Contents
Plant room strip out in Hartlepool and across County Durham
In Hartlepool the work comes from the port and the yards, the process plants south of the town, the estates inland, and the town centre and marina. The plant is usually boilers and calorifiers, chillers, air handling units, pumps and tanks, and switchgear, transformers and generators, and the same crew puts any replacement down on its plinth, dockside or inland. We work to the M&E contractor’s dates, beside their people.
We cover Hartlepool, the Headland and Seaton Carew, out to Greatham, Elwick, Billingham, Wynyard and Peterlee, with our nearest depot at Darlington. A plant schedule and pictures of the room, its doors and any dock gate on the way out bring a quote back the same working day. Out-of-hours, weekend and shutdown working is arranged where the building needs it.
What a strip out covers
We reduce each item until the route will carry it, rig it out and take it away. Pipework, electrical work and commissioning stay with your M&E contractor.
What comes out of a Hartlepool plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Condensers and chillers | Roof plinths and yard compounds | Craned off where a standing position works, or broken down and carried out inside |
| Boilers and calorifiers | Ground floor rooms and basements | Burner and casing off, shell split at its sections, rolled out |
| Air handling units | Roof decks and internal rooms | Coils drawn out, casing unbolted frame by frame |
| Pumps, tanks and pressurisation sets | Tank rooms, basements and risers | Toe jacked off the plinth and skated to the door |
| Switchgear, generators and transformers | Switchrooms and energy centre bays | Rolled out on a low gantry, craned onto the wagon |
| Redundant pipework and support steel | Through the room and the risers | Cold cut to lengths that turn the corners |
The awkward item decides the method, not the heavy one, and they are rarely the same unit. See our plant room strip out service page for more.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Hartlepool
Where the calls come from in and around the town:
Workshops and stores in the port and yards
Packaged boilers, compressors and standby sets come out of workshops and welfare blocks with one door and little room beside the unit. Yard rules and vessel movements set the timings. See our maritime page.
Energy centres at Oakesway, Sovereign Park and Wynyard
Boiler plant, air compressors and circulating pumps leave these rooms only when the line is down, so the job follows the shutdown. See our industrial sector page.
Town centre and marina offices
Rooftop cooling and basement boilers come out of buildings with tenants still in them, one loading bay and one goods lift between everybody. See our HVAC page.
Hospital, college and school buildings
Air handling units, chillers and boilers leave buildings that stay open or reopen on a fixed date, on hours the estates team decides. See our healthcare and pharma and education pages.
Coastal power and grid buildings
Outage work at the power and grid sites along this coast brings out standby sets, transformers and switchgear, inside a hand-back time that holds. See our power and renewables page.
Access and planning for a Hartlepool plant room strip out
What the survey has to answer before a strip out is priced:
- Weight on the floors we cross. The load on a skate sits on a very small patch, so basements, voids and slabs are checked, and the made ground of the docks too.
- Where the crane and the plant stand. Reaching over the building means giving up part of a road or car park, and the lay-down has to hold the old unit and the new one. In the town the application goes to Hartlepool Borough Council, and in Billingham to Stockton-on-Tees, and we sort the traffic management and road closure.
- Crane from the street, or carry down. A machine reaching roof plant from the street saves days on the stairwells. Plant exposed to the sea gets a wind limit and a fallback day.
- Before the crew is sent. Port and site inductions, the access window, our lift booking and the route protection are all in place.
- Split points. Large plant separates at its panel and flange joints, and how far we take it down fixes the heaviest piece.
Before anything is lifted
Work that belongs to other trades comes first, and our dates sit behind it. Your M&E contractor handles the isolation, the drain down and the lock-off, and puts it in writing ahead of us starting. Refrigerant is taken off by an F-gas certified engineer, and we see the certificate before a cooling system is touched. Asbestos is for a licensed contractor, working from the asbestos survey, and the space is certified before we go in.
Those dates go into the programme at quoting stage alongside ours, so everybody sees the sequence.
Postcodes and areas we cover
The TS postcodes in and around the town, including:
- The town: the centre, the Headland, the marina and docks, West Park, Rift House and Owton Manor
- Industrial ground: Oakesway, Sovereign Park, Graythorp and Seal Sands
- Coast and south: Seaton Carew, Greatham, Billingham, Stockton-on-Tees, Middlesbrough and Redcar
- Inland and north: Hart, Elwick, Wynyard, Sedgefield, Blackhall, Peterlee, Seaham and Durham
We strip out plant rooms right across the UK.
Why Hartlepool firms choose Synergy Lifting for plant room strip out
- The way out is protected and made good. Lift cars, corridor floors and door frames are covered before the first piece moves, and put back once the room is clear.
- We know the town. We already work in its port workshops, estate energy centres, hospital and college buildings and offices.
- Removal and replacement together. Taking the old plant out and landing the new one are both on our order, crane included.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Hartlepool strip outs pick up one or two of these as well:
How a plant room strip out works
- First we need the plant list, old and new, where the room sits and photographs of the way out.
- Then a survey, to fix the route out and where each unit separates.
- Next we issue a lift plan with the method statement and risk assessment, and tie our start to the isolation dates.
- The plant is broken down, moved out along the agreed route and loaded for removal.
- Replacement plant is trued up on the plinth, with any sea-wind hold already allowed for, and left ready to connect.
Common questions
Our energy centre runs production. When can the old boilers come out?
Inside a shutdown, with the crew sized to the window between your last shift and restart.
How soon can somebody look at a plant room in the town?
Photographs and a plant schedule price most jobs the same working day. Where the way out looks awkward, somebody comes and walks it with you before a price goes out.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Hartlepool
- Phone: 01642 843 216
- Email: hartlepool@synergy-lifting.co.uk
Say what the plant is and where it sits, and whether anything new is going in. A few pictures of the room, the door and the quay or street outside are enough to start.
We also provide plant room strip out in Middlesbrough, Teesside, Durham and Sunderland. See all the plant room strip out locations.