Plant room strip out in Teesside and across the Tees Valley
Teesside plant room work comes off the process side first, from energy centres and boiler houses behind operating sites, then the port and the yards, the estates and the redevelopment at Redcar. The plant that comes out runs from chillers and air handling units to boilers, tanks, pumps, switchgear, transformers and generators, and replacements are levelled on their plinths.
Stockton-on-Tees, Thornaby, Yarm, Eaglescliffe, Billingham, Redcar, Guisborough and Hartlepool sit inside our patch, and our Darlington hub is a short run west on the A66, one of several bases our crews work from. A plant schedule and photographs, taken under the operator’s camera permit, get a quote the same working day.
What a strip out covers
Each item is taken down to what the route will carry and moved out on skates and gantries. Replacement plant makes the same trip in reverse. The programme is your M&E contractor’s, and so are the pipework, electrics and commissioning.
What comes out of a Teesside plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Standby generators, transformers and switchgear | Energy centres and switchrooms | Slid off the base under a low gantry |
| Chillers and condensers | Roof steelwork, podiums and yard compounds | Hooked off outside, or reduced inside and brought down |
| Boilers and calorifiers | Below and at ground level | Flue and burner off, shell broken at its joints |
| Air handling units | Roof decks and riser rooms | Coils, fans and casing released at their joints |
| Pressurisation units, pumps and tanks | Tank rooms and plant room floors | Lifted clear of the plinth and rolled to the opening |
| Redundant pipework and support steel | Plant rooms and the risers above | Cold cut to lengths the stair turns will take |
The method follows whichever item has the roughest trip to the loading point, and that is seldom the heaviest one. The plant room strip out service page goes into more detail.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Teesside
On Teesside the work divides between operating sites and the towns.
Utilities and energy centres on operating sites
Out of these rooms come the boilers, compressors and pumps a process building runs on, and taking the plant room down takes production with it. Dates come off the site’s shutdown programme and shifts run overnight. See our chemicals sector page.
Quayside workshops and yard buildings
Air handling, compressor and standby plant comes out of workshops and welfare blocks along the estuary, where the wagon has to fit the yard and the lift round vessel movements. See our maritime page.
Units at Mandale Park, Thornaby and Stockton
Rooftop cooling and packaged heating plant comes off units on these estates while the floor below keeps working, so most of it leaves by a roof opening or one yard door. See our industrial sector page.
Redcar and the redevelopment ground
Boilers and switchgear come out of the old buildings on the redevelopment ground, clearing each room back to the slab before anything new is set in it. See our construction sector page.
Offices and civic buildings in the towns
Basement boilers and roof-mounted cooling come out of let buildings in Stockton, Thornaby and Yarm, where one goods lift serves everybody and evening hours need the landlord behind them. See our HVAC page.
Access and planning for a Teesside plant room strip out
What a Teesside strip out is priced against:
- Which way it leaves. A crane in the yard that can reach the roof plant takes days off the job compared with carrying it down.
- Joints and sections. Panel joints, flange joints and sectional boilers fix how small a unit gets, and the heaviest piece left settles whether a crane has to stand in the yard at all.
- Site rules. Inductions, permits to work, exclusion zones and the hours we may be noisy are agreed with the operator or building manager first.
- Reclaimed ground. Buildings beside the Tees stand on reclaimed ground with thin records, and a loaded skate puts a lot of weight on a small area, so slabs and voids are checked before we price.
- Closing a road or a yard for the lift. A crane working over a building costs a lane or a row of parking bays for the day. We apply for the traffic management and road closure to whichever council holds the road: Stockton-on-Tees, Hartlepool, Middlesbrough or Redcar and Cleveland.
Before anything is lifted
Three sign-offs land before our crew books in. Under the operator’s permit to work, the M&E contractor makes the plant dead and empty, locks it, and signs it over on paper before any cutting starts. Refrigerant on a cooling system goes to an F-gas certified engineer, and we start once the certificate is issued. Anything an asbestos survey turns up is cleared and certified by a licensed contractor first.
Each of the three gets a date in the programme at quoting stage, and our shifts are built to follow them.
Postcodes and areas we cover
Every TS postcode is covered, across the Tees Valley:
- TS1 to TS8: Middlesbrough town centre, Marton, Nunthorpe, Berwick Hills and Grangetown
- TS9 to TS14: Stokesley, Great Ayton, Guisborough, Skelton, Redcar, Marske and Loftus
- TS15 to TS21: Thornaby, Ingleby Barwick, Yarm, Eaglescliffe, Stockton-on-Tees and Norton
- TS22 to TS29: Wynyard, Billingham, Seaton Carew, Hartlepool, Wingate and Trimdon
We strip out plant rooms right across the UK.
Why Teesside firms choose Synergy Lifting for plant room strip out
- Permit sites are a normal week. Our crews here work under inductions and permits most weeks, and the lift plan is written to the site’s rules.
- Out-of-hours shifts are in the quote. Much of this work runs at night, at weekends and inside shutdowns, and those hours are in the method statement.
- One project lead. The crane, the riggers, the removal and setting the new plant all run under one person on our side.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Booked alongside a Teesside strip out:
How a plant room strip out works
- Tell us what comes out, what goes in and where the room sits, and whether the site lets you photograph the route out.
- On site we walk the route to the wagon, find where each unit separates and weigh up the heaviest lift left.
- We issue the lift plan and RAMS, and set our dates once the M&E contractor has the plant isolated.
- The plant comes apart, travels the protected route and loads out on our wagons.
- The replacement is set level on its plinth, and the M&E contractor’s fitters make the joints under the site permit.
Common questions
Will wind off the estuary stop a roof lift?
It can, on the river and along the coast, so a crane day carries spare time and the heaviest picks go early in the window. The crew works on inside meanwhile.
Our unit on the A19 has only the yard for a crane. Is that enough?
We measure the reach from the yard to the roof plant and check outrigger loads against the surface, laying mats where the ground asks. Where the yard falls short, the plant splits and comes down inside.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Teesside
- Phone: 01642 843 216
- Email: teesside@synergy-lifting.co.uk
Give us the plant list, where the room is and whether it is being replaced. Pictures that follow the route from the room to the yard or quay where a wagon can pull in are the most useful.
We also provide plant room strip out in Middlesbrough, Hartlepool, Darlington and Durham. See all the plant room strip out locations.