Scroll to top

Factory Relocation Grimsby

Factory relocation in Grimsby and across North East Lincolnshire

Seafood and food producers, engineering firms on the estates, offshore wind service businesses and process companies along the bank all reach a point where the plant has to change address. One point of contact carries the job through: both buildings surveyed and every item on an asset register, decommissioning settled with your engineers and the machine makers, strip-out and dismantling, lifting the machinery out, packing, crating and haulage, then reinstallation, levelling, setting to line and recommissioning.

We work in Grimsby, Cleethorpes, Healing, Laceby, Stallingborough, Immingham and Ulceby, and out to Louth, Caistor, Brigg and Scunthorpe. A desktop survey prices a smaller move on the working day it reaches us.

What a factory relocation covers

The job can be a complete works or one department, taking in machine tools, presses, injection moulding machines, packing lines and conveyors. Machines you have finished with go for sale or disposal in the same visit, leaving the old building empty for handover. Where the new premises are behind your leaving date, equipment waits in our storage.

Factory moves we plan in Grimsby

Type of move What sets the timetable What we handle
Moving to a bigger or newer unit Sign-off on the new floor, bases and supplies Both buildings walked, then extraction, haulage and rebuild
Bringing two sites onto one When the site you keep can clear floor space A single asset register, with arrivals ordered around plant already running
A closure, with working plant going to a sister factory here or abroad The install slot the receiving factory offers Decommissioning, export cases and clearance of what stays behind
Rearranging a factory within the same building or site The output you have to protect Machines walked to new positions area by area and set to line
A single line or department moving The length of the shutdown you can give it Marking up the line, splitting it and building it back

The full method is on our factory relocation service page.

Contact us

Get In Touch

Please leave a few details and a member of our factory relocation team will be in touch to discuss your requirements in more detail.

    Where we work in and around Grimsby

    Relocation work here spreads across the town’s main industries and estates.

    Producers on the processing estates

    Line equipment heading for a bigger hall is wrapped for the road and rebuilt to your hygiene team’s standard. See our food and beverages page.

    Engineering works on Europarc and Pyewipe

    A machine shop on Europarc or Pyewipe taking a larger unit sends its machine tools, presses, benches and racking over in a set order. See our industrial sector page.

    Behind the offshore wind fleet

    Maintenance for the North Sea wind farms runs from the town, and the buildings behind that fleet move test rigs, machine tools, handling gear and racking. See our power and renewables page.

    Process plant west of town

    Along the bank, pumps, motors, skid units and smaller tanks move when a plant is reorganised, with drain down left to your people and the programme built to the permit window. See our chemicals sector page.

    Workshops on the dock estates

    Firms on the dock estates take different buildings as contracts turn over, moving workshop plant, test gear, spares racking and office contents with them. See our maritime sector page.

    College and hospital departments

    Teaching workshops and hospital departments across the borough move laboratory and test equipment when a building is refurbished, with dates in the holidays. See our education and healthcare and pharma pages.

    Access and planning for a factory move in Grimsby

    Points we check on most Grimsby relocations:

    • Wind off the estuary. Little breaks it between the water and the working areas, so each lift is set against the crane chart and the sail area of the machine.
    • A receiving building ready on the date. Floor finished, bases cured, power and air run, and a clear way in for every item before a machine is booked onto a lorry.
    • How each machine leaves the old works. Door widths, internal headroom, the yard and whether a roof panel can come off decide the method, and the answers go on the asset register.
    • The slab at both addresses. Skates and jacks concentrate a heavy load, and yards along the bank stand on made ground, so the crane position outside is checked as closely as the floor inside.
    • Road space and oversized items. Where a load-out needs road or footway space, we arrange the traffic management and closure with North East Lincolnshire Council, or North Lincolnshire Council at Killingholme and Ulceby. Abnormal loads are notified where needed.

    Keeping production going during the move

    A relocation can be split so output carries on. The lines you can spare go first and are making product at the new address before the rest follows. Where a machine cannot stand idle mid-week, its extraction goes into a weekend or a booked shutdown. On a cold store the sequence follows the temperature, so the plant holding the rooms is last out and first back in.

    Handing back the old unit and signing off the new floor seldom fall together. Storage covers the gap, and equipment comes out once the bases have cured. Anything you are not keeping goes for sale or disposal while the crew is there.

    Postcodes and areas we cover

    We cover every DN postcode around the town and the bank:

    • Grimsby: town centre, the Fish Docks, Pyewipe, Grange, Nunsthorpe, Scartho, Weelsby and Europarc
    • Coast: Cleethorpes, New Waltham, Humberston and Tetney
    • The bank, west and north: Great Coates, Healing, Stallingborough, Immingham, Habrough, Ulceby and North and South Killingholme
    • Wider area: Laceby, Louth, Caistor, Brigg, Barton-upon-Humber and Scunthorpe

    We relocate factories right across the UK and into Europe.

    Why Grimsby firms choose Synergy Lifting for factory relocation

    • Known on the Grimsby estates. Machinery installs and factory moves make up much of our work on Europarc, Pyewipe and the estates behind the dock road.
    • Every item numbered before anything is unbolted. The asset register gives each machine a number, a weight, a route out and a position waiting at the new site.
    • The whole move sits on one order. Craneage, riggers, lorries and the fitters who set each machine on its base all come from us, under one programme.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a factory relocation works

    1. Send both addresses, a rough machine count and the date production has to run again.
    2. We walk both buildings and write up the asset register. Smaller moves are priced the same working day from a desktop survey.
    3. Back comes a quote and a programme in move order, with method statements, risk assessments and lift plans.
    4. Our crews extract each machine, pack it and haul it to the new site in its planned slot.
    5. Each machine goes down on its base, is levelled and set to line, then handed over for recommissioning.

    Common questions

    We are moving a cold store. When does the refrigeration plant go in?

    Compressor and chiller packs come out with everything else and go back on prepared bases for your refrigeration contractor. They go in before the line equipment, so the rooms reach temperature before stock arrives.

    What if the wind gets up on the day of a crane lift?

    Limits come from the crane chart and the sail area of each machine, and we agree at survey which items can wait. If the forecast turns, the moves inside carry on and the lifts follow.

    Can we keep producing while we move?

    In most cases, yes, for part of the plant. We move the lines you can spare first and get them running at the new site, then bring the rest across. It means more visits, and it keeps output going while the move is under way. We tell you at survey which parts can overlap.

    How are disconnection and recommissioning handled?

    We agree who does what at survey and write it into the programme. It is a mix of our crew, your maintenance team and the equipment manufacturers, and everyone knows their part before the first machine moves. Recommissioning is done with your engineers or the manufacturer.

    Get a quote for factory relocation in Grimsby

    Send both addresses, a rough machine count and the date production has to restart, and we will set out what the move involves.

    We also provide factory relocation in Hull, Lincoln, Doncaster and York. See all the factory relocation locations.