Plant Room Strip Out Stockport

Plant room strip out in Stockport and across Greater Manchester

Stockport plant rooms range from boiler cellars in mills awaiting conversion to energy centres on the Bredbury Park and Reddish estates. Estates teams at hospitals, schools, colleges and public buildings call us too. We bring the old plant up from mill cellars or off the roof, and the replacement takes its place.

We cover Stockport, Cheadle, Heaton Chapel, Reddish, Bredbury and Hazel Grove, and further out Marple, Poynton, Wilmslow and Glossop. Send photos of the room, its stairs and any hatch or yard door, and we can price from a desktop survey the same day, working evenings and weekends where the building stays open.

What a strip out covers

Boilers, chillers, air handling units, generators and switchgear are broken down to pieces the route will pass, with the dead pipework around them, then taken away. Replacement plant is landed and levelled on its bases. Your M&E contractor sets the dates and keeps the pipework, electrical connections and commissioning.

What comes out of a Stockport plant room

Plant Where it sits How it comes out
Air handling units Rooftop frames and plant decks Parted at the casing joints, fans and coils lowered separately
Calorifiers and boilers Boiler rooms below ground or at the back Taken apart into sections and skated to the door
Chillers and condensers Flat roofs and fenced compounds Lifted off whole, or broken down and carried inside
Pressurisation units, pumps and tanks Tank rooms under the roof Jacked off the plinth and moved out on skates
Switchgear, transformers and standby sets Standby rooms and switchrooms Rolled out to a gantry or to the crane at the door
Redundant pipework and steelwork Ceiling voids, risers and wall brackets Cold cut to lengths a crew can carry

It is the route more than the weight that decides the method, so a light unit behind a narrow door can set the plan for the whole room. See the plant room strip out service page.

Contact us

Get In Touch

Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.

    Where we work in and around Stockport

    The work comes from five parts of the town.

    Bredbury Park, Reddish and the M60 estates

    Units along the M60 run on their compressor rooms, boiler houses and chiller plant, so changing any of it means booking a production stop with the site. See our industrial sector page.

    Heating plant in the mills

    Old boilers, tanks and heating pipework leave the mills ahead of conversion, or while tenants work on other floors. Existing doorways and stairs decide how small each piece goes. See our HVAC page.

    Health buildings across the borough

    Chillers and boilers leave hospitals and health centres that cannot go without heating or cooling, so the replacement runs first and the old unit follows it out, on hours the estates team sets. See our healthcare and pharma page.

    Older buildings in the town centre

    Rooftop units and basement boilers are cleared from older town-centre buildings as regeneration reaches them. See our construction sector page.

    Schools and colleges from Cheadle to Marple

    Plant in teaching buildings comes out in the holidays, when corridors are empty and the reopening date fixes the end of the job. See our education page.

    Access and planning for a Stockport plant room strip out

    We walk the route from plinth to wagon and settle these on the way:

    • Floors and slabs along the route. Timber floors and voids under the route are checked, and steel plate spreads the load under the skates.
    • How small each unit has to go. The split points fix the heaviest piece, and that chooses between a crane and a gantry.
    • Up over the roof, or down through the building. The crane and closure are the price of the roof route, and they save days inside. Bringing plant down through the building spends crew time instead, with lifts and stairwells to protect. In the valley the crane needs level standing, and lifts near the viaduct keep rail clearances.
    • Where the crane stands on the street. A lift over the building takes part of a road, and the old plant needs a lay-down area. We apply to Stockport Council for the road closure, and riverside ground by the Tame and the Mersey is checked before outriggers go down.
    • Working round the occupants. Working hours, noise, a lift and a boarded corridor are agreed with the building manager.

    Before anything is lifted

    Plant in a mill cellar or at Bredbury Park becomes ours once it has been shut off, drained and locked, and handed over in writing by the M&E contractor. Refrigerant is the F-gas certified engineer’s job. Asbestos found at survey is removed by a licensed contractor, and the room is cleared before our crew goes in.

    Our quote carries all three dates, with ours after them. Where a school or health building gives us a fixed holiday or weekend, we confirm the sign-offs before committing crew and crane.

    Postcodes and areas we cover

    We cover every SK postcode and the districts around it:

    • Stockport: town centre, Edgeley, Heaton Chapel, Heaton Moor, Reddish, Bredbury, Offerton and Romiley
    • South and west: Cheadle, Cheadle Hulme, Gatley, Heald Green, Bramhall and Hazel Grove
    • East: Woodley, Marple, Mellor, High Lane, New Mills and Glossop
    • Wider area: Manchester, Hyde, Poynton, Wilmslow, Macclesfield and Buxton

    We strip out plant rooms right across the UK.

    Why Stockport firms choose Synergy Lifting for plant room strip out

    • Old mills and new units. A mill with narrow stairs and a newer unit by the M60 each get a route of their own, worked out on site.
    • Holiday and weekend dates held. When a Stockport school or clinic gives us a break, the programme runs backwards from the day it reopens.
    • No separate crane firm. We supply the crane and the riggers, haul the old plant away and land the new unit.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a plant room strip out works

    1. Describe the old and new plant and where the room is, and send photographs of the way out.
    2. We walk the route at survey and mark the split on each unit.
    3. Paperwork follows: a lift plan, a risk assessment and a method statement. Our start date comes after the isolations.
    4. Our crew breaks the plant down, moves it out, loads it and takes it off site.
    5. Replacement plant comes back by the same doorway or roof edge and is levelled for connection.

    Common questions

    Can the rooftop units on a Bredbury Park building be changed over one weekend?

    The survey answers that, from the number of units and how far each splits. Units there have yards where a crane can stand, so the old plant comes off and the new goes up on the same visit.

    Our boiler room is below street level in the town centre. How does the plant get up to the road?

    In sections, up the existing stair on a hoist or out through a yard opening, each piece sized at survey to fit. Where the room sits well below the road, a crane standing on the higher street can lift the pieces up through an opening.

    Can the building stay open while the plant comes out?

    Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.

    Who isolates and drains the plant before you start?

    Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.

    Get a quote for a plant room strip out in Stockport

    Call or email with the plant, the floor it is on and whether it is being replaced, and photograph the mill stair, hatch or yard door it would leave by.

    We also provide plant room strip out in Manchester, Warrington, Wigan and Stoke. See all the plant room strip out locations.