your fabricator supplies: the frame is stood and bolted, then checked for plumb and braced, with secondary steel and light gauge (LFS or SFS) framing to follow. Frames already standing can be taken apart when a lab tenant moves on.
What we do
What we erect in Cambridge
| Structure | Where it goes up | What sets the method |
|---|---|---|
| Plant decks and rooftop platforms | Laboratory and office buildings on the business parks | Occupied floors below and the lifting hours the site allows |
| Laboratory and office extensions | Research buildings that keep working | Vibration near sensitive equipment, and the connections to the existing frame |
| Frames and light gauge walling | New housing and commercial schemes on the city’s edges | Crane positions across a larger, open plot |
| Packhouses and cold stores | Food and farm sites across Cambridgeshire | Where the crane stands in a working yard |
| Canopies and small extensions | Listed streets in the city centre | The one position a compact crane can set up in |
| Frames dismantled for reconfiguration | Units changing layout or tenant | Release order, and match-marks on pieces to re-erect |
Read more on our steel erection and dismantling service page.
Get a quote
Tell us about your project
Send us the details and we will come back with a quote, usually the same day for a desktop survey.
Or call 01223 790 068
Sectors
Where we work in and around Cambridge
Laboratories take the most steel in Cambridge, but not all of it.
Lab extensions for research firms
Plant decks, platforms inside labs and small extensions go up on research and biotech buildings across the science parks, at lifting hours agreed with facilities managers while the laboratories work. See our healthcare and pharma page.
Technology and data buildings
Generator and chiller support steel, plant platforms and mezzanines are erected for technology businesses on the business parks. See our data centre infrastructure page.
New neighbourhoods around the city
Housing and commercial schemes on the edges of Cambridge need frames, canopies and infill walling, usually on open plots. See our construction sector page.
Narrow streets in the historic centre
Plant support steel and small extensions go onto listed buildings, with the stonework and roofs protected along the lift route.
Stores and packhouses on the Fens
Farms and packers around Ely and Chatteris add crop stores and packhouses, and processing halls take new access platforms in their shutdowns. See our food and beverages page.
Lineside steel towards Ely and Newmarket
Canopies, platforms and equipment frames go up beside the railway inside possessions. See our rail sector page.
Planning
Access and planning for steel erection in Cambridge
Before a Cambridge delivery date is fixed, we work through the following:
- Part-built frames that hold themselves up. Every stopping point in the sequence leaves the steel stable, with temporary bracing or guys wherever the permanent bracing comes later.
- The A14 as the pinch point. Heavy loads come in on the A14 and M11, and the A14 decides arrival times. Loads are packed in erection order and called in to suit, and on a park with no room to store steel, members come straight off the trailer bed.
- Cyclists and Cambridgeshire County Council. Central streets carry heavy cycle traffic, so a crane or trailer on the highway needs a closure from the county council, with marshals and the traffic management and road closure we arrange.
- Fen and made ground. Outside the city, Fen peat and made ground can be much weaker than the surface suggests. We test bearing at every standing and choose mats to spread each outrigger’s load.
- Open country and panel lifts. The flat land around the city gives the wind a clear run. Sheeted panels and long purlins are the first lifts to stop, so each goes up only after a wind reading at working height.
Alterations
Alterations, mezzanines and dismantling
Laboratories and technology units in Cambridge stay occupied while a plant deck or mezzanine is added, and the first job is a survey of the existing frame where the new steel joins it. A crane has no way into a lab block, so members are carried through a door and lifted by the battery-powered pick and carry crane, which suits a clean building.
Where a tenant change means steel coming out, the lift plan covers the dismantling as closely as the erection. Temporary bracing goes in before a load-bearing member is released, and anything going back up is marked at each connection so it goes back the same way.
Coverage
Postcodes and areas we cover
We cover every CB postcode and the districts round the city:
- Cambridge: city centre, Cherry Hinton, Trumpington, Newnham and Chesterton
- Around the city: Great Shelford, Sawston, Milton, Histon, Waterbeach, Cottenham and Linton
- North and east: Ely, Soham, Newmarket and Haverhill
- Wider area: St Ives, Huntingdon, St Neots, Royston, Saffron Walden and Bury St Edmunds
We erect steel right across the UK.
Why Synergy
Why Cambridge firms choose Synergy Lifting for steel erection
- Plant decks and extensions on occupied labs. Research companies keep their laboratories running while new steel goes up alongside.
- Steel for the new schemes around the city. Main contractors on housing and commercial sites get frames, canopies and light gauge walling erected to their programme.
- Lift planning and erection in one team. The lift plan is written by our appointed person, and our own gang rigs and bolts the steel to it.
- Qualified and accredited. CPCS and CSCS carded operatives, lifts planned to BS 7121 by an appointed person, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
Services
More than steel erection
Cambridge steel work can link up with:
Process
How a steel erection job works
-
Your drawings get us started, along with where the site is and your programme.
-
Our visit to site fixes crane positions and checks the ground, the way in for trailers, room to lay steel down and any overhead lines.
-
Then the paperwork: our appointed person’s lift plan, plus a method statement and risk assessment that keep the frame stable at every stage.
-
The delivery order is fixed with your fabricator, so steel arrives as it will be erected.
-
Erection comes last: the frame is stood, braced, lined and levelled, and the following trade takes over.
FAQs
Common questions
Our building is on a narrow central street with one place a crane could stand. Is that enough?
It can be. We check what a compact crane can place from that spot, and anything beyond its reach is taken inside and raised there. Photographs of the street help.
Can our packhouse frame go up while the yard is still in use?
Yes. The crane and a fenced lay-down area are set away from your loading bays, and our trailers are booked between your own deliveries. Tell us how the yard runs when you send the drawings.
Who plans the lifts?
We do. An appointed person plans every lift to BS 7121: where the crane stands, what it can place from each position, and how the frame stays stable at every break in the work. The same gang then rigs and erects to that plan.
Can you erect steel where a crane cannot reach?
Yes. Mezzanines and internal platforms go up with gantries, jacking equipment and our electric pick and carry crane, which works indoors without fumes. The steel comes in through a door and is lifted into place inside the building.
Get a quote
Get a quote for steel erection in Cambridge
- Phone: 01223 790 068
- Email: cambridge@synergy-lifting.co.uk
To price steel for a Cambridge site, send the GA drawings, the postcode and your programme dates, and say whether to price the envelope too. If people will be working in the building, tell us which hours the site allows for lifting.
We also provide steel erection in Peterborough, Luton, Milton Keynes and Northampton. See all the steel erection locations.