Plant room strip out in Grimsby and across North East Lincolnshire
Cold stores and seafood processors call us in Grimsby, and so do hospitals, colleges and schools changing their heating and cooling, the offshore wind bases and firms with energy plant on the industrial estates. Old plant is broken out and taken off site, from dockside cold stores as much as estate units, and the replacement lands on its bases to whatever timetable the M&E contractor has set.
Our crews cover Grimsby, Cleethorpes, Humberston, Immingham, Healing, Laceby and Ulceby, out to Louth and Brigg. Photographs of the plant and the way out give us a desktop survey and a price the same day. We can work nights, weekends or shutdowns if the building has to keep running.
What a strip out covers
We break down redundant boilers, chillers, air handling units, pumps, tanks, generators and switchgear, with the dead pipework and steel, cutting or unbolting each piece to a size the route will take before rigging it out. The new plant then comes in and our crew sets it level on its bases, where the M&E contractor’s fitters pipe and wire it in.
What comes out of a Grimsby plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Refrigeration compressor and chiller packs | Engine rooms and roof decks on cold stores | Lifted off on one frame, or parted at the manifold |
| Chillers and dry coolers | Flat roofs on offices and estate units | Craned down whole, or opened into modules on the roof |
| Air handling units | Rooftop frames and ceiling plant decks | Fan and coil sections unbolted and lowered |
| Calorifiers and boilers | Boiler houses behind older schools and clinics | Casing off, heat exchanger parted, parts skated out |
| Tanks, pumps and pressurisation sets | Low basements and tank rooms | Trolleyed out, big tanks cut into sheets |
| Standby generators and switchgear | Standby rooms at cold stores and wind operations bases | Panels split, generator walked out on its base frame |
Often it is a small pump boxed in behind a boiler, not the biggest unit, that decides how we go about it. Our plant room strip out service page sets out each stage.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Grimsby
The work in Grimsby follows the cold chain first.
Cold stores around the Fish Docks
Compressor and chiller packs and the standby generators guarding frozen stock leave the town’s cold chain buildings on a plan that holds the rooms at temperature. See our food and beverages page.
Service bases for the offshore wind farms
Heating, ventilation and switchroom plant comes out of the buildings that keep the southern North Sea wind farms running, fitted around each site’s shifts. See our power and renewables page.
Estates west of the town centre
Boiler houses and compressed air rooms feeding engineering units on Europarc and Pyewipe are replaced in a works shutdown. See our industrial sector page.
Health buildings across the borough
Old chillers, boilers and air handling plant leave health sites in North East Lincolnshire in stages, the estates team deciding which wing goes without and when. See our healthcare and pharma page.
Colleges and schools from Scartho to Cleethorpes
Boiler and ventilation plant in teaching buildings comes out over the summer, with the programme built back from the first day of term. See our education page.
Access and planning for a Grimsby plant room strip out
We agree these before a Grimsby job gets a date.
- A building that stays open. Hospitals, schools and offices set our hours, noise limits, lift bookings and route. On a cold store the insulated doors open only at agreed times.
- Kerbside and lay-down. Lifting over the building needs part of a road or car park and a landing spot for the old unit. The closure goes through North East Lincolnshire Council, or North Lincolnshire Council at Ulceby and Killingholme, and we set up the traffic management with it.
- Floors and reclaimed land. Toe jacks and skates put a unit’s weight onto a few points, so suspended slabs on the route are checked first. Much of the land along the bank was reclaimed, and crane mats are sized to suit.
- Where the heaviest piece gets split. Boilers part at their sections and air handling units at their frames, and the largest piece left shows whether a crane is worth bringing into a dockside yard.
- Up over the roof, or out along the corridors. Craning off the roof means a crane on hire and a closure. Taking plant out along the corridors means labour, floor protection and night working. The survey prices both.
Before anything is lifted
In a cold store or clinic, each system is made dead, emptied and locked off by the M&E contractor, who signs before our crew cuts a single pipe. Any refrigerant in the chillers or the cold store plant is recovered by an F-gas certified engineer. Where the survey finds asbestos, a licensed contractor clears it first.
The quote shows who is covering each of those three. Once all of them are confirmed, the crane and crew go into the programme.
Postcodes and areas we cover
We cover every DN postcode around Grimsby and along the bank:
- Grimsby: town centre, the Fish Docks, Pyewipe, Grange, Nunsthorpe, Scartho, Weelsby and Europarc
- Coast: Cleethorpes, Humberston, New Waltham and Tetney
- The bank: Great Coates, Healing, Stallingborough, Immingham, Habrough, Ulceby and North and South Killingholme
- Wider area: Laceby, Louth, Caistor, Brigg, Barton-upon-Humber and Scunthorpe
We strip out plant rooms right across the UK.
Why Grimsby firms choose Synergy Lifting for plant room strip out
- Estates teams set the hours. Hospital, college and school sites across the borough give us their access windows, and the plan follows them.
- Food site rules are written in at survey. Hygiene zones and door times on the processing estates go into the method before a date is fixed.
- Crane, riggers and haulage on one order. We lift, rig, haul away the old units and land the new ones ourselves.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Other work a Grimsby strip out draws on:
How a plant room strip out works
- Tell us the plant and its location, with photographs of each door and stair from the room to the dock or estate yard.
- A survey of that route settles how each unit splits and what the job costs.
- RAMS and a lift plan come next, and our days go in behind the isolations.
- Our crew breaks the plant down, carries it out and loads it away.
- The replacement goes down on its bases and passes to the M&E contractor for connection.
Common questions
Can a boiler change at a Grimsby school finish inside the summer holidays?
Yes, when the survey happens in the spring term. That leaves time to settle the route and fit our dates to the isolations, so the holiday goes on the work itself.
Our Europarc unit has roof chillers above a staff car park. Where does the crane stand?
In the car park, at a weekend or after the last shift. Where the reach falls short, North East Lincolnshire Council closes part of the estate road and the crane stands there.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Grimsby
- Phone: 01482 243 018
- Email: grimsby@synergy-lifting.co.uk
Drop us a line with what needs to come out, where it is and whether it is being replaced. On a cold store, pictures of the engine room and its loading doors mean we can quote straight off.
We also provide plant room strip out in Hull, Lincoln, Doncaster and York. See all the plant room strip out locations.