Contents
Plant room strip out in Leeds and across West Yorkshire
We strip out plant rooms in Leeds for hospital and health buildings, schools and colleges, the university and laboratory estate, city-centre offices, and factories south and east of the centre that run their own energy centres. We take out the old boilers, chillers, generators and air handling units, and land the replacements anywhere from a Holbeck cellar to a city-centre roof.
We cover Leeds, Morley, Pudsey, Horsforth, Garforth, Wetherby and Otley, with Wakefield, Bradford, Huddersfield and Harrogate beyond. Send photos, and a desktop survey and quote come back the same day. A lot of it is done out of hours or in a shutdown, because the rest of the building is still in use.
What a strip out covers
We break the old plant down and get it out whichever way the building allows. That covers everything from calorifiers and condensers to switchgear, transformers and the pipework between them. Your M&E contractor runs the programme and keeps the pipework connections, electrics and commissioning. We work to their dates, alongside their fitters.
What comes out of a Leeds plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Tanks, pump sets and pressurisation units | Basements and tank rooms | Jacked up, skated out the door |
| Boilers and calorifiers | Lower ground plant rooms | Split at the sectional joints, skated out |
| Chillers and condensers | Roofs and compounds | Crane lift from the roof, or modules down inside |
| Air handling units | Roof level and internal rooms | Unbolted at the section joints into panels and coils |
| Transformers, generators and switchgear | Energy centres and switchrooms | Gantried to the bay, craned onto the wagon |
| Redundant pipework and steelwork | Through the room and risers | Cold cut to what the goods lift takes |
What decides the method is the tightest bit of the route, which is often nowhere near the heaviest unit. The plant room strip out service page has more.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Leeds
In Leeds the calls come mostly from these.
Boiler houses in Holbeck, Hunslet and Cross Green
Boilers, compressors and pumps come out of plant rooms south and east of the centre, the busiest part of what we do in Leeds. Production stops with them, so these are shutdown jobs. See our industrial sector page.
School and university plant in the holidays
Boilers, calorifiers and chillers leave the education estate between terms, so the window is short and the end date holds. See our education sector page.
Refrigeration at the food and drink makers
Chillers, compressors and utility plant leave production buildings across West Yorkshire, and the route has to stay clear of the clean areas, so we walk it with your technical team first. See our food and beverages page.
Roof decks and basements in the centre
Rooftop air handling units and basement boilers come up for replacement on a cycle. The floors between are still let, so we share the loading bay and agree evening work with the landlord. See our HVAC sector page.
Hospital and laboratory plant that stays live
Heating and cooling plant leaves the healthcare and laboratory estate a piece at a time, with the new proven before the old comes down, inside the hours the estates team allows. See our healthcare and pharma page.
Access and planning for a Leeds plant room strip out
We settle these before a date goes in the diary:
- Floor loading. The floors were not built for a boiler on skates. Older buildings in Holbeck and Hunslet sit on made ground with cellars under the pavement, so we check the whole route.
- Tenants and hours. We need the estates manager’s agreement on hours, noise, a lift for our use and how the route is protected.
- Where a crane can legally stand. Bus gates and pedestrianised streets limit the options, and the tunnelled inner ring road keeps tall loads off it. Leeds City Council grants the closure, and we apply and run the traffic management on the day.
- Roof or stairwell. A crane reaching the roof plant is usually the quicker job, even paying for the closure. Carrying down inside means lifts, stairwells, corridors and a lot more labour.
- Where the plant splits. Large units come apart at their panel and flange joints, and that sets the weight of the heaviest piece and whether we need a crane.
Before anything is lifted
Three other trades have to sign off before we start. In a Leeds building the plant is made dead, emptied and locked by the M&E contractor’s fitters, and they confirm it to us on paper. An F-gas certified engineer takes out any refrigerant, and we book in after them. If the R&D survey finds asbestos, a licensed contractor removes it and certifies the room.
Each of those gets a date in the programme when we quote. If one slips, our crew moves with it.
Postcodes and areas we cover
We cover every LS postcode and the West Yorkshire districts around it:
- Leeds: city centre, Holbeck, Hunslet, Burley, Headingley, Harehills, Armley and Wortley
- North and west: Bramley, Pudsey, Horsforth, Otley and Ilkley
- South and east: Morley, Rothwell, Cross Green, Garforth and Wetherby
- Wider area: Wakefield, Bradford, Huddersfield and Harrogate
We strip out plant rooms right across the UK.
Why Leeds firms choose Synergy Lifting for plant room strip out
- We work in occupied buildings. Hospitals, schools, offices and university buildings across Leeds keep running while we work, on hours set with the estates team.
- The price holds. We fix the route out and where each unit splits before you get a quote, so it does not change when we turn up.
- Nobody hands over mid-job. Our own crews lift the roof plant, skate out the basement plant and set down the replacement.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Other services that come into Leeds strip out jobs:
How a plant room strip out works
- Give us the old and new plant, where the room is and a few photos.
- A site visit sorts out the route and where each unit splits.
- Our lift plan and risk assessment go in with the method statement, and our days are booked once the plant is isolated.
- The plant comes apart and goes out on skates and gantries to our wagons.
- Whether it came off the crane or up the stairwell, the replacement is set on its plinth and levelled for your M&E contractor.
Common questions
The plant room is off a pedestrianised street. Where does the crane stand?
Back from the building, on a road or car park closed for the day, with the reach worked out to clear the building line. Bus gates rule out many positions, so central lifts go in an evening or Sunday slot.
Can a strip out fit inside a school or college holiday?
It depends on the plant and the route, and the survey will tell you. We work back from the reopening date and say before you commit whether the break is long enough.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Leeds
- Phone: 0113 734 1504
- Email: leeds@synergy-lifting.co.uk
Name the plant and the floor, and say whether a replacement follows it in. Pictures of the route, plus the street where a wagon might stop near the bus gates, help us price.
We also provide plant room strip out in York, Doncaster, Sheffield and Manchester. See all the plant room strip out locations.