Lift and shift in Middlesbrough and across Teesside
Lift and shift is what you need when the load is heavy and a crane cannot get to it. Inside a building, down a basement, along a mezzanine, into a plant room with a metre of headroom above the beam, or onto a foundation in the middle of a working floor with production either side of it. The lifting is done with gantries, skates, rollers and jacking equipment instead of a hook, and the skill is in the route and the ground under it.
On Teesside most of this work comes from two places. Process and energy buildings where the equipment sits deep inside a structure that was built around it. And commercial and institutional buildings where the plant is on a roof or in a basement and the only way in is through the building itself.
What lift and shift covers
Moving, lifting, lowering, turning and positioning heavy items without craneage: out of a position, along a route, and down onto a base to a measured tolerance. It runs from a single transformer through a switchroom door to a full process skid shifted the length of a building. We can usually quote from a desktop survey the same working day, though anything with a genuinely tight route is better with a site visit first.
When lift and shift beats a crane
| The situation | Why a crane does not solve it | How we move it |
|---|---|---|
| Plant inside a working building | Nowhere to stand the crane, and no opening to lift through | Gantry over the item, skates along the route, jacked down onto the base |
| Basement and lower-ground plant | The hook cannot reach below the slab | Lowered on jacking gear or a gantry through an existing opening, then skated |
| Low headroom areas | No height for slings, let alone a hook approach | Low-headroom gantry and toe jacks, lifting in small increments |
| Mezzanines and upper floors | Floor loading, and a route that turns twice | Load spread across the slab, skated on tracks, turned in position |
| Final positioning after a crane lift | A crane places to within a few hundred millimetres, not to a tolerance | Skates and jacks to bring it onto the mounts and level it |
| Live sites with no exclusion zone available | A crane needs an area cleared that the site cannot give up | A footprint the width of the load and its route, worked around production |
Plenty of jobs use both. The crane brings it to the building and we take it from there, which is one contract and one method statement instead of two. See crane hire in Middlesbrough for the outside half.
Contact us
Get In Touch
Please leave a few details and a member of our lift and shift team will be in touch to discuss your requirements in more detail.
Where we work in and around Middlesbrough
The buildings decide this work more than the industries do, but a few patterns repeat on Teesside.
Process and energy buildings
Wilton, Billingham and Seal Sands hold equipment installed before the structure around it was finished. Pumps, compressors, heat exchangers and skids that have to come out along a route that was never a route. See our chemicals sector page.
Energy centres, switchrooms and substations
Transformers and switchgear are the classic lift and shift item: heavy, dense, and behind a single doorway with no room either side. Often the replacement has to go in before the old one can come out.
Engineering works and fabrication shops
Skippers Lane, South Bank and the older riverside works, where machines are repositioned to make room for a new line and the whole move happens inside four walls. See our industrial sector page.
Commercial, healthcare and education buildings
Boilers, chillers, air handling units and generators in basements and rooftop plant rooms, moved through occupied buildings where noise, dust and access times are all constrained. That work often pairs with a plant room strip out.
Food, drink and packaging
Line equipment repositioned inside a hygiene envelope, where wheeled plant and floor protection matter as much as the lift. See our food and beverages page.
Offshore wind and the energy supply chain
Fabrication halls along the estuary, where large assemblies are moved and turned inside the building for the next stage of work. See our power and renewables page.
Access and planning for a lift and shift in Middlesbrough
On a crane job the question is where the crane stands. On a lift and shift it is what the floor will take and what the route is really like:
- Floor loading, every metre of the route. Skates and jacking concentrate a very large load into a handful of small contact points, and a slab that carries a machine standing still will not always carry it moving across a different part of the floor. We check the slab, spread the load with mats or tracks where the figures call for it, and pay attention to basements, ducts and service trenches under the route.
- Headroom, not just height. The clearance that matters is above the item once it is on the equipment, not the height of the item itself. A few hundred millimetres decides between a standard gantry and a low-headroom method.
- The route as it actually is. Door widths, corner radii, floor joints, thresholds, ramps and changes in level. A 40 tonne item that fits through the door and cannot turn the corner beyond it is a wasted mobilisation.
- Protection and reinstatement. Finished floors, painted lines, drainage covers and resin surfaces all mark. We agree what gets protected and what gets made good before anything moves.
- Working alongside production. Most of this happens with the building occupied. Exclusion zones, noise, access windows and who else is working in the area are part of the plan, not an afterthought.
- Permits where they apply. Inside a live process area the move runs on the operator’s permit to work, with isolations, gas-free clearance and hot work certificates governing when each step can happen.
Getting it into the building in the first place
Half the lift and shift enquiries we take on Teesside are really access problems. The item is on a lorry outside and there is no obvious way in. The options, roughly in order of how often they are the answer:
- Through an existing opening, stripped back. A door frame, a window frame or a section of cladding removed and reinstated afterwards is usually cheaper and faster than anything structural.
- Through a roof panel. On portal frame buildings, lifting a panel out and craning vertically into the building is often the quickest route, with the shift done inside from where the crane sets it down.
- In pieces. Stripping an item into sub-assemblies and rebuilding it inside. More work at both ends, and frequently the only option in an older building.
- Through the building. Goods lifts, stairwells and corridors, with every floor loading checked along the way. Common in healthcare and education buildings where there is no external access to the plant room at all.
- A temporary opening. Forming and making good a structural opening, which needs the building owner, a structural engineer and time, so it is the last resort rather than the first suggestion.
We survey for this before quoting, because the answer changes the price more than the weight does. Where the item is oversized on the road as well, we establish the route and any abnormal load notice at the same time.
Postcodes and areas we cover
We cover every TS postcode. These are the areas the work usually comes from:
- Middlesbrough: town centre and Middlehaven, Riverside Park, Cargo Fleet, Skippers Lane, Mandale Park, South Bank and Grangetown
- Redcar and Cleveland: Wilton, Lackenby, the South Tees site and the Redcar estates
- Stockton borough: Thornaby, Preston Farm, Teesside Industrial Estate and Eaglescliffe
- North of the river: Billingham, Seal Sands, Port Clarence, Haverton Hill and Hartlepool
- Wider Tees Valley: Newton Aycliffe, Aycliffe Business Park, Darlington and the A1(M) corridor
We work across the UK from the same depot. See all the areas we cover.
Why Middlesbrough firms choose Synergy Lifting for lift and shift
- We survey the route before we price it. On this work the route is the job. A quote built on a weight and a distance is a guess, and it is the one that turns into a variation on day two.
- The crane and the shift under one contract. Where a job needs both, the lift outside and the move inside are one sequence with one method statement and one company answerable for the handover point between them.
- We work in occupied buildings. Hospitals, offices, schools and live production areas, around access windows, noise limits and people who still have a job to do while we are there.
- Floor loading gets checked, not assumed. Slab capacity, what is underneath the route, and load spread designed to the figures. It is the thing most likely to go expensively wrong on this kind of move.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121 by an appointed person, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
Related services
Lift and shift rarely arrives on its own. The jobs it usually sits inside:
How a lift and shift works
- Tell us the weight, the dimensions, where it is now and where it has to end up. Photographs of the item and of the route between the two are worth more than any description.
- We quote from a desktop survey, usually the same working day. Anything with a tight route, a mezzanine or an unknown slab gets a site visit first, because those are the jobs where a guess costs someone money.
- We produce the method statement, risk assessment and lift plan, confirm floor loading and load spread, and agree access windows and protection with the building.
- We rig, lift, move and position, working in the increments the headroom and the route allow.
- We set down on the mounts, level to the tolerance the equipment needs, and hand over for connection and commissioning.
Common questions
There is no crane access at all. Can it still be moved?
Almost always. Gantries, skates, rollers and jacking equipment do not need a standing position outside, an exclusion zone or airspace, which is the whole reason this method exists. What they do need is a route that has been checked and a floor that will carry the load. Send photographs of the item and the route and we will tell you quickly whether it is straightforward or awkward.
How much headroom do you need?
Less than people expect, but it is the measurement that decides the method. The clearance that counts is between the top of the item and the lowest obstruction over the route, once the item is sitting on the equipment. Where that is very tight we use a low-headroom method and lift in smaller increments, which takes longer and is entirely normal in plant rooms.
Can you work while the building stays open?
Yes, and most of this work is done that way. In hospitals, offices and schools we plan around access windows, noise limits, protected routes and the hours the building will accept, and we agree the exclusion arrangements with whoever manages the building before the date is fixed.
Will you damage our floor?
Not if the route is prepared, which is part of what we quote for. Load is spread with mats or tracks where the slab needs it, finished surfaces are protected, and we agree in advance what gets covered and what gets made good. Resin floors, painted markings and drainage covers are the usual points of care.
How heavy can you go without a crane?
Weight on its own is rarely what stops a lift and shift. In practice the limits are usually the floor, the headroom and the corners. Give us the weight with the route and we will tell you which of the three is your constraint.
Will you satisfy our procurement and prequalification checks?
Normally yes, and we can send the pack before you ask for it. We are SSIP approved and a Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association. Operators are CPCS and NPORS carded, lifts are planned to BS 7121 by an appointed person, and equipment is inspected and thoroughly examined under LOLER and PUWER. Method statements, risk assessments, lift plans and insurance certificates come as standard.
Get a quote for lift and shift in Middlesbrough
- Phone: 01642 843 216
- Email: middlesbrough@synergy-lifting.co.uk
Send the weight, the dimensions and photographs of the route, and we will come back the same working day. We also provide machine movement in Middlesbrough and crane hire in Middlesbrough, and lift and shift across the UK. See the lift and shift service.
We also provide lift and shift in Teesside, Hartlepool, Darlington and Durham. See all the lift and shift locations.