Contents
Plant room strip out in Wigan and across Greater Manchester
When a boiler house or refrigeration plant room in Wigan reaches the end of its life, the call comes from a food and drink producer, a firm on Martland Park or South Lancashire Industrial Estate, a distribution shed along the M6, or a landlord in Wigan or Leigh town centre. We strip out the old boilers, chillers, switchgear and air handling units, carry them out and set the new units in their place, on dates the M&E contractor gives us.
We cover the town with Pemberton, Ince, Hindley and Standish, out to Leigh, Ashton-in-Makerfield and Skelmersdale. Photos of the plant and the doors and stairs it must pass let us survey from the desk and price the same working day. Nights and weekends can be booked.
What a strip out covers
We cut or unbolt the old plant into pieces the route will take, with the tanks, pumps and dead pipework around it, and load it onto our wagons. The replacement comes in the same way and we set it level on its bases. Pipework, electrics and commissioning stay with your M&E contractor, whose fitters work alongside us.
What comes out of a Wigan plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Refrigeration packs and chillers | Shed roofs, engine rooms and fenced yard compounds | Lifted off whole from the yard, or stripped down in place |
| Boilers and calorifiers | Boiler houses and rooms under office blocks | Taken down section by section and skated to the door |
| Air handling units | Office rooftops and mezzanine plant decks | Fan and coil sections parted, casing lowered in panels |
| Pumps, pressure units and water tanks | Low plant rooms and tank rooms | Jacked clear and run out through the existing doorway |
| Transformers, switchgear and generators | Electrical rooms in sheds and office cores | Gantried off the plinth and skated to the loading point |
| Redundant pipework and brackets | Along risers, walls and ceiling runs | Cold cut to carrying lengths and cleared as each area empties |
We plan around whichever piece has the tightest way out. That can be a calorifier boxed in behind a boiler rather than the biggest chiller on the roof. The plant room strip out service page explains each stage.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Wigan
Wigan plant rooms sit mainly behind production and trading floors.
Behind the food and drink lines
Boilers, steam plant and refrigeration packs leave the borough’s food factories when a site renews its utilities, on a route the hygiene team approves. See our food and beverages page.
Wigan and Leigh town centres
Heating and cooling plant leaves shops and offices from basements and flat roofs, with tenants trading below and hours set by the landlord. See our construction sector page.
Around junction 25 and out to Skelmersdale
Standby generators, switchgear and roof cooling on these warehouses are replaced while vehicles keep moving, with heavy moves in the quiet spells. See our industrial sector page.
Head offices on the two big estates
Boilers and air handling plant leave headquarters buildings on Martland Park and South Lancashire Industrial Estate, from rooms behind the offices or the roof, around the working week. See our HVAC sector page.
Compressor and boiler rooms in the engineering works
Compressors, boilers and the electrical plant feeding press shops come out during a planned stop, with neighbouring bays still at work. See our aerospace and automotive pages.
Access and planning for a Wigan plant room strip out
Before we price a Wigan job, we settle:
- Keeping the building running. Hours, noise, a booked lift and boarded routes are settled with the facilities manager, and on a food site with the hygiene team too.
- How far each unit breaks down. Panel and flange joints set how small the plant gets. If the heaviest piece left can travel on skates, the crane stays off the order.
- Roof or ground floor. Lifting off the roof costs a crane and a closure and is quicker. Coming down through the building saves the crane and spends labour and days on stairs and corridors.
- Slabs, ducts and old pit ground. On skates or jacks the weight goes through a small patch of slab, and a lot of the borough sits on former pit ground, so we check floors, ducts and where the crane stands.
- The approach and the closure. Cranes and wagons reach most sites in the borough along the A49 or the A577, so arrival times are planned around their busy hours. The traffic management and road closure for a crane or lay-down area goes through Wigan Council.
Before anything is lifted
Behind a food line or a Leigh shop, the plant is valved off, emptied and padlocked before cutting, confirmed in writing by the M&E contractor. Refrigerant recovery is done by an F-gas certified engineer. Asbestos picked up by the R&D survey is dealt with by a licensed contractor before our crew arrives.
We put those dates on our quote, with ours after them. In a Wigan or Leigh town-centre building the landlord gets the same list, so tenants know which nights the route is in use.
Postcodes and areas we cover
We cover every WN postcode and the districts around the borough:
- Wigan: town centre, Haigh, Ince, Swinley, Pemberton, Worsley Mesnes and Hindley
- North and west: Standish, Shevington, Appley Bridge and Skelmersdale
- South and east: Ashton-in-Makerfield, Bryn, Leigh and Atherton
- Wider area: Bolton, St Helens, Warrington, Chorley and Ormskirk
We strip out plant rooms right across the UK.
Why Wigan firms choose Synergy Lifting for plant room strip out
- Your M&E programme sets our dates. Our days sit between the isolations and the new plant delivery, with our supervisor reporting to their site lead.
- Night and weekend shifts. Landlords in Wigan and Leigh and the borough’s food producers get the hours they ask for.
- We bring the crane and the wagons. Our riggers work inside, the old plant leaves on our wagons and we set the replacement units on their plinths.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Other services on Wigan plant room jobs:
How a plant room strip out works
- Start with the plant list, where the room sits and photos of the route out.
- We come and look, then agree the route and where we split each unit.
- RAMS and a lift plan follow, and our days go in once the M&E contractor says when the plant goes dead.
- Our crew takes the plant apart, runs it out through the building and loads it away.
- Replacement boilers or packs are levelled where the old stood, and your M&E contractor’s fitters connect them.
Common questions
The plant room is above a shop in Wigan town centre. How does the old plant reach the street?
Down the stairs or goods lift in pieces sized to fit, or off the roof by a crane in a closed section of road, timed outside shop hours.
Our boiler house in Wigan serves a food line. Can the change happen in one shutdown?
Yes, where the new boilers are on site before the stop. The old units are cleared first and the replacements landed straight after, leaving your M&E contractor time to connect and test.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Wigan
- Phone: 01942 943 023
- Email: wigan@synergy-lifting.co.uk
Ring or email with what needs to come out, which floor it is on and whether new plant replaces it, with shots of the plant and the yard or street outside.
We also provide plant room strip out in Warrington, Preston, Manchester and Liverpool. See all the plant room strip out locations.