Contents
Machine movement in Middlesbrough and across Teesside
We move production machinery in and around Middlesbrough: out of one building and into another, across a factory floor to make room for a new line, or off a lorry and onto a prepared foundation. On Teesside the work splits two ways. In the chemical and process cluster at Wilton, Billingham and Seal Sands it is process equipment inside permit-controlled areas, planned around a shutdown window that was fixed months ago. On the engineering and manufacturing estates — Skippers Lane, Riverside Park, Preston Farm — it is presses, machine tools and line equipment sitting in buildings that were finished around them.
Our depot is at Darlington, half an hour from most Teesside sites. That counts for more on a machine move than it does on a crane hire job, because this is rarely one lift. It is several days of our own people, gantries, skates and jacking equipment on your floor, and being close by keeps a hold-up down to an hour instead of a day.
What a machine move involves
It can be a single machine or a whole line: disconnection, rigging and extraction, transport, then positioning, levelling and setting down on its mounts at the other end. Some jobs are a crane and a lorry. Most are the awkward part in between — getting a 40 tonne press through a door that is 200mm too narrow, or across a floor that will not take a point load. We can usually quote from a desktop survey the same working day, and when a machine has failed and the line is standing we can often get someone on site the same day to look at it.
What we move in Middlesbrough
| Equipment | Where it usually is | How it moves |
|---|---|---|
| Presses, machine tools and CNC | Engineering works and fabrication shops | Jacked, skated and gantried out; crane only where there is room to stand one |
| Process vessels, autoclaves and reactors | Chemical and pharmaceutical plant | Crane in and out, rollers and skates to the final position |
| Transformers, switchgear and generators | Substations, switchrooms and energy centres | Low-headroom gantry and skates, often through a single doorway |
| Conveyors, packing and line equipment | Food, drink and packaging factories | Sectional dismantling, moved and rebuilt in place |
| Complete production lines | Anywhere a plant is being reconfigured or consolidated | Sequenced over days or weeks around production |
Send us the machine weight, its dimensions, where it is now and where it needs to be, and we will tell you what it takes. Our machine movement page explains the process in more detail.
Contact us
Get In Touch
Please leave a few details and a member of our machine movement team will be in touch to discuss your requirements in more detail.
Where we work in and around Middlesbrough
Machine moving on Teesside comes from a handful of places, and each one changes how the job is planned.
Chemicals and process
Wilton, Billingham and Seal Sands hold upper-tier COMAH sites, and on those the lift itself is the short part of the job. The move runs on the operator’s permit system and the shutdown calendar, which is set out under access and planning below. See our chemicals sector page.
Engineering and fabrication
Skippers Lane, South Bank and the older works along the river run machine tools, presses and fabrication plant in buildings that have often outlived two generations of the equipment inside them. The constraint is almost always the route out: door widths, internal headroom, and whether a roof panel can come off. See our industrial sector page.
Thornaby, Preston Farm and the newer estates
Preston Farm, Teesside Industrial Estate and Riverside Park hold lighter manufacturing, distribution and precision engineering. Better access, tighter programmes — these are the moves that have to happen over a weekend and be running Monday.
Food, drink and packaging
Line equipment, fillers, packing machinery and refrigeration plant, moved around hygiene requirements and a production schedule that does not stop for long. See our food and beverages page.
Offshore wind and the energy supply chain
The fabrication halls and workshops serving the estuary’s offshore wind and energy work bring large, heavy, awkward equipment into buildings that are still being fitted out. See our power and renewables page.
Precision and automotive manufacturing
Eaglescliffe, Newton Aycliffe and the Tees Valley’s precision manufacturers run moulding, pressing and assembly equipment where the final position has to be set to a measured tolerance and proved before the machine is handed back. See our machine delivery and installation service.
Access and planning for a machine move in Middlesbrough
Every job is different, but the same handful of things decide a Teesside machine move:
- Getting it out, not just lifting it. On older Teesside works the machine went in before the wall did. We survey the route first — door and gate widths, internal headroom, columns, floor levels and whether a roof panel or cladding sheet can be removed and reinstated — because that decides the method and usually the price.
- Floor loading and made ground. Skates and jacking concentrate a very large load into a small footprint. We check slab capacity and spread the load where the figures call for it. Outside, the reclaimed and made ground along the river means a crane pad gets designed to the bearing pressure it will actually see.
- Permits on the COMAH sites. In the chemical cluster the paperwork is the programme. A move inside a live process area runs on the operator’s permit to work: mechanical and electrical isolations with lock-off, blanking and line-breaking certificates, gas-free and confined space clearance before anything is opened or cut, a separate hot work permit for grinding or burning, exclusion zones agreed with the area authority, site-specific induction and escorted access. Some of those certificates are good for a single shift only, so the sequence is built around when they can be issued and reissued. We plan from those constraints rather than asking the site to work around us.
- Shutdown and weekend windows. Most of this work happens when production stops. We plan the set-up and de-rig time either side of the window, which is the part most often underestimated.
- Road closures. Where a lift or a load-out needs part of a road or footway closed, we can arrange the traffic management and road closure with Middlesbrough Council, or with Redcar and Cleveland or Stockton as the site requires.
Abnormal loads: getting the machine off site and onto the road
A good deal of Teesside machinery is outside normal haulage limits the moment it is on a trailer. The movement becomes an abnormal load once the vehicle and load together pass 44,000kg gross, 2.9m in width or 18.65m in length, and from there it runs under the Special Types General Order: STGO Category 1 up to 46,000kg, Category 2 up to 80,000kg and Category 3 up to 150,000kg gross.
In practice that means notice periods, and the notice periods decide your date:
- Two clear working days to the police for a load over 2.9m wide or 18.65m long.
- Five clear working days to the highway and bridge authorities once the gross weight passes 80,000kg, submitted through ESDAL so that every structure owner on the route is notified and can object or set conditions.
- A Special Order for anything over 150,000kg or wider than 6.1m. That one is measured in weeks, and it is the one that catches programmes out.
The way out of Middlesbrough is usually the A66 east to west, the A19 or the Newport Bridge to cross the Tees, the A174 Parkway for the Wilton and Lackenby works, and the A19 or A1(M) for onward movement. Which of those a load can actually use comes down to its height, width and swept path more than its weight — and on the older riverside estates the first two hundred metres, the gatehouse, the corner and the railway bridge, rule out more options than the trunk road ever does. We establish all of that at survey stage and get the notifications in, ourselves or with your haulier, before a date is promised.
Postcodes and areas we cover
We cover every TS postcode. These are the industrial areas the work usually comes from:
- Middlesbrough: Middlehaven, Riverside Park, Cargo Fleet, Skippers Lane, Mandale Park, South Bank and Grangetown
- Redcar and Cleveland: Wilton, Lackenby, the South Tees site, Grangetown works and the Redcar estates
- Stockton borough: Thornaby, Preston Farm, Teesside Industrial Estate and Eaglescliffe
- North of the river: Billingham, Seal Sands, Port Clarence, Haverton Hill and Hartlepool
- Wider Tees Valley: Newton Aycliffe, Aycliffe Business Park, Darlington and the A1(M) corridor
Beyond Teesside we move machinery across the UK and into Europe. See all the areas we cover.
Why Middlesbrough firms choose Synergy Lifting for machine movement
- We survey the route before we price it. The quote is built on how the machine actually comes out, so the figure you get at the start is the figure you pay at the end.
- Cranes and machine moving under one contract. The crane outside and the skates, gantries and jacking gear inside are ours, run by our own operators, so the two halves of the job are planned as one sequence with one company answerable for it.
- We can react fast when something has broken. Much of this work is unplanned: a machine fails, the line stops, and it has to come out now. Darlington is half an hour from most Teesside sites and we can often be there the same day.
- Permit and shutdown work is routine for us. Isolations, exclusion zones, night and weekend working, and a sequence that cannot slip without costing someone else money.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than machine movement
Most Middlesbrough machine moves pull in one or two of these as well:
How a machine move works
- Tell us the machine weight and dimensions, where it is now, where it is going and the dates. Photographs of the machine and the route out help more than anything else. If it is a breakdown and the line is down, say so on the call and we will treat it that way.
- We quote, usually the same working day, from a desktop survey. Anything complex gets a site visit first so the route out is confirmed on the ground.
- We produce the method statement, risk assessment and lift plan, and agree the sequence, the permits and the windows with your team.
- We disconnect where that is in scope, rig, extract, transport, and position the machine on its foundation or mounts.
- We set down, level and hand over, with the machine where your installation or commissioning engineers need it.
Common questions
The machine will not fit through the door. Is that the end of it?
Almost never. Most of what we do on Teesside involves a machine that cannot come out the way it went in. The options are usually to strip it into sub-assemblies and rebuild it at the other end, to take out a roof panel or a section of cladding and lift vertically, or to remove a door frame and reinstate it afterwards. We work out which of those is cheapest for you and tell you why.
How quickly can you get to us?
For planned work we quote the same working day from a desktop survey and mobilise to suit your window. For a breakdown, where the machine has failed and production is standing, we can often get someone on site the same day to look at it and be moving equipment within a day or two, depending on what the move needs. Being at Darlington rather than at the other end of the country is most of the reason that is possible.
Can you work inside a COMAH site at Wilton or Billingham?
Yes, and it is a large part of what we do here. On those sites the lift is short and the preparation is long, and the move has to fit the operator’s permit to work and the shutdown window. Tell us the site and the window and we will plan to it.
Do you disconnect and reconnect the machine?
We disconnect and make safe mechanically, and we position the machine precisely enough for your engineers to reconnect and commission. Electrical and control reconnection, and anything needing the manufacturer’s sign-off, we leave with your own people or your installer, who hold the qualifications for that part.
Will you satisfy our procurement and prequalification checks?
Normally yes, and we can send the pack before you ask for it. We are SSIP approved and a Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association. Operators are CPCS and NPORS carded, lifts are planned to BS 7121 by an appointed person, and equipment is inspected and thoroughly examined under LOLER and PUWER. Insurance certificates, method statements, risk assessments and lift plans come as standard with the job.
How much disruption should we plan for?
Less than most people expect for a single machine and more than most expect for a line. A single machine is often a day or two. A line move is sequenced over weeks, and the honest answer depends on how much can be done while the rest of the plant keeps running. We will tell you at quoting stage which parts have to happen in a shutdown.
Get a quote for machine movement in Middlesbrough
- Phone: 01642 843 216
- Email: middlesbrough@synergy-lifting.co.uk
Send the machine weight, its dimensions, where it is now and where it needs to go, and we will come back the same working day. We also provide crane hire in Middlesbrough, and machine movement across the UK — see the machine movement service.
We also provide machine movement in Teesside, Hartlepool, Darlington and Durham. See all the machine movement locations.