Contents
Plant room strip out in Reading and across Berkshire
Calls come from data centre operators on the M4 corridor, landlords holding offices at Green Park and in the town, hospital and health centre estates, schools and colleges, and the plant rooms serving the industrial estates. We break the old plant down, get it out of the building and off site, then land the new units on their bases. The M&E programme sets our dates and our crew works beside theirs.
Caversham, Green Park, Theale and Calcot are close work, with Winnersh, Wokingham, Bracknell, Newbury, Maidenhead and Slough beyond them. A plant schedule and photographs of the way out bring the survey and the price back within the day. Evening, weekend and shutdown shifts go in wherever the building calls for them.
What a strip out covers
Most jobs involve some mix of chillers, condensers, AHUs, boilers, calorifiers, pumps, tanks, pressurisation sets, switchgear, transformers and generators, plus old pipework and steel. Every item is brought down to a size the route will take, then loaded out. The replacement follows the same path in and is set level on its bases.
What comes out of a Reading plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Generators, UPS modules and switchgear | Rooms beside data halls, and energy rooms | Skated along a boarded route onto the tail lift |
| Boilers and calorifiers | Basement and ground floor boiler houses | Burner and doors off, shell parted, rolled to the bay |
| Chillers and condensers | Office roof decks and compounds | Lifted out whole when the yard takes a crane, otherwise broken down and walked out inside |
| Air handling units | Top floor rooms and roof decks | Unbolted at the casing joints, a module at a time |
| Pressurisation sets, pumps and tanks | Basement tank rooms and service risers | Raised on toe jacks, walked out on skates |
See our plant room strip out service page.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Reading
Five building types account for nearly all of it.
Cooling and standby plant in the corridor data halls
Superseded cooling plant, standby generators, UPS modules and switchgear leave facilities that stay under load, each piece sized to the route over the raised floor. See our data centre infrastructure page.
Green Park offices and the town centre blocks
Rooftop chillers and air handling units wear out while the floors below stay let, and basement boilers go the same way. A shared loading bay and one goods lift shape the plan. See our HVAC page.
Boiler houses on the Theale, Calcot and Winnersh estates
Compressor rooms, site utilities and the boilers behind them give their plant up inside a planned shutdown, because production stops when the plant room does. See our industrial sector page.
School, college and university buildings across Berkshire
Vacation weeks are when boiler houses, calorifiers and ventilation plant leave a teaching building, inside a hard-ended window. See our education page.
Wards, clinics and health centre buildings
Heating and cooling plant is changed with patients and staff inside, so the estates team fixes the hours, the route and the noise limits. See our healthcare and pharma page.
Access and planning for a Reading plant room strip out
Before we give a date for Reading work, we look at:
- Over the roof or out through the building. A crane at roof level trades a standing position and road space for the crew hours stairs, lifts and floor protection eat. The two routes price a long way apart.
- The hours a live building gives. Data halls and let offices on the corridor set the window, and the programme runs back from its finish time. Permits, escorts, lift bookings and noise limits are settled with the building manager.
- Where each unit splits. Panel and flange joints decide the weight of the heaviest piece that travels, and that settles whether a crane is booked.
- Floors and yards. Jacks and skates put a lot of weight through a small footprint. Raised access floors, made ground by the Thames and the Kennet, and yards over drainage are checked and plated.
- Somewhere for the crane and the old plant. Lifting over a building takes a carriageway or a stretch of car park, plus room to set sections down. The traffic management and road closure goes to Reading Borough Council, Wokingham Borough Council or West Berkshire Council, depending on the street, and we make the application.
Before anything is lifted
Your M&E contractor carries out the mechanical and electrical isolation, the drain down and the lock-off, and signs that off in writing ahead of our first cut. Refrigerant is the F-gas certified engineer’s to remove, and the paperwork reaches us before the cooling plant is opened. Any asbestos the pre-refurbishment survey turns up is cleared first, by a licensed contractor.
All three sit ahead of our dates, and the quote spells out the split. In a corridor data hall or a let office the building’s permit system governs the hours all of it runs in, so we settle the permit route on the first call.
Postcodes and areas we cover
We cover every RG postcode and the districts around the town:
- Reading: town centre, Green Park, Whitley, Earley, Woodley and Caversham
- West of the town: Calcot, Theale, Burghfield, Pangbourne and Newbury
- East and south: Winnersh, Shinfield, Wokingham, Bracknell and Basingstoke
- Wider area: Maidenhead, Slough, Henley, Oxford and west London
We strip out plant rooms right across the UK.
Why Reading firms choose Synergy Lifting for plant room strip out
- The heavy moves go when the building is empty. Evening, weekend and shutdown shifts are ordinary for our Reading crews, with lighting and marshalling written into the plan.
- We start when the M&E contractor is ready. The start date follows their isolations and the delivery of the new plant, and the quote names who covers what.
- One contractor from the road to the new bases. The machine outside, the riggers on the route, the lorries and the crew landing the new units are ours.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Work that runs with a Reading strip out:
How a plant room strip out works
- Pass us the plant schedule and floor, and photograph the route to the bay, yard or data hall compound.
- Our survey works out which way each item leaves, where it parts and the heaviest piece.
- A lift plan and method statement, with its risk assessment, go out dated after each system is isolated.
- The plant is taken out, rigged to the loading point and carried off site.
- The replacement is levelled on its plinths and the M&E team connects it to the data hall or office.
Common questions
Can you finish inside a data hall window that closes Monday morning?
Yes. Each leg of the route is timed at survey and the crew sized to the window, under your permits and escorts. Where one window holds part of the job, it is split across two.
Where does a crane stand for roof plant on a business park?
The survey answers that from the yard drawings. Outriggers go onto mats or plates sized to the bearing pressure, clear of drainage beneath. Where the yard gives nothing, the crane takes road space under a Reading Borough Council closure.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Reading
- Phone: 0800 008 6096
- Email: reading@synergy-lifting.co.uk
Tell us what is being replaced and where it is, with photos of the plant room, its way out and any site permit rules.
We also provide plant room strip out in Oxford, London, Luton and Milton Keynes. See all the plant room strip out locations.