Contents
Plant room strip out in Deeside and across Flintshire
Boilers, chillers and air handling units come due for replacement in Flintshire’s college and school buildings, in health buildings around Mold and the coast, in Chester and Queensferry offices, and in energy centres serving the industrial park. Our crew removes the old plant and lands the replacements, English side or Welsh, when the M&E contractor is ready for them.
Connah’s Quay, Shotton and Queensferry, Broughton, Garden City and Sealand are all covered, with Mold, Buckley, Flint, Holywell, Mostyn and Chester. Which side of the border a building stands on is settled first, because road space answers to a different authority. With photographs of the room and the road it leaves by, we can quote that working day.
What a strip out covers
Everything being replaced leaves with us: boilers and calorifiers, chillers and condensers, air handling units, pumps and pressurisation sets, tanks, generators, transformers, switchgear and redundant pipework. We start on a dead, drained and locked-off system and finish with the replacements level, estuary slab or upper floor. New connections, electrical work and commissioning belong to the M&E contractor.
What comes out of a Deeside plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Redundant pipework and steelwork | Voids, risers and trenches | Cold cut to what the route takes and bundled |
| Boilers and calorifiers | Boiler houses and basements | Burner and casing off, the body split and skated out |
| Chillers and condensers | Flat roofs, plant decks and compounds | Lifted whole where a crane reaches, or parted at the joints |
| Air handling units | Roof decks and first floor plant rooms | Panels released, fan and coil sections lowered separately |
| Pump and pressurisation sets, tanks | Pump rooms, risers and tank rooms | Broken off their bases, tanks unbolted a panel at a time |
| Generators, transformers and switchgear | Intake and standby rooms | Jacked off the plinth, skated to the shutter and loaded |
We plan around the item with the worst route out. Weight comes second. See the plant room strip out service.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Deeside
Most Deeside strip outs start in one of these five.
Energy centres on the industrial park
Boiler houses, compressor rooms and standby plant serving a production site come out inside a booked stop, because the room going down stops the line. See our industrial sector page.
Cooling and air plant in the manufacturing halls
Chillers, extract plant and air handling units serve the precision engineering halls across Flintshire and Wrexham, and change over on the hall’s terms. See our HVAC page.
Boiler houses on the college and school estates
Tired boilers, calorifiers and pressurisation sets leave education buildings in Flintshire and Chester in the holidays, on a window with a hard end date. See our education page.
Health buildings from Mold to the coast
Heating and cooling plant in the county’s health buildings changes over without the building losing either service, new units proven before old ones come apart. See our healthcare and pharma page.
Offices and mixed use at Chester and Queensferry
Rooftop condensers, basement boilers and riser pumps leave blocks with tenants above and below, a shared loading bay and a landlord’s view on evening work.
Access and planning for a Deeside plant room strip out
The survey settles these before a date is fixed.
- Which council grants the road. Sealand and Chester sit minutes apart under different highway authorities. We apply for the traffic management and road closure to Flintshire County Council, to Cheshire West and Chester Council over the border, or to Wrexham County Borough Council to the south.
- The hours the building will give us. The building manager gives us the hours, the noise limits, a boarded corridor and a lift for the crew. Loud work goes to an evening or a weekend.
- What the biggest piece weighs once split. A boiler divides at its sections, an air handling unit at its panel joints, and those splits set the crane size or remove the need for one.
- Out over the roof, or out through the corridors. A crane on the yard is the dearer day and the shorter job. The route inside adds stairs, lifts, floor protection and labour.
- Estuary ground. Much of the working frontage sits on old estuary land cut through with drains, so outrigger pressures and mats are confirmed first, and slabs and voids checked along the route.
Before anything is lifted
We need three things done before we cut. The M&E contractor shuts the system down, empties it, locks it off and tells us in writing that it is safe to work on. Any refrigerant is taken off by an F-gas certified engineer. A licensed contractor removes any asbestos the pre-works survey has found.
Our dates are planned behind all three, with a name against each in the quote. Where a holiday or a booked shutdown fixes the far end, the programme is written back from it.
Postcodes and areas we cover
The CH postcodes around the Dee and the LL districts to the south:
- CH4 and CH5: Broughton, Saltney, Queensferry, Shotton, Connah’s Quay, Sealand and Garden City
- CH6: Flint and Bagillt
- CH7 and CH8: Mold, Buckley, Holywell and Mostyn
- CH1 to CH3: Chester, Upton, Christleton and Waverton
- CH65 and CH66: Ellesmere Port, Little Sutton and Great Sutton
- LL11 to LL14: Wrexham, Gresford, Ruabon and Chirk
We strip out plant rooms right across the UK.
Why Deeside firms choose Synergy Lifting for plant room strip out
- Access set by the estates team. College, office and health buildings here tell us when we can be in, and we plan to it.
- Both ends of the job on one programme. The day the room goes clear and the day the replacement arrives are set together.
- One contractor across the whole changeover. From the crane outside to the new units sitting on their bases, it is one order.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Services that run alongside a Deeside strip out:
How a plant room strip out works
- We need the plant list, what replaces it and the window dates, plus photos out to the Flintshire or Cheshire road.
- We come and look, then fix the way out and how far each unit comes down.
- Then we issue RAMS and the lift plan and slot our dates in after isolation and clearance.
- The crew sections the plant, rigs it out along the route and loads it for removal.
- The replacement is set level, and the M&E contractor connects and commissions it for the hall or college.
Common questions
Our unit is at Sealand and the load-out runs into Chester. Who applies for the road space?
We do. Flintshire County Council covers the closure at the building and Cheshire West and Chester Council the road space over the border, with Wrexham County Borough Council for a route running south. Notice periods differ, so both go in early.
Our boiler house at Flint sits behind a working production hall. Does the line have to stop?
Where the plant room feeds the line, the answer is a booked stop, and the strip out, load-out and new units all sit inside it. Where it serves the office side, the work runs alongside production on a fenced route.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Deeside
- Phone: 0151 808 1883
- Email: deeside@synergy-lifting.co.uk
Say what the plant is, where it is in the building and whether new units follow it, and attach photos of the room and the yard or car park a crane would use.
We also provide plant room strip out in Liverpool, Warrington, Wigan and Stoke. See all the plant room strip out locations.