Scroll to top

Factory Relocation York

Factory relocation in York and across North Yorkshire

York’s factory moves come from engineering firms on the ring road estates, food and agricultural processors, rail engineering businesses and university and hospital departments. One point of contact runs the whole job: survey and asset register, disconnection and decommissioning alongside your engineers and the equipment makers, strip-out and dismantling, lifting the machinery out, packing and crating, transport, then offloading and positioning at the new site, reinstallation, levelling, setting to line and recommissioning.

Our crews work in York, Clifton Moor, Monks Cross, Layerthorpe, Haxby and Poppleton, and out to Selby, Malton, Thirsk and Harrogate. A desktop survey can give you a quote the same day.

What a factory relocation covers

The job can be a whole site or a single department. Equipment you are not taking can be removed for sale or disposal during the same visit. Where the new building is behind schedule, we hold the machines in storage until it is ready. A small move can be done in a day, and a large one can run in phases over several months.

Factory moves we plan in York

Type of move What sets the timetable What we handle
Moving to a bigger or newer unit The finish date on a new unit near the A1237 Both addresses surveyed, then extraction and reinstallation to the new floor plan
Bringing two sites onto one Floor space cleared at the site you are keeping One asset register and a move order that suits both sites
A closure, with working plant going to a sister site in the UK or abroad When the receiving plant can take each machine Decommissioning, crating for the journey, and clearing the plant that stays
Rearranging a factory within the same building or site Gaps in the production plan Machines moved between bays, then levelled and set to line on new bases
A single line or department moving The length of time that line can stand idle Splitting the line at agreed points and rebuilding it with its conveyors
A lease end forcing a move The day the landlord gets the keys back An empty unit on that date, and storage if the next building is not ready

The full process is on our factory relocation service page.

Contact us

Get In Touch

Please leave a few details and a member of our factory relocation team will be in touch to discuss your requirements in more detail.

    Where we work in and around York

    York relocations come from a spread of sectors and estates.

    Clifton Moor, Monks Cross and Layerthorpe

    These estates around the ring road are the busiest part of our York work. Machine shops and fabricators here moving to a larger unit bring CNC machine tools and presses across in stages. See our industrial sector page.

    Moves into new-build units

    Firms moving into a newly built unit off the A1237 have their plant brought in once the contractor hands the building over and the bases have cured. See our construction sector page.

    Food, drink and agricultural processing

    Across North Yorkshire, processors relocate filling and packing lines, process tanks and skids when they expand or bring sites together. Each section is wrapped and labelled for rebuilding in order. See our food and beverages page.

    Rail engineering

    Rail engineering businesses around the city that change premises take test benches and heavy workshop plant with them, loaded in the order the new workshop is fitted out. See our rail sector page.

    University and hospital departments

    Research groups and hospital departments changing building take their labs and test equipment with them, with each room’s contents reinstalled before the next is moved. See our education sector and healthcare and pharma pages.

    Access and planning for a factory move in York

    Points we check on most York relocations:

    • Loading inside the walls. A workshop within the walls has to be cleared through bars with fixed height and width limits, on streets that are pedestrian for much of the day. We size trailers and loading times to suit.
    • A new building that is ready in time. Machines are booked in only once the slab, bases, power and air at the new unit are finished and each item has a way in.
    • Getting the plant out of the old building. We measure doors and headroom, and check whether cladding or a roof panel can come off for the largest machines.
    • The slab at each address. We confirm what each slab will carry under skates and jacks, and spread the load with plates where needed.
    • City of York Council and the roads out. If a load-out needs part of a road or pavement, we arrange the traffic management and closure with the council. Abnormal loads are notified where needed before they head out on the A64 or the A19.

    Keeping production going during the move

    A phased move keeps your order book moving. The lines you can spare go first and start running at the new site, then the remaining plant follows. We work weekends and shutdowns, and a Layerthorpe firm moving out to Clifton Moor can run both buildings until the last machine crosses.

    Storage covers the gap between leaving your old unit and the new one being ready, and machines come out once the bases have cured. Equipment you are leaving behind can go for sale or disposal on the same visits.

    Postcodes and areas we cover

    We cover every YO postcode around the city and the districts beyond it:

    • York: city centre, Layerthorpe, Heworth, Holgate, Acomb, Fulford, Osbaldwick and Bishopthorpe
    • North of the city: Clifton Moor, Monks Cross, Huntington, Haxby, Wigginton and Strensall
    • South and west: Copmanthorpe, Poppleton, Dunnington and Elvington
    • Wider area: Selby, Tadcaster, Malton, Easingwold, Thirsk, Wetherby and Harrogate

    We relocate factories right across the UK and into Europe.

    Why York firms choose Synergy Lifting for factory relocation

    • Used to food and rail sites. Hygiene rules on processing sites and possession times on the railway are built into the programme from the start.
    • Crane, riggers, lorries and fitters on a single contract. One firm to call from the first survey to the last machine on its base.
    • Paperwork ready before the first lift. Method statements, risk assessments, lift plans and any abnormal load notices are prepared and issued ahead of the move.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a factory relocation works

    1. Tell us both addresses, roughly how many machines there are and when production must restart.
    2. We survey both buildings and draw up the asset register. For a smaller move, a desktop survey gives you a price the same day.
    3. You receive a quote and programme built on the move sequence, with method statements, risk assessments and lift plans.
    4. The crew extracts and packs the plant, then hauls it to the new site in sequence.
    5. Each machine is reinstalled, levelled and set to line, then handed to your engineers for recommissioning.

    Common questions

    Can you move our York plant to a sister factory in Europe?

    Yes. We decommission the plant with your engineers, crate each machine and arrange transport, then reinstall it at the receiving site. Tell us the destination and the date that plant needs to be running.

    Our university department is changing buildings. Can the move fit between terms?

    Yes. We survey the old and new rooms early and book the move into the break, in an order agreed with your technical staff, so the new rooms open with their equipment in place.

    Can we keep producing while we move?

    In most cases, yes, for part of the plant. We move the lines you can spare first and get them running at the new site, then bring the rest across. It means more visits, and it keeps output going while the move is under way. We tell you at survey which parts can overlap.

    How are disconnection and recommissioning handled?

    We agree who does what at survey and write it into the programme. It is a mix of our crew, your maintenance team and the equipment manufacturers, and everyone knows their part before the first machine moves. Recommissioning is done with your engineers or the manufacturer.

    Get a quote for factory relocation in York

    Send us both addresses, a rough machine count and the date production has to restart, and we will come back with a quote.

    We also provide factory relocation in Leeds, Doncaster, Hull and Middlesbrough. See all the factory relocation locations.