Plant room strip out in Bournemouth and across Dorset

Estates teams in the town’s hotel and conference buildings call us in, with facilities managers in health premises, landlords letting offices near the centre, and engineering firms replacing energy centre boilers. The old units have to leave a building that keeps trading, with the replacement already on order. We break the redundant mechanical and electrical plant down, clear it from site and set the new units level on their bases, inside the M&E contractor’s programme.

Enquiries reach us from Bournemouth, Poole, Christchurch, Hurn, Ferndown, Wimborne and Ringwood, out to Swanage, Wareham, Blandford and Dorchester. Photographs of the room and the way out carry a desktop survey, with the price back the same working day. Night, weekend and shutdown shifts are arranged where a building needs them.

What a strip out covers

A strip out takes boiler and calorifier sets, chillers and condensers, air handling units, pump and pressurisation skids, tanks, generators, transformers and switchgear, with the pipework and steelwork around them. Each goes down to pieces the route will take. The new units land square on their bases, and the M&E contractor’s engineers take over for pipework, power and commissioning.

What comes out of a Bournemouth plant room

Plant Where it sits How it comes out
Boilers, calorifiers and flues Cellars in older seafront buildings Burner and flue off, shell parted cold, wheeled out
Chillers and condensers Roof decks and rear compounds Picked whole from a closed street, or coils off first
Air handling units Roof housings and high-level plant rooms Casings unbolted, reduced to fan, coil and panel
Pumps, pressurisation sets and tanks Tank rooms, risers and basement corners Toe-jacked off the plinth and skated out
Generators, transformers and switchgear Switchrooms and external enclosures Gantried to the doorway, cubicles parted at their joints

A survey turns on doorways, stairs and hatches. The unit that sets the method is the one boxed in worst, and weight has little to do with it. The rest is on the plant room strip out service page.

Contact us

Get In Touch

Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.

    Where we work in and around Bournemouth

    The work divides between the seafront and the estates inland.

    Cliff-top hotels and conference buildings

    Worn boilers come up out of cellars below the cliff and chillers off flat roof decks, in buildings still letting rooms. See our HVAC sector page.

    Energy centres on the Poole and Ferndown estates

    Boiler houses serving a production floor give up their plant in a planned stop. See our industrial sector page.

    Offices and mixed use blocks around Lansdowne

    Basement boilers and roof chillers leave blocks with tenants on the floors between, on a sheeted route.

    Health buildings across the conurbation

    Heating and cooling cannot drop out of a hospital, so new units are proven before the old ones leave. See our healthcare and pharma page.

    Engineering and electronics units at Hurn

    Compressors and process cooling plant leave low, crowded rooms on the business parks by the airport. See our aerospace sector page.

    University, college and school buildings

    Boiler and air handling changes on the education estate fall in a vacation window with a hard end date. See our education sector page.

    Access and planning for a Bournemouth plant room strip out

    A Bournemouth quote waits on these five:

    • Street space and lay-down. Service yards behind the cliff-top buildings are small and sloping, which puts the crane on the road at the front. Traffic management and closures go in with Bournemouth, Christchurch and Poole Council, or Dorset Council at Ferndown.
    • The hours the building will give. Hotels, venues and let offices trade through the work, so access windows, noise limits, a protected route and the lift we take are settled with the building manager first.
    • How far each unit strips down. Casing joints, flanges and boiler sections give somewhere to part it, and what the heaviest piece weighs then sets whether a crane comes or gantries and chain blocks do it.
    • What the route stands on. A unit on skates and jacks lands on a few small contact points, so cellars inside, and sand, made ground and harbour fill outside, are proved.
    • Roof route or internal route. The money moves between the two routes. Lifting from the road buys a machine and a closure for the day. Coming down inside buys shifts, which the building gives up slowly.

    Before anything is lifted

    Three sign-offs belonging to other trades land before our crew arrives. Isolation, drain down and lock-off are the M&E contractor’s, and they reach us in writing before anything is cut. Refrigerant is recovered by an F-gas certified engineer, and our dates sit behind that certificate. Asbestos sits with the refurbishment and demolition survey, and with the licensed contractor who clears and certifies the room.

    All three dates are asked for while the job is being priced, and our crew books in behind the last of them. Where the seafront season pins one end of the window and a delivery date the other, we say at survey which is squeezing harder.

    Postcodes and areas we cover

    We cover every BH postcode and the districts around Bournemouth, Poole and Christchurch:

    • Bournemouth: town centre, the seafront, Lansdowne, Boscombe, Southbourne, Winton and Kinson
    • Poole and the harbour: Poole, Parkstone, Branksome, Hamworthy, Upton and Lytchett
    • East and north: Christchurch, Hurn, Ferndown, Wimborne, Ringwood and Verwood
    • Wider area: Swanage, Wareham, Blandford, Dorchester, Salisbury and Southampton

    We strip out plant rooms right across the UK.

    Why Bournemouth firms choose Synergy Lifting for plant room strip out

    • Occupied buildings are normal work. Hotels, conference buildings, offices and health premises across the conurbation trade on while their plant rooms are emptied.
    • Split points settled before the price. Our survey fixes where each unit comes apart and how it travels, so the quoted figure rests on a worked method.
    • Outside and inside come from one team. Our operator runs the crane, our riggers work the room, our wagons take the old units away and our crew beds the replacement down.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a plant room strip out works

    1. List the old plant and the new, say which level the room is on, and send photographs of the way out.
    2. A survey settles the route out and the split points, which between them fix the heaviest piece.
    3. Next come the method statement, risk assessment and lift plan, with our days booked behind the M&E contractor’s isolations.
    4. The plant travels out along a protected route and goes onto our wagons.
    5. The replacement lands on its bases, is levelled and shimmed, then goes over for connection.

    Common questions

    The chiller is on a roof deck above a narrow cliff-top yard. Where does the crane stand?

    On the road at the front in most cases, with a closure and marshalling keeping the pavement clear, because the yard behind is small and sloping. Otherwise it is parted on the deck and comes down inside.

    Tenants sit above our town-centre cellar boiler room. How does the old boiler get out?

    In pieces the stair or pavement hatch will pass. Burner and flue come away first, the shell is parted cold at its sections, and the pieces skate to the loading door.

    Can the building stay open while the plant comes out?

    Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.

    Who isolates and drains the plant before you start?

    Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.

    Get a quote for a plant room strip out in Bournemouth

    Send photographs of the room and the way out, and tell us what the plant is, which level it sits on, and whether new units follow it in.

    We also provide plant room strip out in Southampton, Portsmouth, Bristol and Reading. See all the plant room strip out locations.