Industrial plant dismantling in Brighton and across Sussex
We dismantle industrial plant in Brighton for hotel and venue operators, hospital and university estates teams, engineering firms on the city’s estates and businesses beside Shoreham Harbour. The work takes in vessels and tanks, pipework, boilers, conveyors and overhead cranes, from one redundant unit in a plant room up to a whole factory floor.
We cover Brighton, Hove, Portslade, Shoreham-by-Sea, Lancing, Lewes, Worthing, Newhaven, Burgess Hill, Crawley and Eastbourne, and we work shutdowns and night shifts where a building needs them. Send photographs and an outline, and a desktop survey and price follow inside the day.
What dismantling covers
The plant is released in the opposite order to the one it was installed in, which is what protects its worth. Some is re-erected elsewhere, numbered and recorded as it is released, then packed for the road. Some sells on as working machinery. The rest is parted into materials sized to be weighed and sold by grade. What you want out of it shapes the method.
What we dismantle in Brighton
| Plant | What decides the method | How it comes apart |
|---|---|---|
| Rooftop chillers and cooling towers | The bay a crane gets at street level | Refrigerant drawn off, coils and panels parted, frame lifted clear |
| Basement boilers and calorifiers | Headroom on the way to the pavement | Split to the narrowest turn, raised on a gantry |
| Silos, tanks and bulk handling plant | Whether the shell stays stable once opened | Braced from inside, then taken down a ring at a time |
| Machine lines, compressors and ductwork | Whether the line is being re-erected | Flanges undone and numbered, or cut to grades where nothing is kept |
| Overhead cranes, gantries and support steel | What the remaining frame still carries | Runways relieved of load, bays released from the far end |
Our industrial plant dismantling service page has the detail.
Contact us
Get In Touch
Please leave a few details and a member of our dismantling team will be in touch to discuss your requirements in more detail.
Where we work in and around Brighton
Dismantling work in and around the city falls into five groups.
Seafront hotels and venues
Kitchen extraction, laundry plant, worn-out chillers and basement boilers leave hotels and venues on the front and in the centre, in the quiet months or overnight. See our HVAC sector page.
Hospital and university estates
Sterilising plant, fume extraction, laboratory services and boiler house plant leave buildings in use, in pieces sized for a corridor or goods lift. See our healthcare and pharma and education pages.
The Portslade and Hollingbury estates
Engineering and trade units give up machine lines, compressors, ductwork and overhead cranes, with our area fenced off from the floor still producing. See our industrial sector page.
Shoreham Harbour and the quayside
Conveyors, hoppers, silos and workshop plant reach the end of their life in the yards beside the harbour, worn by years of aggregate and salt air. See our maritime sector page.
Substations and standby power on the A23 and A27
Old switchgear, transformers, battery plant and standby generators leave substations and critical sites on both corridors, inside a booked outage. See our power and renewables and data centre infrastructure pages.
Access and planning for dismantling in Brighton
Five things are fixed before cutting starts in Brighton:
- The contents, and who signs them off. The site operator or a specialist cleans, purges and certifies the plant, and the cuts are grouped into the shifts those certificates cover.
- Working at height. Most of this cutting is done on structures and roofs, so the lift plan covers working positions, edge protection, restraint on each member as it is freed, and rescue.
- Gradient, street width and listed frontages. The city climbs steeply from the seafront and central streets take one vehicle, so levelling, outrigger loads and safe capacity are set on the real slope. Lifting a section out over a Regency frontage is agreed with the building owner first, and the method sets out what protects the stonework.
- Load left in what stays. Steel and pipework share loads that no longer add up once a neighbour has gone, so the sequence is checked stage by stage and props designed in.
- Crane standing, ground bearing and the run off site. Made ground near the seafront and cellars under a central pavement decide mats and bearing pressures. Sections are sized for a route out to the A23 or A27, and a bay suspension or closure goes through Brighton and Hove City Council.
Dismantling for reuse, or for recovery
Plant with somewhere else to go is taken apart in rebuild order. Numbers go on before anything moves, each position is photographed against the layout, joints are opened at bolts and flanges, and crates are built to what the lorry takes. An air handling unit leaving a Hove roof for a sister building travels that way, and so does a machine sold on.
Once plant has no life left, what it returns depends on the sorting. Stainless is kept off the carbon steel, cable and non-ferrous fill their own containers instead of the mixed skip, and sections are cut to a size that can be weighed and sold. Most jobs hold a bit of each, so name the items you want back and they come off early, marked and listed.
Postcodes and areas we cover
We cover every BN postcode and the Sussex districts around it:
- Brighton and Hove: city centre, The Lanes, Kemptown, Preston Park, Hollingbury, Hove and Portslade
- Along the coast: Shoreham-by-Sea, Lancing, Worthing, Peacehaven, Newhaven and Seaford
- Inland: Lewes, Steyning, Hassocks, Burgess Hill and Haywards Heath
- Wider area: Crawley, Horsham, Littlehampton, Eastbourne and Gatwick
We dismantle plant right across the UK and into Europe.
Why Brighton firms choose Synergy Lifting for dismantling
- Plant rooms handed back clear. Bases, plinths and redundant supports go out with the plant, and openings cut for the route are made good before the crew leaves.
- Every load listed as it leaves. Loads out are recorded by item and by grade with their tickets, so the site can account for what came off the plant.
- The whole job on one contract. The crane and operator, the rigging crews, the cutting teams and the lorries come from us, so the sequence runs without a handover partway.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than dismantling
Dismantling in Brighton draws in other work of ours:
How a dismantling job works
- Give us the plant, what each item held, which pieces you are keeping, and any drawings.
- The survey fixes the break points and an order of work in which nothing is left standing without support.
- Paperwork follows: method statement, risk assessment, lift plan and certificate dates signed off with the site.
- Cutting, lowering and sorting follow that order.
- Load-out closes the job, and anything being re-erected leaves marked, listed and packed.
Common questions
A seafront hotel stays open and the boiler is in the basement. How does it come out?
It is cut to pieces sized for the service stair or area steps, with the route covered and hours agreed with your team. Where hot work is restricted the joints come apart cold before pieces load from a suspended bay.
Can you keep our compressors and clear the rest of a Hollingbury unit?
Yes. The survey produces two lists and the sequence follows them. The compressors are freed at bolts and flanges, numbered against a layout, crated and loaded out first. The rest comes down for material, segregated as it is cut.
How is dismantling different from demolition?
Demolition takes a structure down and the value is in the cleared site. Dismantling takes plant apart in the reverse of the order it went up, so what comes off keeps its value as equipment, as parts, or as material worth more separated than mixed. The planning takes longer and the work is slower, and on the right job it pays for itself.
Who cleans and certifies the plant before cutting?
Cleaning, purging and gas-free certification sit with the site operator or a specialist, and the sequence is planned around those certificates. Several are valid for one shift only, so the cutting is arranged to match when they can be issued. We agree all of that at survey and write it into the programme.
Get a quote for industrial plant dismantling in Brighton
- Phone: 01273 920 125
- Email: brighton@synergy-lifting.co.uk
Tell us what the plant is, what it held and which items are being kept, with photographs or drawings of the area.
We also provide industrial plant dismantling in Portsmouth, London, Southampton and Reading. See all the industrial plant dismantling locations.