Plant room strip out in Dover and across east Kent
We get the call when a building’s plant has reached the end of its life: in health buildings, schools and colleges, offices by the harbour and energy centres across east Kent. We cut the old boilers, chillers, air handlers and switchgear down to fit the doors and stairs, take them away, and set the replacements down, port traffic allowing, alongside the M&E contractor.
Dover sits between the chalk and the Channel, so a plant room here tends to have one workable standing position. We cover the town with Whitfield, Aycliffe, River and Buckland, the coast through Deal and Folkestone, and Sandwich, Canterbury, Ashford and Thanet. Send photographs of the plant and its route out for a same-day quote. Buildings that stay open get evening, weekend or shutdown shifts.
What a strip out covers
It takes in heating and hot water plant, chillers and condensers, air handlers, pumps and tanks with their pressurisation sets, switchgear, transformers and generators, plus the old pipework and the steel that carried them. Each piece is cut or unbolted down to what the route will pass, rigged out and cleared from site. The new unit goes back in the same way.
What comes out of a Dover plant room
| Plant | Where it sits | How it comes out |
|---|---|---|
| Transformers, switchgear and standby sets | Standby compounds and low switchrooms | Cornered up on jacks and rolled to the loading point |
| Boilers and calorifiers | Cellars and ground floor rooms | Casing and flue off, sections parted and rolled out |
| Chillers and condensers | Flat roofs and caged compounds | Off whole where a crane reaches, or split and brought down inside |
| Air handling units | Roof decks and mid-building rooms | Unbolted at the panel joints and carried out |
| Tanks, with their pumps and pressure sets | Basement tank rooms and risers | Raised off the plinth on a gantry and skated to the doorway |
| Pipework, valves and support steel | Ceiling voids and wall runs | Cold cut to lengths that turn the corners |
We plan around whichever unit has the trickiest route out, and that is rarely the heaviest. Our plant room strip out service page covers the stages.
Contact us
Get In Touch
Please leave a few details and a member of our plant room strip out team will be in touch to discuss your requirements in more detail.
Where we work in and around Dover
Work here comes from the harbour side and from the estates and towns inland.
Buildings working off the harbour
Heating plant, standby sets and switchgear leave freight and office buildings beside the water, in hours that suit the movements around them. See our maritime sector page.
Units at Whitfield, Aycliffe and Sandwich
Compressor rooms, boiler houses and rooftop units on the east Kent estates change with the floor below working, or inside a planned shutdown. See our industrial sector page.
School and college plant rooms, Dover to Folkestone
Boilers and air handling plant leave school and college buildings in the summer break, on a programme written back from the day staff return. See our education page.
Wards, clinics and health centre plant rooms
Cooling and ventilation plant on health sites changes one system at a time, to hours and noise limits the estates team sets. See our healthcare and pharma page.
Older buildings along the seafront
Boilers sit in cellars under the front here, and the pieces come up through stairs and hatches with the stone treads boarded first. See our HVAC page.
Access and planning for a Dover plant room strip out
Survey day answers these before anything is priced:
- A lane or a yard to work from. A lift over the building needs a lane or a slice of yard, plus room to set the old unit down. Kent County Council grants the closure, and we time it to miss the worst of the port traffic on the A20 and A2.
- Crane or stairs. Over the roof the cost sits in the crane day and the closure; inside it sits in crew hours, floor protection and lift bookings. Kerbside ground is scarce between the cliffs and the water, so the standing position is proved first.
- The building carrying on around us. The building manager sets our hours, the noise limit, the route we protect and the goods lift we use.
- How the units break down. Bolted panels and flanged joints mark where it comes apart, and the heaviest split piece shows if a crane is worth a Kent closure.
- Floors and cellars. A unit on skates or jacks bears down on a few small points, so we check cellars, timber floors and made ground.
Before anything is lifted
Other trades finish three jobs before our crew arrives. The M&E contractor makes the systems dead, drains them, locks them off and puts it in writing. An F-gas certified engineer takes off the refrigerant. If the asbestos survey for the refurbishment finds anything, a licensed contractor removes it and certifies the area.
Those dates go into the programme at survey and ours follow them. Pipework, electrical work and commissioning stay with the M&E contractor, and who covers what is written down at quoting stage.
Postcodes and areas we cover
We cover every CT postcode and the east Kent districts around the town:
- Dover: town centre, the port area, Whitfield, Aycliffe, River and Buckland
- The coast: Deal, Walmer, St Margaret’s, Folkestone and Hythe
- North and west: Sandwich, Canterbury, Ramsgate, Margate and Ashford
- Wider area: Maidstone, Tonbridge, Tenterden and the rest of Kent
We strip out plant rooms right across the UK.
Why Dover firms choose Synergy Lifting for plant room strip out
- Planned back from your reopening day. If the building has to be back in use on a fixed date, we start from that date and work backwards.
- Deal, Folkestone and inland. Plant rooms at Deal, Folkestone, Sandwich and Canterbury are handled the same way as one in Dover.
- One order for kerb and plant room. The crane at the kerb is ours, and so are the riggers on the stair, the wagons for the old units and the crew who set the new.
- Qualified and accredited. CPCS and NPORS operators, lifts planned to BS 7121, equipment inspected under LOLER and PUWER, SSIP approved, Constructionline Gold Member, certified to ISO 9001 and ISO 14001, and members of the Construction Plant-hire Association.
More than plant room strip out
Jobs that sit alongside a Dover strip out:
How a plant room strip out works
- We start from the plant details, the floor the room is on, and photographs along the route out.
- At survey the route is walked, roof or inside chosen for the kerbs under the cliffs, and each split marked.
- The risk assessment, method statement and lift plan go out, with our days after the isolations.
- The crew strips the plant down, rigs it out along the protected route and loads it.
- We land and level the replacement around the port traffic, and connecting it is the M&E contractor’s work.
Common questions
Our seafront street holds one vehicle at a time. How do the old and new units swap over?
In an order agreed before the day. The old unit goes onto a wagon, the street clears, and the replacement follows it in. Where one shift cannot take both moves, the swap runs over an evening or a Sunday.
Can a strip out at a Whitfield unit run while the rest of the building works?
Yes. The plant room is fenced off and the route to the door protected, so forklifts and deliveries keep clear. Noisy work and the crane go into a weekend or a booked shutdown.
Can the building stay open while the plant comes out?
Usually, yes. Most of this work happens in buildings that keep running, so the route is protected, the hours are agreed with the building manager, and the heavy moves go at night or over a weekend where that suits everyone. On a heating or cooling system the building cannot lose, the new plant goes in and is proven before the old plant comes out.
Who isolates and drains the plant before you start?
Your M&E contractor, with the isolation, drain down and lock-off signed off in writing before we cut anything. Refrigerant recovery belongs to an F-gas certified engineer and asbestos to a licensed contractor, so we plan our dates around both. We agree at quoting stage who is covering what.
Get a quote for a plant room strip out in Dover
- Phone: 01304 700 758
- Email: dover@synergy-lifting.co.uk
To price it we need the plant list, the floor, whether anything new goes in, and photos out to a Dover kerb a wagon can use.
We also provide plant room strip out in Ipswich, Brighton, London and Cambridge. See all the plant room strip out locations.