Contents
Plant room strip out in Peterborough and across Cambridgeshire
Peterborough plant room work comes from hospital and school estates, energy from waste and generation sites, Fen packhouses and cold stores, and the boiler houses behind engineering works and distribution sheds. The building keeps working while old plant goes out and new plant goes onto its bases. We plan our days round the M&E contractor and work beside their fitters.
Our crews cover Peterborough, Fengate, Orton, Hampton and Whittlesey, and out to March, Wisbech, Stamford, Oundle, Spalding and Huntingdon. Photos of the room and how plant gets out of it are enough for a desktop survey and a same-day price, with nights, weekends and shutdown shifts where the building needs them.
What a strip out covers
We remove the heating and cooling plant, air handling units, pumps and tanks, and the generators and switchgear, plus the redundant pipework and steel. Each unit is reduced to a size the route will take, rigged out and taken away. The replacement comes in along the same path, and our riggers land it level on its bases for connection.
What comes out of a Peterborough plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Chillers and condensers | Flat roofs and fenced compounds beside the building | Picked whole from the kerb, or opened up and carried down |
| Air handling units | Roof decks and plant floors above occupied rooms | Parted into factory sections and trolleyed to the goods lift |
| Boiler plant and calorifiers | Basement boiler rooms and single-storey boiler houses | Casing stripped, shell cut into pieces the stair will pass |
| Refrigeration packs and cold store condensers | Plant decks behind packhouses and chilled stores | Unbolted once the gas is out and lifted onto the wagon |
| Transformers, switchgear and standby generators | Substations, switchrooms and acoustic enclosures | Jacked onto skates, rolled to hardstanding, craned onto the trailer |
| Pumps, tanks and redundant pipework | Pump rooms, tank rooms and service risers | Tanks dropped by panel, pipe cold cut into lengths |
Plan for the unit with the narrowest way out, because the largest item may have an easy door beside it. More on our plant room strip out service page.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Peterborough
Strip outs here follow the city’s mix of work.
Transformer and generator rooms on the energy sites
Switchgear, transformers and standby generators leave the energy from waste, renewable and utility sites around the city inside outage dates fixed well ahead. See our power and renewables and waste and recycling pages.
Refrigeration plant at March, Wisbech and Spalding
Worn refrigeration packs, condensers and boilers come out of Fen packhouses and chilled stores in a planned stop, routed clear of the hygiene areas. See our food and beverages page.
Hospitals and schools that stay open
Hospital and school buildings stay open while we change the chillers, boilers and air handling units behind them. See our healthcare and pharma and education pages.
Compressor and boiler houses in the city’s works
Old boilers, compressors and extraction fans leave fabrication and light engineering units at Orton Southgate, Woodston and Fengate in a shutdown each firm chooses. See our plastics and metals page.
Sheds beside the A1 and the A47
Warm air heaters, switchgear and standby generators come out of the warehouses there between loads. See our industrial sector page.
Access and planning for a Peterborough plant room strip out
Our survey works through these with the building owner and the M&E contractor:
- Ground and floors. Peat and made ground around Peterborough carry less than they look, so crane standings are matted and kept back from the dykes. Indoors, we check suspended slabs and ducts under the skates.
- People still working around the job. The building manager sets our hours and noise limits. We book the lift, protect the corridors and work nights where needed.
- A crane at the roof edge or a carry down the stairs. A crane brings a hire charge and a closure but saves days of labour. A carry through the building costs little in plant and far more in crew hours.
- Breaking each unit to size. Plant parts at its panel and flange joints, and our split fixes the heaviest piece and whether a crane must stand on Fen peat.
- A closure from the right council. In the city the closure and traffic management go to Peterborough City Council. For the towns it is Cambridgeshire, Lincolnshire or North Northamptonshire. We apply, and set aside a lay-down area for old and new plant.
Before anything is lifted
The plant has to be dead and empty before our riggers touch it. At a Fen packhouse or city ward, the M&E contractor shuts, drains and padlocks it, then signs before we cut in. The refrigerant has to be recovered first, by an F-gas certified engineer.
Any asbestos the survey finds is removed by a licensed contractor and the area cleared before our crew goes in. The crane date is fixed only once those sign-offs have dates of their own.
Postcodes and areas we cover
We cover every PE postcode and the districts around the city:
- Peterborough: city centre, Werrington, Fengate, Hampton, Orton and Whittlesey
- The Fens: Wisbech, March, Chatteris, Ramsey, Spalding and Bourne
- West and south: Stamford, Oundle, Huntingdon, St Ives and St Neots
- Wider area: Cambridge, King’s Lynn, Boston, Grantham, Kettering and Corby
We strip out plant rooms right across the UK.
Why Peterborough firms choose Synergy Lifting for plant room strip out
- A quote that names every trade. It shows who isolates, who recovers refrigerant, who handles asbestos and who connects the new plant, with our dates set against theirs.
- Night and weekend crews. Wards and chill stores keep running, so heavy moves go into the hours the building manager offers.
- Out and in on one contract. We crane from the kerb, rig in the plant room, truck the old plant out of the city and skate the new units into place.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Other work a Peterborough strip out tends to draw in:
How a plant room strip out works
- You tell us what the plant is and where it sits, with photos of the route to the street.
- We come out to survey, pick the route and decide how far each unit breaks down.
- We produce the method statement and risk assessment with a lift plan, timed to when the systems will be isolated.
- The crew strips the plant out and loads it for removal.
- The replacement is set down level on its bases and handed over for connection.
Common questions
Our building is in Stamford rather than the city. Does that change who closes the road?
Yes. Stamford is in Lincolnshire, so the closure goes to Lincolnshire County Council, while Wisbech and March fall to Cambridgeshire and Oundle to North Northamptonshire. That council’s lead time goes into our programme.
Our switchgear change at a generation site near Peterborough sits inside a planned outage. What do you need, and when?
The outage dates, a plant list with weights, and photos or drawings of the room and its exit route, once the dates are known. We survey, fix the method and book the crane ahead, so the outage itself is spent on the swap.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Peterborough
- Phone: 01733 592 477
- Email: peterborough@synergy-lifting.co.uk
A note of the plant, which floor or roof it is on and whether it is being replaced is enough to start. Out in the Fens, add pictures of the room and the drove outside.
We also provide plant room strip out in Cambridge, Northampton, Leicester and Milton Keynes. See all the plant room strip out locations.