Sites
Live buildings
Hospitals, universities, data centres
Coverage
Doncaster
And the surrounding area
Quotes
Same day
For most enquiries
Overview
Plant room strip out in Doncaster and across South Yorkshire
We strip out plant rooms in Doncaster for the distribution sheds, the works in the lower Don Valley, utility and waste sites, town centre landlords, and the school, college and hospital estates. Anything from switchgear and standby generators to chillers, air handling units, tanks and boilers comes out with us. The M&E contractor sets the dates.
We cover Balby, Bentley, Armthorpe, Thorne and Mexborough, out to Rotherham, Barnsley and Goole. Photographs covering the way from the plant room to the shed door are enough for a desk price that same working day. Most of the heavy work here is done in shutdowns or at weekends.
What a strip out covers
We cut the plant down to what the route will take, rig it out and take it away. The replacement comes in the same way and is set true on its plinth. Pipework, electrical work and commissioning stay with your M&E contractor.
What we do
What comes out of a Doncaster plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Switchgear, transformers and standby sets | Switchrooms, energy centres and comms rooms | Gantried off the base and skated out |
| Boilers and calorifiers | Ground floor boiler houses and basements | Burner and insulation off, shell parted to the doorway |
| Chillers and condensers | Shed roofs, yard plinths and compounds | Slung off in one from the yard, or reduced on the roof deck |
| Air handling units | Roof decks and internal plant rooms | Casing panels off first, then the coils and the fan deck |
| Pumps and tanks | Tank rooms, basements and riser cupboards | Toe jacked off the plinth, rolled out on skates |
| Dead pipework and support steel | Risers, ceiling voids and the room itself | Cold cut where it is bracketed, bundled and carried out |
Plan around the heaviest item and the small one in a tight corner will stop the job, so the worst route out sets the method. The plant room strip out service page has the detail.
Get a quote
Tell us about your project
Send us the details and we will come back with a quote, usually the same day for a desktop survey.
Or call 01302 238 334
Sectors
Where we work in and around Doncaster
Most of our Doncaster plant room work starts in the sheds by the motorway junctions.
Distribution sheds and logistics parks
Boiler plant, pump sets and rooftop cooling come out of the units at Rossington and Balby Carr while trailers keep arriving. See our industrial sector page.
Steel and process works in the lower Don Valley
Boiler houses and compressor rooms behind the works from Mexborough through Swinton take the line down with them when they stop, so the job waits for a booked shutdown. See our plastics and metals page.
Substations, utilities and waste sites
Transformers, switchgear and standby sets are changed inside a booked outage, and plant in the recycling and transfer buildings comes out in planned downtime. Both are covered on our power and renewables and waste and recycling pages.
Town centre offices and retail blocks
A landlord changing basement boilers or roof chillers keeps the tenants in, so the sequence is built around one goods lift and the hours they will wear. See our HVAC page.
Schools and colleges
Old boilers and air handling units come out over the holidays, and the caretaker gets the keys back on the day agreed. See our education page.
Hospital estates and clinics
Old heating and cooling plant leaves a building treating people only after the new set has been proven on load. See our healthcare and pharma page.
Planning
Access and planning for a Doncaster plant room strip out
Five things get settled with the site before a Doncaster strip out takes a date:
- Where the crane stands, and where plant is laid down. A crane lifting over the building needs part of a road, plus a lay-down beside it. The traffic management and road closure goes through City of Doncaster Council, and through Rotherham council where the building stands at Swinton.
- Split points. We split at the flange and panel joints, and that gives us the weight of the biggest piece.
- People on site. We settle our hours, the route protection and which lift we get with the building manager before taking a date.
- Craned off the roof, or taken out at ground level. Crane, labour and hours come out very differently for each, and where both are possible the survey prices both.
- Ground and floor loads. A jacking point puts far more through a square inch than the floor was built for, and older buildings along the lower valley stand on made ground.
Preparation
Before anything is lifted
We book our crew in only once three other trades have signed off. Whether it is a Balby Carr shed or a works in the lower valley, your M&E contractor takes the plant off supply, empties it and locks it, and confirms it to us in writing. An F-gas certified engineer takes the refrigerant out, and we start after the certificate. Any asbestos the demolition survey picks up is removed and certified clear by a licensed contractor.
At quoting stage all three sit in the programme beside the new plant’s delivery date. Our crew starts once the last of them lands.
Coverage
Postcodes and areas we cover
Work comes in from across the DN postcodes:
- Doncaster: town centre, Hexthorpe, Balby, Wheatley, Bessacarr and Bentley
- North and east: Armthorpe, Adwick, Askern, Dunscroft, Hatfield and Thorne
- South and west: Rossington, Bawtry, Tickhill, Conisbrough, Denaby and Mexborough
- Wider area: Rotherham, Swinton, Barnsley, Worksop, Goole and Scunthorpe
We strip out plant rooms right across the UK.
Why Synergy
Why Doncaster firms choose Synergy Lifting for plant room strip out
- Used to live sites. We plan round trailer movements, shift changes and permits before we arrive, not on the day.
- Nothing is left in the plant room. The old units, redundant steel and cut pipework leave on our wagons, and the floor is swept before the room is handed back.
- One contract for all of it. That covers the crane, the riggers inside, the haulage and setting the new unit.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
Services
More than plant room strip out
Other work a Doncaster strip out pulls in:
Process
How a plant room strip out works
-
The plant schedule comes first, with any replacement and pictures of the route through the shed or works to the yard.
-
A site survey agrees how each unit gets out past the trailer traffic and where it splits.
-
Next come the lift plan, the risk assessment and the method statement, with our days booked behind the isolations and any Swinton closure.
-
Breaking down, moving and loading out all happen inside the hours the site has agreed.
-
The replacement is lowered into place and levelled inside those same hours, ready for connection.
FAQs
Common questions
Our chiller sits on a shed roof at Rossington. Can the lift go in while trailers are moving?
Yes, from a fenced section of yard agreed with your site team, with the exclusion zone marked before the crane arrives and the lift timed to a gap between arrivals.
A railway runs along the back of our Mexborough works. Does that change the job?
Where the load-out comes within reach of the line, yes. The rail operator sets the clearances and decides whether a possession is needed, so tell us at enquiry how close the line runs.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote
Get a quote for a plant room strip out in Doncaster
- Phone: 01302 238 334
- Email: doncaster@synergy-lifting.co.uk
Tell us what the plant is, which floor it is on and whether it is being replaced. Some pictures of the doors, the yard and any trailer traffic on the way out let us price it from the desk.
We also provide plant room strip out in Sheffield, Chesterfield, Leeds and York. See all the plant room strip out locations.