Scroll to top

Plant Room Strip Out Lincoln

Plant room strip out in Lincoln and across Lincolnshire

Estates teams for Lincoln’s health buildings, schools and colleges call us when their heating and cooling plant is worn out, and so do landlords with offices up the hill and food processors across the county. We take the old plant apart and clear it out of the building, in step with the M&E contractor’s work.

We cover Lincoln, North Hykeham, Bracebridge Heath and Nettleham, out to Sleaford, Gainsborough and Newark-on-Trent. Send photos of the plant and the stairs or doors it has to pass, and we can survey from the desk and price the same day, with night, weekend and shutdown shifts where the building has to keep going.

What a strip out covers

Heating, cooling and air handling plant comes out, along with pumps, tanks, generators and switchgear and the dead pipework and steel around them. Each unit is broken down to suit the route and rigged out, and any replacement plant comes in and is set level on its bases, ready for connection.

What comes out of a Lincoln plant room

Plant Where it sits How it comes out
Steel shell and cast iron boilers Below-ground boiler rooms and lean-to boiler houses Cladding off, then taken down in pieces the stair will pass
Calorifiers and buffer vessels On their own plinths beside the boilers Jacked onto skates and tipped on edge for the door
Chillers and refrigeration packs Pack house compounds and flat roofs over offices Craned off whole, or unbolted into modules first
Air handling units Shed roofs and plant decks above wards Parted into fan, coil and filter pieces for a gantry
Standby generators and LV panels Energy rooms, switchrooms and yard enclosures Winched off the base on skates to the loading point
Old pipework, valves and brackets Ceiling voids, floor trenches and risers Cold cut to carrying lengths, run by run

The unit with the trickiest route to the door sets the method, even when a heavier one sits in open floor. See our plant room strip out service page.

Contact us

Get In Touch

Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.

    Where we work in and around Lincoln

    Lincoln plant room work starts in the old city.

    Steep Hill, Bailgate and the conservation area

    Cast iron boilers and old air handling units leave the listed offices and shops along Steep Hill and Bailgate down narrow stairs, cut to what the stone doorways pass. See our HVAC page.

    Sheds on the Lincoln bypass

    Rooftop cooling, standby generators and switchgear come off the distribution sheds beside the A46 while the bays keep trading, lifted in a quiet hour the transport office gives us. See our industrial sector page.

    Refrigeration at the county’s packers

    Refrigeration packs and boilers leave the county’s produce sites between runs, under their hygiene rules. See our food and beverages page.

    Where patients and pupils stay put

    Heating and ventilation plant in hospital, school and college buildings around the city comes out with people inside, or over a holiday. See our healthcare and pharma and education pages.

    Outage work at utility sites

    Transformers, switchgear and pump sets at substations and water treatment works come out in a booked outage, the replacement waiting on site. See our power and renewables and waste water treatment pages.

    Access and planning for a Lincoln plant room strip out

    A Lincoln job takes a date once these are settled:

    • The crane position, the closure and the lay-down. Up the hill the streets climb hard and carry weight limits, and a slope eats into what a crane can lift, so its position is fixed first. We apply to Lincolnshire County Council for the closure and agree where old plant waits for the wagon.
    • How each unit is divided. Boilers part at their sections and air handling units at the casing joints, and those splits set the weight of the biggest piece.
    • Which way out costs less. Lifting over the roof costs the hire, a closure and a short day. Carrying plant down through the building costs labour, floor protection and hours. Where both work, the survey prices both.
    • Old floors and soft yards. Skated and jacked loads sit on small points. Floors in listed buildings uphill are fabric to protect, and fen yards turn soft under outriggers, so we check both and spread the load with plates and mats.
    • Hours the building sets. We agree when we can work, the noise, the lifts and a boarded route with the building manager, and do heavy moves out of hours.

    Before anything is lifted

    Each system is isolated, drained and locked off by the M&E contractor, with a signed record, before our crew cuts anything. Refrigerant comes out first, recovered by an F-gas certified engineer, and a licensed contractor clears whatever the asbestos survey found.

    At quoting stage each of those becomes a dated step in the programme, and our first day on site sits behind them.

    Postcodes and areas we cover

    We cover every LN postcode, including:

    • LN1 to LN2: Lincoln city centre, uphill Lincoln, Nettleham, Saxilby and Welton
    • LN3 to LN6: Cherry Willingham, Washingborough, Branston, Bracebridge Heath, Skellingthorpe, North Hykeham and Doddington
    • LN7 to LN13: Caistor, Market Rasen, Louth, Horncastle, Woodhall Spa and Alford
    • Wider area: Newark-on-Trent, Sleaford, Grantham, Gainsborough, Boston, Spalding and Scunthorpe

    We strip out plant rooms right across the UK.

    Why Lincoln firms choose Synergy Lifting for plant room strip out

    • Plant rooms on working food sites. Hygiene rules and the stop you give us go into the method at survey.
    • Programmes built back from the finish. On hospital, school and college work the survey starts from the date the building needs its heat or cooling again, and our days are fitted in front of it.
    • One firm on the street and in the room. Crane, riggers, wagon and landing the new unit all come from us.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a plant room strip out works

    1. Start with the plant list, its floor and photographs of each door and turn out to the street.
    2. A site visit walks every turn from room to street, often through old, narrow uphill doors, and settles which way the plant leaves and how it breaks down.
    3. Then the paperwork: lift plan, risk assessment and method statement, with our dates after the isolations.
    4. Our crew breaks the plant down, carries it out and loads our wagons.
    5. Last, the new unit is landed and levelled, and the M&E contractor takes it from there.

    Common questions

    Our offices are in a listed building in uphill Lincoln. Can the old boiler come out without harming it?

    Yes. Our survey measures the stair, the doorways and the steep street, then we cut the boiler into sections the route passes. Stone steps and door linings are boarded before the first piece moves.

    Our chiller is on a pack house roof out in the county. Can it be changed between runs?

    Yes, if the stop is booked early. The crane stands on the firmest part of the yard, on mats where it is soft, and once the refrigerant is recovered the old chiller comes off and the new one goes up in the same window.

    Can the building stay open while the plant comes out?

    Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.

    Who isolates and drains the plant before you start?

    Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.

    Get a quote for a plant room strip out in Lincoln

    Tell us which plant you want out, where in the building it is and whether anything goes back. For an older building up the hill, pictures of the room, the stair and each doorway save a visit.

    We also provide plant room strip out in Grimsby, Doncaster, Nottingham and Chesterfield. See all the plant room strip out locations.