Machine Movement Newcastle

Machine movement in Newcastle and across Tyneside

We provide machine movement in Newcastle for manufacturers, engineering and fabrication firms, hospitals and universities, and riverside and offshore businesses. The work covers single machines and full production lines: installing new equipment, relocating a business from one site to another, internal moves and re-layouts, clearing out plant that has been sold or retired, loading and transport, storage between sites, and breakdown recovery.

We work across Newcastle upon Tyne, Gateshead, North Shields, Wallsend, Washington, Cramlington and Ponteland, and up into Northumberland. Buildings in the city centre and on the Quayside leave little room to stand a vehicle, while the estates south of the river have yards and wider roads. We price most jobs the same working day from a desktop survey.

What a machine move involves

Every move goes through the same stages. The machine is disconnected and made safe, rigged and extracted, transported, then positioned, levelled and set down on its mounts. A crane and a low loader handle some jobs. Others stay indoors and use jacks, skates and gantries throughout. The weight, the route out of the building and the time you can give us tell us which.

What we move in Newcastle

Equipment Where it usually is How it moves
Machine tools, CNC centres and presses Engineering units on Team Valley and the Gateshead estates Lifted on jacks, run out on skates and loaded at the door
Fabrication plant, rolls and welding positioners Riverside works on both banks of the Tyne Craned from the yard or quay onto a low loader
Assembly and process lines Manufacturing units across Tyneside and south east Northumberland Split into modules, labelled and rebuilt in the new layout
Racking and conveyor systems Distribution units around Team Valley and the A19 Taken down and refitted in phases between shifts
Scanners, analysers and lab benches Hospital and university buildings in the city Air skates over a protected floor, set down on marked positions
Air handling units, chillers and boilers Rooftops and plant rooms in city-centre buildings Crane to roof level, then rolled across on skates

Tell us the weight, the size and both locations and we will come back with a plan. The machine movement service page covers each stage in more detail.

Contact us

Get In Touch

Please leave a few details and a member of our machine movement team will be in touch to discuss your requirements in more detail.

    Where we work in and around Newcastle

    Our machine movement work in Newcastle spreads across these sectors.

    Team Valley and the Gateshead estates

    Team Valley Trading Estate and the estates beside it are full of manufacturers, engineering firms and distribution units. A firm moving to a bigger unit on the estate needs its machines taken across in order, and a new machine arriving by lorry needs lifting off and setting on its base. See our industrial sector page.

    Riverside engineering and the port

    Engineering, fabrication and offshore work still lines the Tyne. We load heavy plant from works yards onto transport and shift machines between bays when a works reorganises. Loads here are big, so a crane and a low loader are usually on site. See our maritime and power and renewables pages.

    Hospitals, universities and public buildings

    Newcastle has a large hospital, university and college estate. Imaging equipment, laboratory analysers and plant room machinery go in and come out while wards, lecture rooms and labs carry on around us. Routes and timings are agreed with the estates team before anything moves. See our healthcare and pharma and education pages.

    City-centre buildings and plant rooms

    Around the Quayside and Grainger Town we replace chillers, air handling units and generators on roofs and in basement plant rooms, craning or skating the old units out and the new ones in. Regeneration schemes also bring new plant into buildings under fit-out. See our HVAC and construction pages.

    Rail and infrastructure

    The East Coast Main Line, the Metro and the substations that feed them need equipment changed inside possessions and overnight closures. The railway sets the start and finish times, and we plan backwards from them. See our rail sector page.

    Access and planning for a machine move in Newcastle

    Points we check on most Newcastle jobs:

    • Getting loads in and out. Heavy loads reach Tyneside on the A1 and the A19. Low bridges, weight limits, height restrictions and the river crossings shape the route for a tall load, and we fix it before we quote.
    • The city centre and the Quayside. Narrow streets, bus lanes and busy footways leave little space to park a trailer or stand a crane. Central load-outs are booked for an evening or a Sunday.
    • Floors and ground. Quaysides, reclaimed riverside land and basements under pavements are checked before we set up a crane or lay a skate route. Where a floor needs help, we spread the load with steel plates or mats.
    • Production stops. We need to know when the machine can stop and when it has to be running again. Setting up and clearing away come out of that time, and we plan for both.
    • Road closures. If a load-out needs part of a road or pavement, we can arrange the traffic management and apply to Newcastle City Council or Gateshead Council for the closure.

    Moving large or heavy machinery by road

    A vehicle and load over 44,000kg gross, 2.9m wide or 18.65m long is an abnormal load. Up to 80,000kg the highway and bridge authorities need two clear working days’ notice through ESDAL, rising to five above that, when the police need notice too. Loads over 2.9m wide or 18.65m long also need two clear working days’ notice to the police. Above 150,000kg or 6.1m wide a Special Order is needed, applied for about ten weeks ahead. We handle the notifications ourselves or with your haulier. From Newcastle, heavy loads usually head out on the A1 Western Bypass or the A19.

    Postcodes and areas we cover

    We cover every NE postcode across Tyneside and Northumberland, including:

    • NE1 to NE7: city centre, the Quayside, Jesmond, Gosforth, Heaton, Byker and Walker
    • NE8 to NE13: Gateshead, Team Valley, Dunston, Longbenton, Killingworth and Wideopen
    • NE15 to NE24: Denton, Throckley, Ponteland, Cramlington and Blyth
    • NE25 to NE38: Whitley Bay, Tynemouth, North Shields, Wallsend, South Shields, Jarrow, Hebburn and Washington
    • NE61 to NE71: Morpeth, Ashington, Alnwick and north Northumberland

    We also move machinery right across the UK.

    Why Newcastle firms choose Synergy Lifting for machine movement

    • Priced from a proper look at the job. The machine, the floor and the route out are checked before we give you a figure, so the day runs to the plan you agreed.
    • Used to shared yards and busy estates. Deliveries, crane positions and access for the units next door are planned in advance.
    • One firm from start to finish. Our own people run the crane, skates, jacks, gantries and transport, so you deal with one contractor for the whole move.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a machine move works

    1. Send us the weight and dimensions, where the machine is now, where it is going and your dates. Photos help.
    2. We price it, usually the same working day from a desktop survey. Complex moves may need a site visit first.
    3. We prepare the method statement, risk assessment and lift plan.
    4. On the day we rig, extract, transport and position the machine.
    5. It is set down and levelled, ready for your engineers to reconnect and commission.

    Common questions

    Can you move machinery between two units on Team Valley?

    Yes. Short moves across an estate come up all the time. We check both floors and the route between the doors, agree access with anyone sharing the yard, and plan the order so the machines you need first are running first.

    Can you move machinery at a riverside or quayside site?

    Yes. Quaysides and reclaimed land by the river are checked for what they will carry before a crane or trailer is set up, and we spread the load with mats where needed. On a working quay the timing is agreed around vessel movements.

    Who disconnects and reconnects the machine?

    Mechanical disconnection and making safe is usually ours, and we position the machine precisely enough for commissioning. Electrical and control reconnection is coordinated with your own engineers or the machine manufacturer, and who covers what is agreed at survey stage.

    Can you move a machine that has broken down?

    Yes. Breakdown work is prioritised because production has usually stopped. Call us with the machine details and we will give you a firm attendance time on the call.