Steel erection in Stoke-on-Trent and across Staffordshire

In Stoke, tile, tableware and sanitaryware makers add bays and plant platforms to old, low works buildings. Distribution operators on the A50 and A500 put in mezzanines and new sheds, and engineering firms on the city’s business parks extend their units. Old pit and marl-hole ground under many plots also shapes the crane set-up.

Alongside portal frames we put up lean-tos against old works walls and support steel for kilns and dryers, and we supply the cranes for larger buildings such as a new warehouse with a showroom and offices on two floors at the front. We work in all six towns, Tunstall and Burslem through to Fenton and Longton, and out to Kidsgrove, Newcastle-under-Lyme, Leek and Stone. Quotes for a new shed by the A50 are worked up from drawings and photographs, most of them inside the same working day.

What steel erection covers

The work runs from the frame itself, bolted up, lined and levelled, to its bracing and secondary steel, together with LFS and SFS framing. We dismantle existing steel too, often an old bay making way for a new kiln line. When a kiln is being replaced, we can move the new one in once its steel is up.

What we do

What we erect in Stoke

Structure Where it goes up What sets the method
Kiln hall platforms and plant support steel Ceramics, tile and sanitaryware works in the six towns The kilns firing either side of the new members
Mezzanines and pick floors Distribution sheds on the A50 and A500 Racking and conveyors below, and the door the members come through
Portal frame units and extensions Etruria Valley, Trentham Lakes and Festival Park The sequence of set-ups from one gable to the other
Process platforms and walkways Food factories across Staffordshire Line equipment and wash-down areas around each column
Equipment frames and access steel Recycling yards, substations and water treatment works The outage window the operator sets
Old frames taken down Works being reorganised or cleared How the remaining steel stays stable as members come out

Our steel erection and dismantling service page covers the work in more depth.

Get a quote

Tell us about your project

Send us the details and we will come back with a quote, usually the same day for a desktop survey.

Or call 01782 841 268

    Get in touch

    Your Steel Erection or Dismantling Project

    Sectors

    Where we work in and around Stoke

    Stoke’s steel enquiries come from old works and new sheds alike.

    Distribution sheds from Chatterley Valley to the A50

    Mezzanine floors, new sheds and canopies over loading docks go up for warehouse and logistics operators, with the site working around us. See our construction sector page.

    Kiln halls and older potbanks

    Plant platforms, lean-to bays and support steel for new kilns and dryers go in at working potbanks and tile factories, fitted into the shutdown. See our industrial sector page.

    Clinics, universities and schools

    Plant decks and access steel are added to clinics and university blocks that stay open, and schools get small extensions in the holidays. See our healthcare and pharma and education pages.

    Engineering units on the business parks

    New portal frames and side extensions are put up for engineering, plastics and fabrication firms at Etruria Valley, Trentham Lakes and Festival Park. See our plastics and metals page.

    Utility and recycling sites

    Walkways and equipment frames are erected at recycling yards, substations and water treatment works around the county, inside the outage the operator sets. See our waste and recycling page.

    Planning

    Access and planning for steel erection in Stoke

    Before a Stoke frame is priced, we look at these:

    • Colliery and marl ground. Old pit spoil, filled marl holes and pottery tip can all sit under one plot. Ground bearing is checked at every crane position and the outrigger mats are sized to suit.
    • The lift plan ahead of the steel. Crane positions and the pieces each one places are fixed before the fabricator finishes detailing, so heavy members can be split or sequenced to suit.
    • Deliveries in erection order. Works yards in the six towns have little room to lay steel down, so wagons are booked one at a time and each is unloaded straight into the frame.
    • Gusts and large surfaces. LFS panels and long purlins have to stop in a breeze the crane could work through, so the supervisor checks conditions at height before each one goes up.
    • Closures from city or county. Stoke-on-Trent City Council handles roads inside the city, and Staffordshire County Council those in Newcastle-under-Lyme, Kidsgrove and the Moorlands. We apply to the right one and provide the traffic management and road closure.

    Alterations

    Alterations, mezzanines and dismantling

    Before steel goes into a works that keeps firing, our survey records the columns and connections it will bolt to, and in an older Burslem or Longton building that survey often stands in for drawings nobody kept. Inside those low buildings a crane jib has no room, so members come through the yard door and are raised from the floor between the kilns.

    Existing frames come down for a new layout or for reuse. The sequence keeps the remaining steel standing, with temporary props under anything a release would leave hanging, and match-marks go on every piece that will be erected again.

    Coverage

    Postcodes and areas we cover

    We cover every ST postcode, from the six towns out to the Moorlands:

    • Stoke-on-Trent: Hanley, Burslem, Tunstall, Longton, Fenton, Stoke, Trentham and Etruria
    • West and south: Newcastle-under-Lyme, Stone, Eccleshall and Stafford
    • North and east: Kidsgrove, Biddulph, Leek, Cheadle and the Staffordshire Moorlands
    • Wider area: Crewe, Congleton, Macclesfield, Uttoxeter, Derby and Telford

    We erect steel right across the UK.

    Why Synergy

    Why Stoke firms choose Synergy Lifting for steel erection

    • Steel for ceramics works. Platforms and bays for new kilns and dryers go into pottery, tile and sanitaryware works, planned around the firing programme.
    • Mezzanines for the A50 and A500 sheds. Mezzanine floors and new bays go into distribution sheds, with the steel routed round the racking.
    • No handover between crane and gang. The operatives slinging each piece are the erectors who bolt it, working from the lift plan our appointed person wrote.
    • Qualified and accredited. CPCS and CSCS carded operatives, lifts planned to BS 7121 by an appointed person, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    Process

    How a steel erection job works

    1. Your drawings and steel schedule come first, along with where the site is and when the programme wants the steel.

    2. Next we visit and note crane standings, the ground, how wagons reach the plot, where steel can be set down and any overhead lines.

    3. Our appointed person plans each lift. A method statement and risk assessment follow, including the temporary bracing that holds the frame between stages.

    4. With your fabricator we settle which pieces go on each wagon, and in what order.

    5. Then the gang stands the steel and braces it, lines and levels the frame, and clears the way for the following trade.

    FAQs

    Common questions

    Yes, away from the steel. The bays under the new floor are fenced off, members come in through a dock door, and the lifts are booked around your busiest hours. Send the racking layout with the drawings.

    That is how we plan it. The steel is detailed, lift-planned and loaded in erection order before the kilns go off, so the gang can start on the first morning. Tell us the dates and which areas of the works stay live.

    We do. An appointed person plans every lift to BS 7121: where the crane stands, what it can place from each position, and how the frame stays stable at every break in the work. The same gang then rigs and erects to that plan.

    Yes. Mezzanines and internal platforms go up with gantries, jacking equipment and our electric pick and carry crane, which works indoors without fumes. The steel comes in through a door and is lifted into place inside the building.

    Get a quote

    Get a quote for steel erection in Stoke

    Go to the form

    With the fabricator’s drawings, give us the site address and the date the steel has to start. If the frame goes inside an older works, photographs of the doors and yard show us how the members get in.

    We also provide steel erection in Stockport, Wolverhampton, Derby and Warrington. See all the steel erection locations.

    • Amazon
    • Brotje
    • ITV Studios
    • NG Bailey
    • Northern Structures
    • Schneider Electric
    • Spaans Babcock
    • Sulzer
    • Wates