York work comes from old buildings inside the walls, the trade estates round the edge of the city, schools, colleges and the campus, hospitals and food processors. Boilers, chillers, air handling units, tanks, pumps and switchgear all leave with us, along with the dead pipework. Your M&E contractor sets the timetable.

We cover the city from Acomb and Poppleton round to Monks Cross and Layerthorpe, out to Selby, Malton and Harrogate. With a plant schedule and some pictures of the room and its way out, cellar steps included, we can quote on the same working day. If the plant room is only free after closing, we come then.

What a strip out covers

We take each unit down to sizes the stairs, doors and lifts will pass, work it out to the street and clear it. Where replacement plant follows, the same crew lands it level on its bases. Pipework, electrical work and commissioning stay with the M&E contractor.

What comes out of a York plant room

Plant Where it sits How it comes out
Air handling units Roof decks and ceiling-level plant rooms Coils and fans out first, casing down panel by panel
Boilers and calorifiers Cellars and ground floor rooms Stripped to the shell, broken into pieces the doorway takes
Chillers and condensers Roof plinths and yard compounds Slung off whole where a crane can stand, or reduced and taken inside
Water tanks, pumps and pressure units Tank rooms and low basements Levered off the base and wheeled along the corridor on skates
Switchgear, transformers and standby sets Substations and standby plant rooms Skated off the plinth and gantried into the open
Redundant pipework and support steel Risers and ceiling voids Cold cut and bundled as the plant around it clears

Method follows whichever unit has the most awkward journey to the street, and that is often a modest piece of kit in a bad place. The plant room strip out service page has more.

Contact us

Get In Touch

Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.

    Where we work in and around York

    York splits this work between the old centre and the trading estates around it.

    Inside the walls

    Plant off Micklegate, Fossgate and the lanes around them sits in cellars under old buildings, and it comes up to street level in pieces a narrow doorway and a tight stair will pass. See our HVAC page.

    Clifton Moor, Monks Cross and Layerthorpe

    Rooftop cooling, boiler rooms and compressor sets come out of the trade and industrial units here around deliveries and trading hours. See our industrial sector page.

    Campus, college and school buildings

    Boiler and air handling plant comes out of teaching buildings in the vacations, when corridors and lifts are free and term dates give the programme a hard end. See our education page.

    Hospitals and health centres

    Replacement kit is landed and handed over for connection before the old plant is touched, because these buildings cannot go cold while we work. See our healthcare and pharma page.

    Food and drink processing around the county

    Refrigeration packs, boilers and air compressors leave processing buildings inside short stops, and where the route passes the lines, hygiene rules decide how it is sheeted and when it is used. See our food and beverages page.

    Access and planning for a York plant room strip out

    The survey answers five questions before any date is offered:

    • Floor loads, and what is underneath. Weight on a skate arrives through a very small contact patch, and buildings near the Ouse and the Foss have cellars underneath and made ground outside.
    • Over the roof, or out through the door. Crane, labour and hours all move with that choice. Inside the walls the bars cap height and width and standing positions are scarce.
    • Road closures and the lay-down area. Craning over a building takes a carriageway or car park, and the old unit needs somewhere to land. The traffic management and road closure is applied for with City of York Council.
    • How far the plant breaks down. Panel joints, flange joints and sectional boiler shells set the smallest pieces available, and the heaviest of those brings in a crane.
    • People working round us. We fix our hours, the noise limits, which lift we can book and how the route is boarded with the building manager before a date goes in.

    Before anything is lifted

    Three other trades go before us. Inside the walls or out at Clifton Moor, your M&E contractor shuts the plant down, empties it and secures it, and gives us that in writing. An F-gas certified engineer takes the refrigerant off and signs for it. If the R&D asbestos survey finds anything, a licensed contractor clears it first.

    We put their dates in the quote next to ours. If the job is booked into a holiday closure, we chase them early, as the end date will not move.

    Postcodes and areas we cover

    We cover every YO postcode and the districts beyond the city:

    • York: city centre, Holgate, Acomb, Heworth, Layerthorpe, Fulford and Osbaldwick
    • North of the city: Clifton Moor, Monks Cross, Huntington, Haxby and Strensall
    • South and west: Bishopthorpe, Copmanthorpe, Poppleton and Rufforth
    • Wider area: Selby, Tadcaster, Malton, Thirsk and Harrogate

    We strip out plant rooms right across the UK.

    Why York firms choose Synergy Lifting for plant room strip out

    • Agreed with the people who run the building. Hours, the lift, protected routes and tenant notice are settled with the estates or facilities team before a date is taken.
    • The old plant leaves site with us. It goes for disposal, or for resale where the unit still has working life, and the transfer paperwork comes back to you.
    • One contract. The crane, the crew inside, the wagons and setting the new unit are all on one order.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a plant room strip out works

    1. Give us the plant list and the room’s position, cellar or roof, with pictures of the lanes and doorways on the way out.
    2. A survey of the route, bars and snickets included, shows where each unit splits and what the largest piece weighs.
    3. We send over the method statement and risk assessment with a lift plan, dated to follow the isolations.
    4. Our crew breaks the plant down in the agreed order, works it along the protected route and clears site.
    5. Below the street or up on the roof, the new set is brought to level where it will run and left for the M&E contractor’s connections.

    Common questions

    How does plant get out of a cellar on a street closed to vehicles by day?

    On skates and a gantry to the nearest door, then a run to where a wagon can legally wait, timed to the hours vehicles reach that street.

    How does rooftop plant on a unit at Clifton Moor or Monks Cross come off?

    Yard space beside the unit takes a crane on most of those estates, so the old unit comes off whole and the new goes up the same visit.

    Can the building stay open while the plant comes out?

    Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.

    Who isolates and drains the plant before you start?

    Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.

    Get a quote for a plant room strip out in York

    Let us know what needs to come out, which floor it is on and if new plant is going back in. Pictures along the route out, and a note of whether the street is closed to vehicles by day, help us price it.

    We also provide plant room strip out in Leeds, Doncaster, Hull and Middlesbrough. See all the plant room strip out locations.