The replacement boilers or chillers have a delivery date, and the old ones are bolted down in a room nobody designed for getting them out of. We break the old plant down, get it out whichever way the building allows, and land the new units. Most of it comes from health buildings, colleges and city-centre offices, and from boiler houses on the industrial sites east along the coast.

We cover Swansea, Morriston, Llansamlet, Fforestfach and Gorseinon, and reach Neath, Port Talbot, Llanelli and Carmarthen. Send us photos of the plant and the door it has to reach, and we will come back with a survey and price the same working day. Evening and weekend shifts are normal here, because the building keeps working around the plant room.

What a strip out covers

That means chillers and condensers, boilers and calorifiers, air handling units, switchgear, transformers, generators, tanks, pumps and pressurisation sets, and the pipework around them. Each unit is cut down until it clears the route and goes out on a wagon. The replacement comes in behind it and is set level. Your M&E contractor sets the programme and keeps the pipework, the wiring and the commissioning.

What comes out of a Swansea plant room

Plant Where it sits How it comes out
Chillers and dry air coolers Roof decks and yard compounds Craned off where one can stand, or split into modules
Gas-fired boilers and calorifiers Ground floor and basement boiler houses Burner and shell parted, then rolled to the door
Air handling units High level plant rooms and roof enclosures Opened at the section joints and carried out in panels
Switchgear, generators and transformers Generator rooms, substations and energy centres Skated out on low-headroom gear and winched to the wagon
Redundant pipework, valves and support steel Wall runs, ceiling voids and riser shafts Cold cut to lengths the stair or goods lift will take

The price depends more on how hemmed in a unit is than on what it weighs. More on our plant room strip out service page.

Contact us

Get In Touch

Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.

    Where we work in and around Swansea

    The work splits across five sorts of building.

    Energy centres behind the coastal works

    Steam raising plant, compressors and process cooling leave the boiler houses serving production between the city and Port Talbot, on dates the maintenance window sets. See our plastics and metals and chemicals pages.

    Wards, clinics and the health estate

    Heating and cooling plant is replaced in buildings that keep their doors open, so new units are proved before the old ones come out. See our healthcare and pharma page.

    Basements and roofs at SA1 and the waterfront

    Generators, chillers and air handling plant leave the offices and mixed use blocks beside the dock estate, lifted on an evening or Sunday while the floors below stay let. See our maritime page.

    Teaching and laboratory buildings between terms

    Air handling units, laboratory services and old boiler plant leave college and university buildings in the vacation, the reopening date fixed. See our education page.

    Rooftop plant on the Enterprise Park and Plasmarl

    Packaged units, condensers and boiler plant come off the trade and manufacturing units filling those estates, most with a yard deep enough for a crane. See our HVAC and industrial pages.

    Access and planning for a Swansea plant room strip out

    Five things we need answers to first:

    • People still in the building. The floors around the plant room stay in use, so the building manager sets our hours, the noise limits and the route we protect.
    • How far the plant breaks down. Sectional boilers come apart at the joints and air handling units at their panels, and the weight of the largest remaining piece settles whether a crane is worth a hillside closure.
    • Crane or carry. A crane outside means a day’s hire and a road closure. Taking it down inside means lift time, floor protection and more hands.
    • Ground and floors. Reclaimed made ground runs through the dock estate and SA1, and plant on skates bears on a very small area, so we check the crane standing and every floor on the route.
    • Closures and trunk roads. Where a lift takes part of a street, the traffic management and closure go through the City and County of Swansea, Neath Port Talbot or Carmarthenshire. The M4 and the A483 are Welsh Government trunk roads, and routing is settled at quoting stage.

    Before anything is lifted

    Some of the work before ours is other people’s. Shutting off, draining and locking off belong to your M&E contractor, along the coast or in town, with a signed isolation certificate to us before any cutting. Any system with refrigerant in it is emptied first by an F-gas certified engineer. If there is asbestos, the survey and the licensed removal are finished before we go in.

    Our dates go in after those, and the quote shows who is responsible for each. With the paperwork in hand, the crew can start the day it arrives.

    Postcodes and areas we cover

    We cover every SA postcode around the city, including:

    • SA1 to SA3: the centre and the SA1 waterfront, Sketty, Uplands, Mumbles and the Gower
    • SA4 to SA7: Gorseinon, Loughor, Fforestfach, Waunarlwydd, Morriston and Llansamlet
    • SA8 to SA13: Pontardawe, Ystradgynlais, Neath, Briton Ferry and Port Talbot
    • SA14 to SA31: Llanelli, Burry Port, Ammanford, Llandeilo and Carmarthen

    We strip out plant rooms right across the UK.

    Why Swansea firms choose Synergy Lifting for plant room strip out

    • Estates work. Health, teaching and office plant rooms in Swansea are stripped out on hours the estates team sets, with the route protected.
    • Shutdown dates we work back from. On the industrial sites east of the city our crews plan to site rules and the booked outage window, working back from the date production restarts.
    • No separate crane firm. The crane and operator are ours, as are the riggers, the wagon for the old plant and the crew that lands the new.
    • Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.

    How a plant room strip out works

    1. Give us the plant schedule, the plant room’s floor and photos, whether in town or at Llansamlet.
    2. Surveying the route to the kerb or works yard settles how far each unit comes apart.
    3. The quote follows, naming what other trades finish first.
    4. The lift plan goes out with the method statement and risk assessment, dated around when the plant is isolated.
    5. We cut the plant up, rig it out and load it, then set the new units down ready to connect.

    Common questions

    Can a chiller come off an SA1 roof with wind off the bay?

    Crane work near the water runs to wind limits set in the lift plan, so a blowing shift goes on breaking the unit down inside.

    Can the strip out go inside a shutdown east of the city?

    Yes. Those windows are fixed long before the job, so we work back from the end date to set the removal order and the crane day. Permits and exclusion zones go into the method statement.

    Can the building stay open while the plant comes out?

    Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.

    Who isolates and drains the plant before you start?

    Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.

    Get a quote for a plant room strip out in Swansea

    For a quote we need to know what the plant is, where it is in the building and if new units are going back in. Pictures of the way out and the slope outside help a lot.

    We also provide plant room strip out in Cardiff, Newport, Bristol and Exeter. See all the plant room strip out locations.