Contents
Plant room strip out in Coventry and across Warwickshire
When a Coventry plant room is worn out, we hear from hospital and university estates teams, schools and colleges, landlords in the centre, and firms with boiler houses on the northern estates. We remove the old mechanical and electrical plant and set the replacement on its bases, to the programme your M&E contractor is running.
Jobs come from Foleshill, Exhall, Binley, Canley and Tile Hill, with Bedworth, Nuneaton, Rugby, Kenilworth and Leamington Spa further out. Plant for a building in the centre travels in off the ring road, so the approach is part of the survey. We price from pictures of the plant room and wherever a lorry could pull in beside it within the working day, and can build in evening, weekend or shutdown working.
What a strip out covers
Our riggers break the heating, cooling, air handling and electrical plant into pieces, rig each one to the loading point and take it away with the redundant pipework and support steel. The new plant follows the same route in, and we land and level it on its bases ready for connection.
What comes out of a Coventry plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Gas-fired boilers and hot water calorifiers | Boiler rooms below offices and public buildings | Burners and casing off, heat exchanger released in its built sections |
| Air-cooled chillers | Flat roofs over teaching and laboratory blocks | Craned off whole, or reduced to fans, coils and frame for the goods lift |
| Air handling units | Plant decks above wards, labs and offices | Unbolted at the factory joints and wheeled out on dollies |
| Standby generators and day tanks | Data centre compounds and basement generator rooms | Jacked onto skates and drawn out through the louvre opening |
| Transformers and LV switchboards | Substation rooms on the business parks | Switchboard split into shipping sections, transformer skated to the door |
| Pipework and hangers | Risers and ceiling voids | Cut cold into lengths that fit the lift car |
We plan around the unit that is worst to get to the lorry, and that is not always the heaviest thing in the room. See our plant room strip out service page.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Coventry
In Coventry the research parks and the public estate sit alongside older works and newer warehouses.
The technology parks around Ansty
Air handling and process cooling plant leaves laboratory buildings on the parks at the city edge while the rooms beside them stay in use, to vibration and cleanliness limits agreed first. See our aerospace sector page.
Generators and cooling in the data centres
Generators, UPS modules and chillers leave data centres inside an outage window fixed in advance, on routes kept well away from the live server halls. See our data centre infrastructure page.
Campus and clinical estates
Chillers and air handling units come out of the city’s university and hospital buildings while lectures and clinics carry on, in hours the estates team books. See our education and healthcare and pharma pages.
Rooftops at Foleshill and Exhall
Older works north and east of the centre replace rooftop units and the boilers that heat their shop floors, with tight yards to stand a crane in. See our HVAC and industrial sector pages.
Warehouses by the M6 and M69
Distribution units near the motorway junctions swap heating plant, switchgear and sprinkler pump sets when an occupier changes. See our construction sector page.
Access and planning for a Coventry plant room strip out
On a Coventry survey we look at:
- Roof or stairs. A crane from the street costs a machine and a closure. Carrying plant down inside means lift bookings, protected floors and many more hours for the crew.
- Floor loads. A heavy unit on skates sits on a few small points, so we check every slab and duct cover on the route and mat them where needed.
- People still in the building. We agree hours, noise, the lift and a protected corridor with the building manager. On the research parks the heavy moves go when tests in the rooms next door are paused.
- Size of the pieces. Units split at their panel and flange joints, and whether a crane comes rests on the biggest piece left.
- Standing room, closures and lay-down. Short, tightly curved ring road slip roads limit which crane reaches a central site, and when. We apply to Coventry City Council or Warwickshire County Council for the road closure and traffic management, and find somewhere to set the old plant down.
Before anything is lifted
Nothing of ours starts until three other trades have signed off. First each system, Ansty laboratory or Foleshill boiler room alike, is isolated and drained with its locks on, signed for on paper by the M&E contractor, and an F-gas certified engineer takes off any refrigerant.
Any asbestos in the building is a licensed contractor’s job, finished and certified before our crew goes in. We set our crew and crane dates behind all three, and the quote names who covers each.
Postcodes and areas we cover
We take on plant room work in every CV postcode and the districts around the city:
- Coventry: city centre, Foleshill, Longford, Radford, Binley, Canley, Tile Hill and Earlsdon
- North: Exhall, Bedworth, Ansty, Bulkington and Nuneaton
- South and east: Kenilworth, Warwick, Leamington Spa, Rugby and Southam
- Wider area: Birmingham, Solihull, Coleshill, Hinckley and Stratford-upon-Avon
We strip out plant rooms right across the UK.
Why Coventry firms choose Synergy Lifting for plant room strip out
- Laboratory and teaching buildings are familiar ground. Crane work on the technology parks and the campus and hospital estates already takes us into plant rooms that stay in service.
- Rooftop plant on the older estates is regular work too. Units come off works roofs at Foleshill and Exhall as part of our lifting there.
- One order for the lot. We bring the crane and riggers, take the old units away on our own lorry and set the new plant on its bases.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Coventry plant room jobs can draw on these:
How a plant room strip out works
- Note the plant, the floor or roof it sits on, and photograph the route to the lorry, lift car included.
- Walking the route, we decide where each unit splits to suit the lift car.
- Next come the lift plan and RAMS, with our dates booked for after the plant is isolated.
- The crew takes the old plant apart and gets it off site.
- Your M&E contractor connects the replacement once we have levelled it on its bases.
Common questions
Our replacement chillers reach the Foleshill site before the old ones are out. Where do they wait?
In the yard, protected and clear of the crane, if there is space. Where the yard is full, delivery is timed to our lift day and each unit goes from the lorry straight to the roof.
The crane has to stand on a street near the ring road. Who sorts out the closure?
We do, through Coventry City Council, with signs, barriers and marshals supplied as part of the job. The council needs notice, so send the address early.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Coventry
- Phone: 024 7718 2449
- Email: coventry@synergy-lifting.co.uk
Say what the plant is, which floor or roof it is on and whether it is being replaced. Pictures of the room, the lift and the ring road approach are what we price from.
We also provide plant room strip out in Birmingham, Leicester, Wolverhampton and Northampton. See all the plant room strip out locations.