Plant Room Strip Out Darlington

Plant room strip out in Darlington and across County Durham

Most Darlington plant room work is on the industrial estates, in boiler houses and energy centres serving units at Faverdale, Lingfield Point and Yarm Road. After that come hospitals and health centres, schools and colleges and town centre offices. We take out the old boilers, calorifiers, chillers, condensers, air handling units, tanks, pumps, switchgear, transformers and generators, and set the replacements down, whether on an estate floor at Faverdale or a town centre roof. Your M&E contractor owns the programme and we work to it.

We cover Darlington with Cockerton, Haughton, Hurworth and Heighington, north to Newton Aycliffe and out to Barnard Castle, Richmond and Northallerton. One of our depots stands on the Cleveland Industrial Estate, so the room gets looked at before you commit. Photographs and a plant schedule bring a quote back the same working day.

What a strip out covers

Each unit comes apart into pieces that clear the doors, lifts and stair turns, and goes out on skates to the wagon. The replacement follows the same route in. The pipework, wiring and commissioning are your M&E contractor’s.

What comes out of a Darlington plant room

Plant Where it sits How it comes out
Pipework and support steel Overhead in the room and risers Cut cold, carried out in lengths the stairs take
Boilers and calorifiers Below ground and at street level Burner and flue away, shell parted at its sections, skated out
Chillers and condensers Roof decks and yard compounds Lifted off whole, or reduced on the deck and taken down inside
Air handling units Roof level and internal rooms Unbolted at the module joints, panels and coils separately
Tanks, pumps and pressurisation sets Tank rooms and basements Jacked off the plinth, rolled to the loading point
Generators, switchgear and transformers Energy centres and substation buildings Slid off the base on a low gantry, out the door

It is the unit with the worst way out that decides the method, and often that is one of the lighter ones. The plant room strip out service page explains the rest.

Contact us

Get In Touch

Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.

    Where we work in and around Darlington

    Around Darlington it is mostly these:

    Boiler houses on the Faverdale, Lingfield Point and Yarm Road estates

    Boiler and compressed air plant comes out of the rooms behind the production floor, and stopping it stops the line, so we work in a shutdown. See our industrial sector page.

    Hospital and health centre estates

    Boiler plant, chillers and air handling units come out of buildings that stay open throughout, on hours the estates team sets and a route it approves. See our healthcare and pharma page.

    Substation and water treatment buildings

    Pumping sets, switchgear and transformers come out through a single door, on outage dates the operator fixes. See our power and renewables page.

    School and college buildings

    Old boilers and air handling plant leave these buildings in the holidays, against a reopening date that does not move. See our education page.

    Offices and mixed use in the town centre

    Rooftop and basement plant comes out of buildings that stay let, so the loading bay, the goods lift and evening hours go through the landlord. See our HVAC page.

    Access and planning for a Darlington plant room strip out

    We settle these before pricing a town job:

    • Closing a street, and somewhere to lay the plant down. Standing room in the centre is short, with pedestrianised and one-way sections through it, so the crane position and lay-down are fixed early. The road closure and traffic management go through Darlington Borough Council, and we make the application.
    • Floors and ground. Jacks and skates bear down hard on a small patch of floor. Older estate buildings were slabbed for lighter loads, and land near the Skerne can be made or soft.
    • Breaking it down. Large units separate at panel and flange joints, and how far down we take them sets the heaviest piece and whether a crane is needed.
    • Crane or carry. A lift from outside usually works out cheaper than stairwells and floor protection.
    • A building that keeps working. The hours we can be noisy, the doors and lift we use and who tells the tenants go to the building manager first.

    Before anything is lifted

    Other trades have three jobs to finish before our crew starts. Isolation, draining and lock-off sit with your M&E contractor, whose written sign-off we need before a Lingfield Point or Yarm Road plant room is touched. On a cooling system the refrigerant comes out with an F-gas certified engineer, and we book in behind the certificate. If the asbestos survey for demolition or refurbishment turns something up, a licensed contractor clears the space and certifies it.

    Our dates hang off those three, and each one goes in the programme with the day it has to land. The quote says who covers what.

    Postcodes and areas we cover

    We cover the DL postcodes and the districts around the town:

    • Darlington: the town centre, Faverdale, Lingfield, Haughton, Harrowgate Hill, Cockerton and the Cleveland and Yarm Road estates
    • North: Newton Aycliffe, Shildon, Sedgefield, Bishop Auckland and Heighington
    • South and west: Barnard Castle, Middleton-in-Teesdale, Leyburn, Richmond and Hurworth
    • Wider area: Catterick, Northallerton, Stockton-on-Tees, Durham and Middlesbrough

    We strip out plant rooms right across the UK.

    Why Darlington firms choose Synergy Lifting for plant room strip out

    • Short notice is workable. The run from the yard to a Darlington plant room is minutes, so an urgent plant failure stands a better chance of getting a crew quickly.
    • Evenings, weekends and shutdown weeks. Heating and cooling changes around the town are booked outside working hours, on times settled with the estates team.
    • One firm from start to finish. We supply the crane and the gang, clear the old plant on our wagons and put the replacement down.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a plant room strip out works

    1. We need the plant coming out and going in, the floor, your window and some photos of the way out.
    2. At survey we agree the way out, where each unit separates and the weight of the largest section.
    3. Paperwork next: lift plan, method statement, risk assessment. Our days go in after the isolations.
    4. The plant is broken down, rigged along the protected route and loaded out.
    5. We level each replacement on its plinth and leave the pipe and cable ends for your fitters.

    Common questions

    Can an energy centre at Faverdale come out over a shutdown weekend?

    That turns on the plant, the opening it comes through and how far it splits. We work back from the hour production restarts and fit the crane, crew and wagons into that window.

    Our site is at Newton Aycliffe. Who arranges a road closure there?

    Durham County Council covers Newton Aycliffe and the villages north of the town, and Darlington Borough Council the town itself. We apply to whichever the address falls under and supply the traffic management.

    Can the building stay open while the plant comes out?

    Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.

    Who isolates and drains the plant before you start?

    Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.

    Get a quote for a plant room strip out in Darlington

    Ring or email with the plant, where it is in the building and whether you are replacing it. Photographs of the way out help, and from our Cleveland Industrial Estate depot someone can walk whatever they miss.

    We also provide plant room strip out in Teesside, Middlesbrough, Durham and Hartlepool. See all the plant room strip out locations.