Contents
Factory relocation in Aberdeen and across Aberdeenshire
Energy and subsea firms, engineering works, fish processors and food producers across Aberdeen and the shire all reach the point where the plant changes address. We run the move from one point of contact: survey and asset register, disconnection and decommissioning with your engineers and the equipment manufacturers, strip-out and dismantling, lifting the machinery out, packing and crating, transport, offloading and positioning at the new site, then reinstallation, levelling, setting to line and recommissioning.
We cover Aberdeen, Dyce, Bridge of Don, Altens, Tullos and Westhill, out to Kintore, Inverurie, Stonehaven and Peterhead. A desktop survey and photographs give a same-day price on a smaller move.
What a factory relocation covers
The scope can be a complete works or one department, taking in CNC machine tools, presses, production and packing lines, conveyors, compressors, process tanks and racking. Machines staying behind are taken out for sale or disposal during the same visits. If the new building is unfinished when you leave, equipment waits in storage until the floor and supplies are ready.
Factory moves we plan in Aberdeen
| Type of move | What sets the timetable | What we handle |
|---|---|---|
| Moving to a bigger or newer unit | Sign-off of the new floor, bases and supplies | Both buildings surveyed, then extraction, transport and setting to line |
| Bringing two sites onto one | The order the two buildings can be emptied | One asset register, with plant fitted around what runs there |
| A closure, with working plant going to a sister site at home or abroad | The install slot at the receiving plant | Decommissioning, export crating and clearance of whatever stays |
| Rearranging a factory within the same building or site | The output you must hold during the changeover | Machines moved area by area and set to line again |
| A single line or department moving | A shutdown long enough to strip and rebuild it | Dismantling, labelling, transport and rebuilding the line in order |
| A lease end forcing a move | The day the building goes back to the landlord | The unit emptied by that date, with storage covering any gap |
Our factory relocation service page covers each stage.
Contact us
Get In Touch
Please leave a few details and a member of our factory relocation team will be in touch to discuss your requirements in more detail.
Where we work in and around Aberdeen
Relocation work here comes from these sectors and industrial areas.
Firms serving the offshore energy industry
Much of Aberdeen’s manufacturing sits behind the offshore industry, and a firm changing premises takes machine tools, test equipment, skids and rigs with it. See our industrial sector page.
Engineering and fabrication near the water
Torry and the streets down to the water hold fabrication bays and machine shops. A firm leaving one takes rolls, saws, welding plant and benches with it, each measured against the opening it has to pass through. See our maritime sector page.
The energy transition supply chain
Offshore wind and decommissioning brought production and test equipment into the area, and firms in that chain move it to larger premises as contracts grow. See our power and renewables page.
Kirkhill, ABZ and the airport estates
The estates around the airport and heliport hold workshops, hangars and offices, where a move takes in machinery, test benches, racking and plant room equipment. See our HVAC and aerospace pages.
Seafood and farm produce processing
Seafood plants in the city and the crop and dairy processors inland work to short stops, so tanks, graders and packing machines are cleaned down and wrapped before they travel, then rebuilt in the order the line runs. See our food and beverages page.
Access and planning for a factory move in Aberdeen
Points we check on most Aberdeen relocations:
- Weather windows for the outdoor days. Wind coming in off the North Sea sets the limit on any lift done outside, so each item that has to leave by crane is flagged on the asset register and given room in the programme for a lost day.
- The receiving building on its dates. Bases, floor, power, air and a clear way in have to be ready when the register says the matching machine arrives, and the new building is checked against them.
- How each machine leaves the old one. Door and shutter widths, headroom under crane beams, the yard and whether a roof panel comes off decide the method for each item.
- Both floors under skates and jacks. Jacking puts a heavy load into a small area, and yard surfaces near the harbour have been made up over years, so what the slab and ground will carry is checked at both ends.
- Roads and notifications. Where a load-out needs part of a road or footway, we arrange the traffic management and closure with Aberdeen City Council or Aberdeenshire Council. Abnormal loads are notified where needed and routed round the city on the Aberdeen Western Peripheral Route.
Keeping production going during the move
A relocation can be phased so output continues. The lines you can spare travel first and are producing at the new site before the rest follows. Heavy lifts and noisier strip-out work go into a weekend or planned shutdown.
Leaving one building and taking the next rarely fall on the same day. Storage bridges that gap, so a unit at Altens can go back on the landlord’s date while installation waits for the date production needs. Plant you are not taking leaves for sale or disposal on the same visits.
Postcodes and areas we cover
We cover every AB postcode and the districts around the city:
- Aberdeen: city centre, Ferryhill, Mannofield, Torry, Northfield, Bridge of Don and Dyce
- Industrial and harbour areas: Altens, Tullos, Kirkhill and the harbour estate
- Aberdeenshire: Westhill, Kintore, Inverurie, Stonehaven, Banchory and Ellon
- Wider area: Peterhead, Fraserburgh, Elgin and Montrose
We relocate factories right across the UK and into Europe.
Why Aberdeen firms choose Synergy Lifting for factory relocation
- An asset register your own team can work from. Every machine is numbered, weighed where the plate has gone and matched to its position at the new site.
- Crane, rigging, transport and reinstallation on one contract. The crew that lifts a machine out levels it at the far end, and one person answers for the programme.
- Moves out of the shire and further afield. A move to central Scotland, England or a sister plant in Europe gets the same register and programme as one across the city.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than factory relocation
An Aberdeen relocation can draw on these as well:
How a factory relocation works
- Send both addresses, a rough machine count and the date production has to restart.
- We walk both buildings and build the asset register, or price a smaller move the same day from a desktop survey.
- The quote arrives with a programme built on the sequence, plus method statements, risk assessments and lift plans.
- Our crews extract each machine, pack or crate it and send it in its planned slot.
- At the new building every item is reinstalled, levelled and set to line, then handed over for recommissioning.
Common questions
What limits what can leave Aberdeen in one piece?
Usually the height and width of the item. Large machines are measured against the route out on the A90 or A96 before a lorry is booked, and anything that will not travel whole is split at a joint the manufacturer accepts.
We are bringing a line into Aberdeen. Can you handle just the receiving end?
Yes. Offloading, positioning, levelling and setting to line can be taken on their own. Send the layout it is going into and we check the doors, bases and floor first.
Can we keep producing while we move?
In most cases, yes, for part of the plant. We move the lines you can spare first and get them running at the new site, then bring the rest across. It means more visits, and it keeps output going while the move is under way. We tell you at survey which parts can overlap.
How are disconnection and recommissioning handled?
We agree who does what at survey and write it into the programme. It is a mix of our crew, your maintenance team and the equipment manufacturers, and everyone knows their part before the first machine moves. Recommissioning is done with your engineers or the manufacturer.
Get a quote for factory relocation in Aberdeen
- Phone: 01224 003 165
- Email: aberdeen@synergy-lifting.co.uk
Send us both addresses, a rough machine count and the date production has to restart, and we will come back with how the move would run.
We also provide factory relocation in Edinburgh, Grangemouth, Glasgow and Newcastle. See all the factory relocation locations.